Google+

I-25 Traffic and Road Conditions New Mexico (Other States)


see also: New Mexico Statewide Traffic & Road Condition Reports (79)

see also: I-25 New Mexico News (10)






Latest New Mexico Traffic Report for Interstate 25 (type a number or name to filter)
  • I-25 New Mexico Traffic and Road Conditions from DOT

    • Roadwork -
      Title: Interstate 25 from mile marker 222 (Sunport) to mile marker 221 (North of Rio Bravo)Description: I-25 Auxiliary lanes between Sunport and Gibson (Project 300530)Project Manager Emiliano Martinez, NMDOT/AUI, Inc. ContractorMay 20 through August 2015. Northbound and southbound right lane closures for auxiliary lane addition. I-25 northbound on ramp from Sunport closed until further notice. Exiting airport traffic should use Yale to Gibson.Post Date: Fri May 15 16:31:33 MDT 2015Update Date: Mon Jul 20 16:00:54 MDT 2015Expiration Date: unknown
      Fri, 15 May 2015 16:31:33
    • Roadwork -
      Title: Interstate 25 at mile marker 273Description: Santa FeThe New Mexico Department of Transportation (NMDOT) has issued a utility work permit to the Public Services Company of New Mexico for placement of a new overhead power line on I25 at mile marker 273 south of Santa Fe. The closures are necessary for the safe placement of the power line. Starting Sunday, August 2, from 6:00 a.m. to 9:00 a.m.., the I-25 northbound and southbound lanes will be reduced to one lane. There will be a series of ten minute closures on the I-25 northbound, southbound lanes and frontage roads to install overhead lines. Traffic can expect delays during this time.Drivers are urged to proceed with caution through the work zone, observe traffic control signs and reduce speed to the posted limit.Post Date: Fri Jul 31 16:00:30 MDT 2015Update Date: Fri Jul 31 16:00:30 MDT 2015Expiration Date: unknown
      Fri, 31 Jul 2015 16:00:30
    • Special Event -
      Title: Interstate 25 eastbound and westbound at mile marker 346 Las VegasDescription: Cowboys Reunion Centennial Parade (non-motorized horse parade) will take place in Las Vegas crossing Grand Avenue at Douglas Avenue and Prince Street. Minor delays can be expected during the crossing. Post Date: Sat Aug 01 07:55:02 MDT 2015Update Date: Sat Aug 01 07:55:02 MDT 2015Expiration Date: Sun Aug 02 00:00:00 MDT 2015
      Sat, 01 Aug 2015 07:55:02
    • Lane Closure -
      Title: Interstate 25 northbound and southbound from mile marker 448 to mile marker 452 Raton (FOLSOM/NM 72)Description: One lane closure is being utilized on both north and southbound lanes. Speed reduced to 55 mph. Please use caution in work zone. Event will be updated as condition changes. Post Date: Mon Jun 22 12:58:35 MDT 2015Update Date: Mon Jul 13 11:06:36 MDT 2015Expiration Date: unknown
      Mon, 22 Jun 2015 12:58:35
    • Roadwork -
      Title: Interstate 25 from mile marker 216 to mile marker 220 (RIO BRAVO)Description: I-25 Rio Bravo Roadway Reconstruction Project, I-25 MP 216.250 to MP 220 (Project A301010 / A301610) Project Manager Emiliano Martinez, NMDOT/Mountain States ContractorMile marker 220 (just south of the Rio Bravo Interchange) for approximately four miles (to the Broadway Interchange). During the day Sunday Saturday (7 days a week) from 5 a.m. - 8 p.m., two lanes will be open in each direction. Speed is reduced to 55 mph or less for the remainder of the project. Single lane closures in both directions during night work (8 p.m. 5 a.m.).Post Date: Fri Jun 05 15:38:47 MDT 2015Update Date: Mon Jul 27 10:52:21 MDT 2015Expiration Date: unknown
