- MAPEntrance Ramp closed. Nighttime closure only. The on-ramp to the eastbound I-820 general purpose lanes at Iron Horse Blvd. will be closed. Traffic will be redirected to the next entrance at Rufe Snow Dr.
Entrance Ramp closed. Nighttime closure only. The on-ramp to the eastbound I-820 general purpose lanes at Iron Horse Blvd. will be closed. Traffic will be redirected to the next entrance at Rufe Snow Dr.
Start Time: 2024-06-01T00:30:00.000-05:00
End Time: 2024-06-02T15:00:00.000-05:00
map local traffic - MAPI-20 W is closed from Bowman Springs Rd/Exit 443 (I-20) to US-287/Mansfield Hwy/Exit 442 (I-20).
I-20 W is closed from Bowman Springs Rd/Exit 443 (I-20) to US-287/Mansfield Hwy/Exit 442 (I-20).
Start Time: 2024-05-31T23:55:30.000-05:00
End Time: 2024-06-01T06:49:36.614-05:00
map local traffic - MAPRoadwork on I-35W S / US-287 S from Northside Dr/Exit 53 (I-35W) to TX-121/Exit 52 (I-35W).
Roadwork on I-35W S / US-287 S from Northside Dr/Exit 53 (I-35W) to TX-121/Exit 52 (I-35W).
Start Time: 2024-05-31T20:27:30.000-05:00
End Time: 2024-06-01T06:49:36.614-05:00
map local traffic - MAPRoadwork from exit [442A] to Mansfield Hwy.
Roadwork from exit [442A] to Mansfield Hwy.
Start Time: 2024-05-30T10:40:00.000-05:00
End Time: 2024-06-01T06:49:36.614-05:00
map local traffic - MAPUS-287 N Bus / Commerce St is closed from Lancaster Ave (US-287 Bus) to 7th St/6th St (US-287 Bus).
US-287 N Bus / Commerce St is closed from Lancaster Ave (US-287 Bus) to 7th St/6th St (US-287 Bus).
Start Time: 2024-05-30T08:26:13.000-05:00
End Time: 2024-06-02T23:59:00.000-05:00
map local traffic - MAPRoadwork from NE Loop 820 to Interstate 820.
Roadwork from NE Loop 820 to Interstate 820.
Start Time: 2024-05-30T06:16:23.000-05:00
End Time: 2024-06-01T23:59:00.000-05:00
map local traffic - MAPAlternating lanes closed. Entrance Ramp closed. Frontage road only, main lanes are open. Handley Ederville intersection alternating lanes for dustrol milling operation.
Alternating lanes closed. Entrance Ramp closed. Frontage road only, main lanes are open. Handley Ederville intersection alternating lanes for dustrol milling operation.
Start Time: 2024-05-29T02:00:00.000-05:00
End Time: 2024-06-06T23:59:00.000-05:00
map local traffic - MAPMain lanes closed. Night work only. SH 121 WB from SH 10 to Handley Ederville: 121 WB main lanes closed for stripping overhangs and pointing & patching.
Main lanes closed. Night work only. SH 121 WB from SH 10 to Handley Ederville: 121 WB main lanes closed for stripping overhangs and pointing & patching.
Start Time: 2024-05-24T02:00:00.000-05:00
End Time: 2024-06-08T20:00:00.000-05:00
map local traffic - MAPLeft lane closed. IH 820 NB from Randol Mill to Trinity Blvd: 820 NB left lane closure for installing OSS structures.
Left lane closed. IH 820 NB from Randol Mill to Trinity Blvd: 820 NB left lane closure for installing OSS structures.
Start Time: 2024-05-18T02:00:00.000-05:00
End Time: 2024-06-08T20:00:00.000-05:00
map local traffic - MAPRoadworks scheduled 01/06/2024 - 01/06/2024
Roadworks scheduled 01/06/2024 - 01/06/2024
Start Time: 2024-06-01T02:00:00.000-05:00
End Time: 2024-06-01T11:00:00.000-05:00
map local traffic - MAPRoadwork on Village Creek Rd from US Highway 287 to Martin Luther King Fwy.
Roadwork on Village Creek Rd from US Highway 287 to Martin Luther King Fwy.
Start Time: 2024-05-31T23:28:00.000-05:00
End Time: 2024-06-01T06:49:36.614-05:00
map local traffic - MAPRoadwork on Samuels Ave from E Northside Dr to NE 13th St.
Roadwork on Samuels Ave from E Northside Dr to NE 13th St.
Start Time: 2024-05-31T23:28:00.000-05:00
End Time: 2024-06-01T06:49:36.614-05:00
map local traffic - MAPRoadwork on US-287 N Bus / N Main St from Belknap St (US-287 Bus) to W Northside Dr (US-287 Bus).
