Google+

I-29 Traffic and Road Conditions North Dakota (Other States)


see also: North Dakota Statewide Traffic & Road Condition Reports (121)

see also: I-29 North Dakota News (1)






Latest North Dakota Traffic Report for Interstate 29 (type a number or name to filter)
  • I-29 North Dakota Traffic and Road Conditions from DOT

    • I 29 N - Hankinson Interchange (RP 8). 1 miles south of ND/SD State line to 11.3 miles north. (MP: 0.000 to 11.300)
         Type of work: Pavement Repair Work   Delays: No Delays   Lane Reduction: Reduced to one lane   Travel Speeds: Reduced   Surface Type: Pavement   Restriction(s) associated with work zone:  Width - 16.0 ft., Height - 15.5 ft.   Comments: Northbound roadway of I-29 is closed from 1.0 mile south of the South Dakota/North Dakota Border to 11.3 miles north. Using median crossovers, Northbound traffic will be diverted to the southbound roadway. Speed Limit reduced to 25mph on Co Rd 13E (State Line) interchange bridge and ND 11 (Hankinson) interchange bridge where paving operations have begun. Single lane closures will be maintained by flaggers.   Expected Start: 04/04/2016   Expected End: 09/01/2016
      2016-08-08 14:04
    • I 29 N - 7 SOUTH OF ND 54-NB/SB (MP: 153.750 to 153.750)
         Type of work: Bridge Repair Work   Delays: 15 minutes or less   Lane Reduction: Reduced to one lane   Travel Speeds: Reduced   Surface Type: Pavement   Restriction(s) associated with work zone:  Width - 11.0 ft.   Comments: One lane closed in each direction with concrete barriers on I-29 northbound and southbound. I-29 Northbound and Southbound at this location will have a 11 foot width restriction and speeds will be reduced.   Expected Start: 07/28/2016   Expected End: 09/30/2016
      2016-07-28 10:56
    • I 29 S - Hankinson Interchange (RP 8). 1 miles south of ND/SD State line to 11.3 miles north. (MP: 0.000 to 11.300)
         Type of work: Pavement Repair Work   Delays: No Delays   Lane Reduction: Reduced to one lane   Travel Speeds: Reduced   Surface Type: Pavement   Restriction(s) associated with work zone:  Width - 20.0 ft., Height - 15.5 ft.   Comments: Northbound roadway of I-29 is closed from 1.0 mile south of the South Dakota/North Dakota Border to 11.3 miles north. Using median crossovers, Northbound traffic will be diverted to the southbound roadway. Speed Limit reduced to 25mph on Co Rd 13E (State Line) interchange bridge and ND 11 (Hankinson) interchange bridge where paving operations have begun. Single lane closures will be maintained by flaggers.   Expected Start: 04/04/2016   Expected End: 09/01/2016
      2016-08-08 14:04
    • I 29 S - 7 SOUTH OF ND 54-NB/SB (MP: 153.750 to 153.750)
         Type of work: Bridge Repair Work   Delays: 15 minutes or less   Lane Reduction: Reduced to one lane   Travel Speeds: Reduced   Surface Type: Pavement   Restriction(s) associated with work zone:  Width - 11.0 ft.   Comments: One lane closed in each direction with concrete barriers on I-29 northbound and southbound. I-29 Northbound and Southbound at this location will have a 11 foot width restriction and speeds will be reduced.   Expected Start: 07/28/2016   Expected End: 09/30/2016
      2016-07-28 10:56
    • ND 13 E - JCT 18-WYNDMERE E TO I-29 (MP: 365.456 to 380.194)
         Type of work: Bridge Repair Work   Delays: Expect Delays   Lane Reduction: Reduced to one lane   Travel Speeds: Less than 35   Surface Type: Pavement   Restriction(s) associated with work zone:  Width - 15.0 ft.   Comments: Construction work will begin Monday, August 1, on the bridge structure that crosses over the Soo Line Railroad on the east side of Wyndmere (between Wyndmere and I-29). Work will consist of slab replacement on the bridge approach, guardrail and a mill and overlay. Concrete barriers and a temporary traffic signal will be in place to help direct traffic. Speeds will be reduced to 25 mph in the work zone.   Expected Start: 08/01/2016   Expected End: 09/30/2016
      2016-07-29 14:25
    • ND 13 W - JCT 18-WYNDMERE E TO I-29 (MP: 365.456 to 380.194)
         Type of work: Bridge Repair Work   Delays: Expect Delays   Lane Reduction: Reduced to one lane   Travel Speeds: Less than 35   Surface Type: Pavement   Restriction(s) associated with work zone:  Width - 15.0 ft.   Comments: Construction work will begin Monday, August 1, on the bridge structure that crosses over the Soo Line Railroad on the east side of Wyndmere (between Wyndmere and I-29). Work will consist of slab replacement on the bridge approach, guardrail and a mill and overlay. Concrete barriers and a temporary traffic signal will be in place to help direct traffic. Speeds will be reduced to 25 mph in the work zone.   Expected Start: 08/01/2016   Expected End: 09/30/2016
      2016-07-29 14:25

* all events are extracted from ND DOT web sites, or DOT RSS feeds, or Twitter DOT feeds
Disclaimer: The Data represented here may not be correct and is for reference only. Information may vary from actual roadway conditions and events. Conditions represented on this site are extracted from the latest reported from the DOT web site, some time may have passed since the last update. Actual roadway conditions may vary. Please consult ND DOT web site for the exact information. We DO NOT claim any of this information as proprietary or copyrighted under our ownership in anyway.



Thank you for using Roadnow.

We hope you enjoy your trip.









I-29 Traffic News Missouri

I-29 Traffic News Iowa

I-29 Traffic News South Dakota

I-29 Traffic News North Dakota




I-29 Accident News Missouri

I-29 Accident News Iowa

I-29 Accident News South Dakota

I-29 Accident News North Dakota
















Missouri
I-29 Traffic near Kansas City

I-29 Traffic near St. Joseph

I-29 Traffic near Mound City

Iowa
I-29 Traffic near Council Bluffs

I-29 Traffic near Sioux City

South Dakota
I-29 Traffic near Sioux Falls

North Dakota
I-29 Traffic near Fargo

I-29 Traffic near Grand Forks