      Fri, 05 Jun 2015 15:38:47
    • Roadwork -
      Title: Interstate 25 northbound and southbound from mile marker 396 to mile marker 402Description: Paving operations are ongoing 6 a.m. to 7 p.m. Minor delays can be expected. Event will be updated as conditon changes. Post Date: Fri Jul 24 12:53:23 MDT 2015Update Date: Fri Jul 24 12:54:06 MDT 2015Expiration Date: unknown
      Fri, 24 Jul 2015 12:53:23
    • Roadwork -
      Title: I-25 Auxiliary lanes between Sunport and Gibson Description: I-25 Auxiliary lanes between Sunport and Gibson (Project 300530)Project Manager Emiliano Martinez, NMDOT/AUI, Inc. ContractorMay 20 through August 2015. Northbound and southbound right lane closures for auxiliary lane addition. I-25 northbound on ramp from Sunport closed until further notice. Exiting airport traffic should use Yale to Gibson. Post Date: Fri Jun 05 15:47:49 MDT 2015Update Date: Mon Jul 27 10:55:42 MDT 2015Expiration Date: unknown
      Fri, 05 Jun 2015 15:47:49
    • Roadwork -
      Title: Interstate 25 northbound and southbound from mile marker 1 (UNIV PARK/NMSU) to mile marker 3 (LOHMAN)Description: The NMDOT along with FNF Construction continue with work along the median and shoulders for I-25 between University and Lohman. Motorists will encounter lane reductions of 10 feet and reduced speed limits along interstate 25 within the work zone. The I-25 Loop on Ramp from University eastbound will be CLOSED until November of 2015. The contractor is working day and night shifts where heavy equipment can be found moving in and out of traffic within the wok zone. The south end of Don Roser will be closed from Saturday July 25 until Saturday August 22 as FNF removes the existing roadway and sidewalk so that they can reconstruct a new roadway and sidewalks. Detours will be stationed alerting motorists to seek an alternate route.Updates will be posted as conditions change.Post Date: Wed Feb 11 15:30:15 MST 2015Update Date: Fri Jul 31 15:18:49 MDT 2015Expiration Date: unknown
      Wed, 11 Feb 2015 15:30:15
    • Roadwork -
      Title: Interstate 25 from mile marker 234 (TRAMWAY) to mile marker 240 (BERNALILLO)Description: I-25 from MP 234.5 to 239.5 (Alameda to Tramway)Albuquerque Asphalt, Inc. ContractorJuly 9 - August 9 from 8:00 p.m. to 5:00 a.m. Weekends ONLY. Various lane and ramp closures for pavement rehab.Post Date: Mon Jul 20 16:14:24 MDT 2015Update Date: Mon Jul 27 11:00:08 MDT 2015Expiration Date: Mon Aug 10 01:00:00 MDT 2015
      Mon, 20 Jul 2015 16:14:24
    • Construction Closure -
      Title: Interstate 25 at mile marker 147 (SOCORRO SOUTH)Description: The bridge overpass at exit 147 in Socorro, NM is CLOSED along with the I-25 southbound off ramp and I-25 northbound on ramp. The NMDOT with Villalobos Construction are repairing the bridge deck and resurfacing the bridge ramps, which will require these closure to be placed until the work is complete. Updates will be posted as conditions change.Post Date: Fri Jun 26 11:19:33 MDT 2015Update Date: Fri Jul 31 15:18:49 MDT 2015Expiration Date: unknown
      Fri, 26 Jun 2015 11:19:33
    • Roadwork -
      Title: Interstate 25 northbound and southbound from mile marker 330 Tecolotito (BERNAL) to mile marker 334Description: A full lane closure with a 14' drving lane being used. Speed reduced to 55 mile per hour. Event will be updated as conditon change.Post Date: Mon Jul 13 11:45:10 MDT 2015Update Date: Mon Jul 13 11:45:10 MDT 2015Expiration Date: unknown