Roadwork on US-287 N Bus / N Main St from Belknap St (US-287 Bus) to W Northside Dr (US-287 Bus).
Start Time: 2024-05-31T21:27:30.000-05:00
End Time: 2024-06-01T06:49:36.614-05:00
map local traffic - MAPE 15th St is closed from E Lancaster Ave / Jones St to Commerce St.
E 15th St is closed from E Lancaster Ave / Jones St to Commerce St.
Start Time: 2024-05-31T00:00:00.000-05:00
End Time: 2024-06-01T23:59:59.000-05:00
map local traffic - MAPE 15th St is closed from Commerce St to Jones St.
E 15th St is closed from Commerce St to Jones St.
Start Time: 2024-05-31T00:00:00.000-05:00
End Time: 2024-06-01T23:59:59.000-05:00
map local traffic - MAPGrayson Way is closed from Emma Way to Bursey Rd.
Grayson Way is closed from Emma Way to Bursey Rd.
Start Time: 2024-05-31T00:00:00.000-05:00
End Time: 2024-06-07T23:59:59.000-05:00
map local traffic - MAPGrover Ave is closed from Dundee Ave to Deen Rd.
Grover Ave is closed from Dundee Ave to Deen Rd.
Start Time: 2024-05-30T12:25:22.000-05:00
End Time: 2024-06-02T23:59:00.000-05:00
map local traffic - MAPEunice St is closed from Sheri Ln to W Pipeline Rd.
Eunice St is closed from Sheri Ln to W Pipeline Rd.
Start Time: 2024-05-30T11:46:11.000-05:00
End Time: 2024-06-02T23:59:00.000-05:00
map local traffic - MAPHoliday Ln is closed at NE Loop 820.
Holiday Ln is closed at NE Loop 820.
Start Time: 2024-05-30T08:01:57.000-05:00
End Time: 2024-06-01T23:59:00.000-05:00
map local traffic - MAPNe Loop 820 is closed at The Boulders Apartments.
Ne Loop 820 is closed at The Boulders Apartments.
Start Time: 2024-05-29T08:55:07.000-05:00
End Time: 2024-06-01T23:59:00.000-05:00
map local traffic - MAPSamuels Ave is closed from Northpark Dr to NE 13th St.
Samuels Ave is closed from Northpark Dr to NE 13th St.
Start Time: 2024-05-06T12:00:00.000-05:00
End Time: 2024-06-01T06:49:36.614-05:00
map local traffic - MAPHospital Dr is closed from Omega Dr to W Mayfield Rd.
Hospital Dr is closed from Omega Dr to W Mayfield Rd.
Start Time: 2023-11-22T19:04:57.000-06:00
End Time: 2024-06-01T23:59:00.000-05:00
map local traffic - MAPLanes closed to traffic, detour in place. Watch for flag personnel directing traffic. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
Lanes closed to traffic, detour in place. Watch for flag personnel directing traffic. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
Start Time: 2024-05-29T02:00:00.000-05:00
End Time: 2024-06-02T10:00:00.000-05:00
map local traffic - MAPLanes closed to traffic, detour in place. Watch for flag personnel directing traffic. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
Lanes closed to traffic, detour in place. Watch for flag personnel directing traffic. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
Start Time: 2024-05-29T02:00:00.000-05:00
End Time: 2024-06-02T10:00:00.000-05:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (156) from 287 to Watagua Dr (all travel directions): Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (156) from 287 to Watagua Dr (all travel directions): Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
Start Time: 2024-05-28T14:00:00.000-05:00
End Time: 2024-06-01T20:00:00.000-05:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (156) from 287 to Watagua Dr (all travel directions): Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (156) from 287 to Watagua Dr (all travel directions): Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
Start Time: 2024-05-28T14:00:00.000-05:00
End Time: 2024-06-01T20:00:00.000-05:00
map local traffic - MAPRoadwork on W Long Ave from US-287 Bus/N Main St (Long Ave) to Angle Ave (Long Ave).
Roadwork on W Long Ave from US-287 Bus/N Main St (Long Ave) to Angle Ave (Long Ave).
Start Time: 2024-05-22T12:38:30.000-05:00
End Time: 2024-06-01T06:49:36.614-05:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (156) from 287 to Watagua Dr (all travel directions): Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (156) from 287 to Watagua Dr (all travel directions): Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
Start Time: 2024-05-22T07:36:45.000-05:00
End Time: 2024-07-10T23:55:00.000-05:00
map local traffic - MAPRoadwork on W Interstate 20 from Bowman Springs Rd (I-20 Frontage) to US-287/SE Loop 820/Gateway Dr (I-20 Frontage).
