Google+

I-89 Traffic and Road Conditions Vermont (Other States)


see also: Vermont Statewide Traffic & Road Condition Reports (61)

see also: I-89 Vermont News (10)






Latest Vermont Traffic Report for Interstate 89 (type a number or name to filter)
  • I-89 Vermont Traffic and Road Conditions from DOT

    • I 89 (MileMarker 47.37 to ) from Berlin to Montpelier, Condition: Construction
      Paving project in progress on I-89 between Exits 6 and Exits 8 on the Northbound side. Project is expected to run through mid-October. Traffic will be reduced to one lane. Expect some minor delays.
      8/25/2014 11:50:10 PM
    • I 89 (MileMarker 78 to 91) from Richmond to Colchester, Condition: Construction
      Paving Project continues on I-89 Northbound from Richmond to Colchester. Paving of southbound on/off ramps. Some line striping is also taking place in the Richmond area. Project hours are from 7:00PM to 6:00AM. Multiple work zones.
      6/6/2014 12:33:21 PM
    • I 89 (MileMarker 101.8 to ) from Milton to , Condition: Construction
      Work has begun on replacement of both north and southbound bridges on I-89 in Milton at MM 101.8 (Over the Lamoille River). As project moves forward there may be lane closures during off-peak traffic hours.
      1/31/2014 1:10:29 PM
    • I 89 (MileMarker 101.8 to ) at Milton, Condition: Construction
      Work has begun on replacement of both north and southbound bridges on I-89 in Milton at MM 101.8 (Over the Lamoille River). As project moves forward there may be lane closures during off-peak traffic hours.
      12/1/2013
    • I89 I14 Ramp B SB OFF (MileMarker 0 to 0.252) at South Burlington, Condition: Info
      The I-89 Exit 14E Off Ramp will be closed for paving (weather permitting) from 1130PM on 8/27 to 2AM on 8/28. Motorist will be detoured to Exit 13.
      8/22/2014 2:48:34 PM
    • I89 I14 Ramp D SB ON (MileMarker 0 to 0.229) at South Burlington, Condition: Info
      I-89 Exit 14 SB on Ramp from US 2 westbound will be closed 9PM-1130PM for paving 8/27. Detour via Exit 15. Paving is weather permitting.
      8/22/2014 2:25:53 PM
    • US 2 (MileMarker 0.8 to 0.2) from Burlington to South Burlington, Condition: Construction
      US 2 in South Burlington (Williston Rd) will begin realignment from East Ave. to the ramps of I-89 by the Sheraton Hotel. Delays likely. Shut down in winter is expected.
      6/3/2014 3:08:58 PM

* all events are extracted from VT DOT web sites, or DOT RSS feeds, or Twitter DOT feeds
Disclaimer: The Data represented here may not be correct and is for reference only. Information may vary from actual roadway conditions and events. Conditions represented on this site are extracted from the latest reported from the DOT web site, some time may have passed since the last update. Actual roadway conditions may vary. Please consult VT DOT web site for the exact information. We DO NOT claim any of this information as proprietary or copyrighted under our ownership in anyway.



Thank you for using Roadnow.

We hope you enjoy your trip.







I-89 Traffic News New Hampshire

I-89 Traffic News Vermont




I-89 Accident News New Hampshire

I-89 Accident News Vermont













New Hampshire
I-89 Traffic near Concord

I-89 Traffic near Lebanon

Vermont
I-89 Traffic near White River Junction

I-89 Traffic near Barre

I-89 Traffic near Montpelier

I-89 Traffic near Burlington

I-89 Traffic near St. Albans