      Mon, 13 Jul 2015 11:45:10
    • Roadwork -
      Title: Interstate 25 northbound at mile marker 325Description: A one lane closure is being utilized and speed reduced to 55 mph. Please use caution in the area as workers are in area. Event will be updated as conditon changes. Post Date: Mon Jul 13 11:41:03 MDT 2015Update Date: Mon Jul 13 11:41:03 MDT 2015Expiration Date: unknown
      Mon, 13 Jul 2015 11:41:03
    • Roadwork -
      Title: Interstate 25 northbound and southbound from mile marker 293 to mile marker 294 (CANONCITO)Description: Santa Fe The New Mexico Department of Transportation (NMDOT) bridge replacement work on I-25 north of Santa Fe at Canoncito between mile markers 293 and 294. The scope of the project includes bridge rehabilitation, roadway and ramp reconstruction, and pavement rehabilitation for 1.42 miles within Santa Fe County. Tom Griego is the NMDOT Project Engineer. AUI is the contractor for this project.Traffic Impacts:Tthe cross road under I-25 (Sleeping Dog Road) and the I- 25 southbound ramp is OPENED. The North Bound I-25 right lane closed and NB off and on ramps closed at interchange access at US 285 MM 290 to old Las Vegas highway for local traffic only. There is a 12' lane width restriction through the construction zone NB SB. Project anticipated to be completed July 2015; weather permitting. NMDOT urges motorists to proceed through the work zone with caution, watch for construction personnel. Post Date: Tue Apr 08 16:36:30 MDT 2014Update Date: Thu Jul 09 13:27:39 MDT 2015Expiration Date: unknown
      Tue, 08 Apr 2014 16:36:30
    • Roadwork -
      Title: Interstate 25 northbound and southbound at mile marker 286Description: Santa FeThe New Mexico Department of Transportation (NMDOT) continues bridge rehabilitation work on Seton Village Bridge over I-25 at mile maker 286.50. The contractor will be raising the bridge to meet the minimum interstate Federal guidelines. TRAFFIC IMPACTS:The I25 northbound and southbound lanes will be reduced to one lane Monday through Friday from 9:00 a.m. to 3:00 p.m. This bridge rehabilitation project is a scheduled to be completed end of July, 2015; weather permitting. AUI, Inc. of Albuquerque is the contractor for this project.Drivers are urged to proceed with caution through the work zone, observe traffic control signs and reduce speed to the posted limit AUI, Inc. of Albuquerque is the contractor for this project. NMDOT Santa Fe Project Office is managing this project. 505-995-7931Post Date: Fri May 15 16:07:47 MDT 2015Update Date: Thu Jul 09 13:27:39 MDT 2015Expiration Date: unknown
      Fri, 15 May 2015 16:07:47
    • Roadwork -
      Title: Interstate 25 northbound and southbound from mile marker 450 Dillon (RATON SOUTH) to mile marker 454 (RATON)Description: Speed reduced to 55 mph with a one lane closure used intermittenly. Minor delays can be expected. Please seek alternate route. Event will be updated as condition changes. Post Date: Mon Jun 29 08:09:11 MDT 2015Update Date: Tue Jul 21 07:56:45 MDT 2015Expiration Date: unknown
      Mon, 29 Jun 2015 08:09:11
    • Roadwork -
