Google+

I-94 Traffic and Road Conditions North Dakota (Other States)


see also: North Dakota Statewide Traffic & Road Condition Reports (105)

see also: I-94 North Dakota News (10)






Latest North Dakota Traffic Report for Interstate 94 (type a number or name to filter)
  • 139 days ago
    I-94 : Left lane closed between Exit 349 I-29 and Exit 351 US-81 Bus, near Fargo,ND
    Left lane closed due to construction on I-94 both ways between Exit 349 I-29 and Exit 351 US-81 Bus.
    start time: 2014-05-14 12:00:00 CDT
    end time: 2014-11-02 12:59:00 CDT
  • I-94 North Dakota Traffic and Road Conditions from DOT

    • I 94 E - 5 MI E OF ND 3 TO 5 MI E ND 30-WB/EB (MP: 214.126 to 233.343)
         Type of work: Bridge Repair Work   Delays: 15 minutes or less   Lane Reduction: Reduced to one lane   Travel Speeds: 35-45   Surface Type: Pavement   Restriction(s) associated with work zone:  Width - 14.0 ft.   Comments: Starting from 8/18/2014 to 9/30/2014 there will be one lane closure at I 94 both east and westbound due to bridge repair work. Speed limit will be reduce to 40 MPH within the work zone, please slow down and watch for flaggers and construction workers for safety.   Expected Start: 08/18/2014   Expected End: 09/30/2014
      2014-08-19 09:33
    • I 94 E - HILL INTR TO BUFFALO - EB (MP: 309.715 to 314.863)
         Type of work: Concrete Pavement Repair Work   Delays: 15 minutes or less   Lane Reduction: Reduced to one lane   Travel Speeds: 35-45   Surface Type: Pavement   Restriction(s) associated with work zone:  Width - 14.0 ft.   Comments: Starting Monday July 28th, 2014 there will be a one lane closure on I 94 eastbound for a concrete repair project. Speed limits will be reduced to 65 MPH within the lane closure. Please slow down through the work zone.   Expected Start: 07/25/2014   Expected End: 09/30/2014
      2014-08-11 07:20
    • I 94 W - 5 MI E OF ND 3 TO 5 MI E ND 30-WB/EB (MP: 214.126 to 233.343)
         Type of work: Bridge Repair Work   Delays: 15 minutes or less   Lane Reduction: Reduced to one lane   Travel Speeds: 35-45   Surface Type: Pavement   Restriction(s) associated with work zone:  Width - 14.0 ft.   Comments: Starting from 8/18/2014 to 9/30/2014 there will be one lane closure at I 94 both east and westbound due to bridge repair work. Speed limit will be reduce to 40 MPH within the work zone, please slow down and watch for flaggers and construction workers for safety.   Expected Start: 08/18/2014   Expected End: 09/30/2014
      2014-08-19 09:33
    • I 94 W - E CASSELTON E TO NEAR W FARGO - WB (MP: 331.983 to 342.890)
         Type of work: Ultrathin Paving   Delays: Expect Delays   Lane Reduction: Reduced to one lane   Travel Speeds: Reduced   Surface Type: Pavement   Restriction(s) associated with work zone:  Width - 15.0 ft.   Comments: I-94 will be reduced to one lane starting about Sept. 22   Expected Start: 09/25/2014   Expected End: 10/10/2014
      2014-09-24 09:19

* all events are extracted from ND DOT web sites, or DOT RSS feeds, or Twitter DOT feeds
Disclaimer: The Data represented here may not be correct and is for reference only. Information may vary from actual roadway conditions and events. Conditions represented on this site are extracted from the latest reported from the DOT web site, some time may have passed since the last update. Actual roadway conditions may vary. Please consult ND DOT web site for the exact information. We DO NOT claim any of this information as proprietary or copyrighted under our ownership in anyway.



Thank you for using Roadnow.

We hope you enjoy your trip.














Montana
I-94 Traffic near El Billings

North Dakota
I-94 Traffic near Bismarck

I-94 Traffic near Fargo

Minnesota
I-94 Traffic near Moorhead

I-94 Traffic near Minneapolis

I-94 Traffic near St. Paul

Wisconsin
I-94 Traffic near Eau Claire

I-94 Traffic near Wisconsin Dells

I-94 Traffic near Madison

I-94 Traffic near Milwaukee

Illinois
I-94 Traffic near Chicago

Michigan
I-94 Traffic near Detroit

I-94 Traffic near Port Huron