Google+

I-94 Traffic and Road Conditions North Dakota (Other States)


see also: North Dakota Statewide Traffic & Road Condition Reports (133)

see also: I-94 North Dakota News (10)






Latest North Dakota Traffic Report for Interstate 94 (type a number or name to filter)
  • I-94 North Dakota Traffic and Road Conditions from DOT

    • I 94 W - 1.3 mi. West of Painted Canyon and Theodore Roosevelt National Par (MP: 31.700)
      WARNING   Delays: No Delays   Travel Speeds: Normal   Comments: I-94 WB near Painted Canyon interchange has right shoulder closure, speed are reduced to 65 mph through the area   Start Date: 5/5/2015 12:05:00 PM   End Date: 6/5/2015 1:15:00 PM
      2015-06-01 13:59
    • I 94 E - I-94 Eastbound at milepoint 165.0 (MP: 165.000 to 165.000)
         Type of work: Construction   Delays: Expect Delays   Lane Reduction: Reduced to one lane   Travel Speeds: Reduced   Surface Type: Pavement   Restriction(s) associated with work zone:  Width - 14.0 ft.   Comments: There will be a one lane closure on I-94 Eastbound at RP 165 on Thursday, July 30. There will be a 14 foot width restriction in place during the day. The speed limit will be reduced at the lane closure.   Expected Start: 07/30/2015   Expected End: 07/30/2015
      2015-07-29 10:07
    • I 94 W - I-94 Westbound Grant Marsh Bridge (MP: 156.200 to 157.000)
         Type of work: Construction   Delays: Expect Delays   Lane Reduction: Reduced to one lane   Travel Speeds: 35-45   Surface Type: Pavement   Restriction(s) associated with work zone:  Width - 14.0 ft.   Comments: There will be a one lane closure on I-94 Westbound at the Grant Marsh Bridge on Thursday, July 30 from 8:30 am to 4:00 pm. There will be a 14 foot width restriction in place during this time. The speed limit will be reduced to 40 mph.   Expected Start: 07/30/2015   Expected End: 07/30/2015
      2015-07-29 10:03
    • I 94 W - I-94 Westbound milepoint 169.8 (MP: 169.800 to 169.800)
         Type of work: Construction   Delays: Expect Delays   Lane Reduction: Reduced to one lane   Travel Speeds: Reduced   Surface Type: Pavement   Restriction(s) associated with work zone:  Width - 14.0 ft.   Comments: There will be a one lane closure on I-94 Westbound at RP 169.8 on Thursday, July 30. There will be a 14 foot width restriction in place during the day. The speed limit will be reduced at the lane closure.   Expected Start: 07/30/2015   Expected End: 07/30/2015
      2015-07-29 10:08

* all events are extracted from ND DOT web sites, or DOT RSS feeds, or Twitter DOT feeds
Disclaimer: The Data represented here may not be correct and is for reference only. Information may vary from actual roadway conditions and events. Conditions represented on this site are extracted from the latest reported from the DOT web site, some time may have passed since the last update. Actual roadway conditions may vary. Please consult ND DOT web site for the exact information. We DO NOT claim any of this information as proprietary or copyrighted under our ownership in anyway.



Thank you for using Roadnow.

We hope you enjoy your trip.














Montana
I-94 Traffic near El Billings

North Dakota
I-94 Traffic near Bismarck

I-94 Traffic near Fargo

Minnesota
I-94 Traffic near Moorhead

I-94 Traffic near Minneapolis

I-94 Traffic near St. Paul

Wisconsin
I-94 Traffic near Eau Claire

I-94 Traffic near Wisconsin Dells

I-94 Traffic near Madison

I-94 Traffic near Milwaukee

Illinois
I-94 Traffic near Chicago

Michigan
I-94 Traffic near Detroit

I-94 Traffic near Port Huron