      Title: Interstate 25 northbound and southbound from mile marker 276 (NM 599) to mile marker 278 (NM 14)Description: Santa Fe - I-25/NM 14 (Cerrillos Road) DIVERGING DIAMOND INTERCHANGE-I-25 mile marker 276.944 to mile marker 278.224 and NM 14 (Cerrillos Road) Mile marker 46.044 to mile marker 46.270. NMDOT will build a new type of freeway interchange at I-25 & NM 14 (Cerrillos Road) located south of Santa Fe. This project is scheduled to be completed in winter of 2016.DAYTIME LANE CLOSURES:: July 27 - July 31, from 9:00 a.m. to 3:30 p.m. the I-25 northbound lanes will be reduced to one lane. The I-25 northbound lanes will be Re-Opened each day at 3:30 p.m.August 3 - August 7 from 8:30 a.m. to 3:00 p.m. the I-25 southbound lanes will be reduced to one lane. The I-25 southbound lanes will be Re-Opened each day at 3:00 p.m.NIGHT TIME LANE CLOSURES RESCHEDULED:August 3 - 9 from 9:00 p.m. to 6:00 a.m. each night. During each nightly closure, the NM 14(Cerrillos Road) northbound and southbound lanes will be CLOSED at 9:00 p.m. from Beckner Road to Rancho Viejo. Southbound NM 14 (Cerrillos Road) Traffic will be detoured to I-25 West Frontage Road to NM 599 to access Southbound NM 14(Cerrillos Road). Northbound NM 14 (Cerrillos Road) traffic will be detoured to NM 599 to I-25 West Frontage Road to access Northbound NM 14 (Cerrillos Road). NM 14 (Cerrillos Road) will be RE-OPENED at 6:00 a.m. each morning.The NM 14(Cerrillos Road) northbound on-ramp to northbound I-25 will be CLOSED. Traffic will be detoured to the NM 599 interchange to access I-25 northbound. The I-25 on-ramp will be REOPENED at 6:00 a.m. each morning. The NM 14 southbound on-ramp to I-25 southbound and the I-25 (Exit 278) off-ramps to NM 14(Cerrillos Road) will remain OPEN.RAMP CLOSURES:The Southbound I-25 exit ramp (Exit 278A) to southbound NM 14 will be CLOSED. The Northbound I-25 exit ramp (Exit 278) to southbound NM 14 will be CLOSED. Traffic will be detoured to I-25 Exit 276 (NM 599) to access NM 14 southbound. The I-25 northbound and southbound on-ramps will remain OPEN. Southbound I-25 (Exit 278B) off-ramp to northbound Cerrillos Road will remain OPEN. Northbound I-25 (Exit 278) off-ramp to northbound Cerrillos Road will remain OPEN.The exit ramps will remain closed until completion of project. CONTACT INFO:NMDOT District FiveSanta Fe Project Office will be managing the project:Project Engineer: Thomas Griego -505-955-7930 FNF Construction Inc. - 602-619-2502115 South 48th StreetTempe, AZ 85281Post Date: Thu Jun 04 12:18:32 MDT 2015Update Date: Tue Jul 28 13:42:37 MDT 2015Expiration Date: unknown
      Thu, 04 Jun 2015 12:18:32

* all events are extracted from NM DOT web sites, or DOT RSS feeds, or Twitter DOT feeds
Disclaimer: The Data represented here may not be correct and is for reference only. Information may vary from actual roadway conditions and events. Conditions represented on this site are extracted from the latest reported from the DOT web site, some time may have passed since the last update. Actual roadway conditions may vary. Please consult NM DOT web site for the exact information. We DO NOT claim any of this information as proprietary or copyrighted under our ownership in anyway.



Thank you for using Roadnow.

We hope you enjoy your trip.







I-25 Traffic News New Mexico

I-25 Traffic News Colorado

I-25 Traffic News Wyoming




I-25 Accident News New Mexico

I-25 Accident News Colorado

I-25 Accident News Wyoming
















New Mexico
I-25 Traffic near Las Cruces

I-25 Traffic near Albuquerque

I-25 Traffic near Santa Fe

I-25 Traffic near Las Vegas

I-25 Traffic near Raton

Colorado
I-25 Traffic near Pueblo

I-25 Traffic near Colorado Springs

I-25 Traffic near Denver

I-25 Traffic near Fort Collins

Wyoming
I-25 Traffic near Cheyenne

I-25 Traffic near Casper

I-25 Traffic near Sheridan