Roadwork on W Interstate 20 from Bowman Springs Rd (I-20 Frontage) to US-287/SE Loop 820/Gateway Dr (I-20 Frontage).
Start Time: 2024-05-20T06:52:30.000-05:00
End Time: 2024-06-01T06:49:36.614-05:00
map local traffic - MAPRoadwork on W Arkansas Ln from W Green Oaks Blvd to Little Rd.
Roadwork on W Arkansas Ln from W Green Oaks Blvd to Little Rd.
Start Time: 2024-05-14T10:15:00.000-05:00
End Time: 2024-06-01T06:49:36.614-05:00
map local traffic - MAPRoadwork on Airport Fwy from Wesley Way to Northeast Tarrant.
Roadwork on Airport Fwy from Wesley Way to Northeast Tarrant.
Start Time: 2024-05-13T14:12:00.000-05:00
End Time: 2024-06-01T06:49:36.614-05:00
map local traffic - MAPRoadworks scheduled 01/06/2024 - 31/07/2024
Roadworks scheduled 01/06/2024 - 31/07/2024
Start Time: 2024-04-04T11:00:20.000-05:00
End Time: 2024-07-30T20:00:17.000-05:00
map local traffic - MAPRoadworks scheduled 01/06/2024 - 31/07/2024
Roadworks scheduled 01/06/2024 - 31/07/2024
Start Time: 2024-04-04T11:00:20.000-05:00
End Time: 2024-07-30T20:00:17.000-05:00
map local traffic - MAPRoadwork at N Beach St.
Roadwork at N Beach St.
Start Time: 2024-05-31T10:37:27.000-05:00
End Time: 2024-06-02T23:59:00.000-05:00
map local traffic
I 820 (TX) constructions near Junctions/Exits
Exit 428 to: I 20
Nearby city: city, Texas
Nearby Constructions
Exit 2 to: Southwest Loop 820 Service Road
Nearby city: Fort Worth, Texas
Nearby Constructions
Exit 3A to: Tom Landry Freeway(I 30)
Nearby city: Fort Worth, Texas
Nearby Constructions
Exit 10A to: Jacksboro Highway(TX 199);Northwest Loop 820 Service Road East
Nearby city: Fort Worth, Texas
Nearby Constructions
Exit 13 to: North Main Street(US 287)
Nearby city: Fort Worth, Texas
Nearby Constructions
Exit 16B to: US 287(I 35W)
Nearby city: Fort Worth, Texas
Nearby Constructions
Exit 19 to: Denton Hwy(US 377);Denton Highway(US 377)
Nearby city: Fort Worth, Texas
Nearby Constructions
Exit 22A to: Northeast Loop 820
Nearby city: North Richland Hills, Texas
Nearby Constructions
Exit 22B to: TX 183(TX 121);Northeast Loop 820
Nearby city: North Richland Hills, Texas
Nearby Constructions
Exit 23 to: Northeast Loop 820;TX 183(TX 121)
Nearby city: North Richland Hills, Texas
Nearby Constructions
Exit 24A to: TX 183
Nearby city: Fort Worth, Texas
Nearby Constructions
Exit 24B to: Airport Freeway(TX 121)
Nearby city: Fort Worth, Texas
Nearby Constructions
Exit 30B to: East Loop 820 South;East Lancaster Avenue(TX 180);East Loop 820 Service Road West
Nearby city: Fort Worth, Texas
Nearby Constructions
Exit 33A to: Martin Luther King Jr Fwy(US 287)
Nearby city: Fort Worth, Texas
Nearby Constructions
Exit 34A to: I 20;I 20(US 287)
Nearby city: Fort Worth, Texas
Nearby Constructions
Exit 442A to: Southeast Loop 820
Nearby city: Fort Worth, Texas
Nearby Constructions
Exit 30B to: East Loop 820 North
Nearby city: Fort Worth, Texas
Nearby Constructions
Exit 28A to: Tom Landry Freeway(I 30)
Nearby city: Fort Worth, Texas
Nearby Constructions
Exit 24 to: East Loop 820 N Service Road East
Nearby city: Fort Worth, Texas
Nearby Constructions
Exit 21 to: Northeast Loop 820
Nearby city: North Richland Hills, Texas
Nearby Constructions
Exit 19 to: Denton Hwy(US 377)
Nearby city: Fort Worth, Texas
Nearby Constructions
Exit 10A to: Jacksboro Highway(TX 199);Northwest Loop 820 Service Road West
Nearby city: Fort Worth, Texas
Nearby Constructions
Exit 2 to: West Loop 820 S Service Road West
Nearby city: Fort Worth, Texas
Nearby Constructions