Constructions near I 10 exit 593
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPAlternating lanes closed. Construction to expand from 4 to 10 lanes.
Alternating lanes closed. Construction to expand from 4 to 10 lanes.
Start Time: 2025-06-20T02:14:00.000-05:00
End Time: 2027-10-31T23:45:00.000-05:00
map local traffic - MAPRoadwork on I-10 E / US-87 S from S Alamo St (TX-536 Spur) exit [155A] to S Laredo St exit [154B].
Roadwork on I-10 E / US-87 S from S Alamo St (TX-536 Spur) exit [155A] to S Laredo St exit [154B].
Start Time: 2025-06-19T18:26:09.000-05:00
End Time: 2025-06-21T07:12:49.324-05:00
map local traffic - MAPRoadwork on I-10 E / I-35 S / US-87 S from Durango Blvd/Exit 155 (I-35/I-10) to El Paso St (I-35/I-10).
Roadwork on I-10 E / I-35 S / US-87 S from Durango Blvd/Exit 155 (I-35/I-10) to El Paso St (I-35/I-10).
Start Time: 2025-06-17T08:15:51.000-05:00
End Time: 2025-06-21T07:12:49.324-05:00
map local traffic - MAPRight lane closed. Continuous right lane closure on SH 123 SB from N Heideke St to IH 10.
Right lane closed. Continuous right lane closure on SH 123 SB from N Heideke St to IH 10.
Start Time: 2025-06-19T09:24:30.000-05:00
End Time: 2025-12-31T17:00:00.000-06:00
map local traffic - MAPRoadwork on Weston Rd from Green Valley Rd to Schmucks Rd.
Roadwork on Weston Rd from Green Valley Rd to Schmucks Rd.
Start Time: 2025-06-20T07:27:30.000-05:00
End Time: 2025-06-21T07:12:49.324-05:00
map local traffic - MAPRoadwork on Rigsby Ave from Clark Ave to US-87/Roland Ave.
Roadwork on Rigsby Ave from Clark Ave to US-87/Roland Ave.
Start Time: 2025-06-12T13:07:28.000-05:00
End Time: 2025-06-21T07:12:49.324-05:00
map local traffic - MAPRoadwork on E FM 1518 N / FM-1518 from I-10/US-90/TX-130 (FM-1518) to FM-78/Gordon A Blake Hwy/Seguin Rd (FM-1518).
Roadwork on E FM 1518 N / FM-1518 from I-10/US-90/TX-130 (FM-1518) to FM-78/Gordon A Blake Hwy/Seguin Rd (FM-1518).
Start Time: 2025-06-06T22:50:00.000-05:00
End Time: 2025-06-21T07:12:49.324-05:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. Use alternate routeWork on this project will consist of the expansion of roadway from 2 lanes to 4 lanes, with a raised median or continuous left turn lane, bike lanes and sidewalks. Please be aware of crews and equipment in the roadway. There will be alternating lane closures from time to time. Slow down in the work zone so everyone makes it home safely. Talk. Text. Crash.
Alternating lanes closed. Motorists should expect delays. Use alternate routeWork on this project will consist of the expansion of roadway from 2 lanes to 4 lanes, with a raised median or continuous left turn lane, bike lanes and sidewalks. Please be aware of crews and equipment in the roadway. There will be alternating lane closures from time to time. Slow down in the work zone so everyone makes it home safely. Talk. Text. Crash.
Start Time: 2025-05-21T09:49:00.000-05:00
End Time: 2028-01-31T17:00:00.000-06:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. Use alternate routeWork on this project will consist of the expansion of roadway from 2 lanes to 4 lanes, with a raised median or continuous left turn lane, bike lanes and sidewalks. Please be aware of crews and equipment in the roadway. There will be alternating lane closures from time to time. Slow down in the work zone so everyone makes it home safely. Talk. Text. Crash.
Alternating lanes closed. Motorists should expect delays. Use alternate routeWork on this project will consist of the expansion of roadway from 2 lanes to 4 lanes, with a raised median or continuous left turn lane, bike lanes and sidewalks. Please be aware of crews and equipment in the roadway. There will be alternating lane closures from time to time. Slow down in the work zone so everyone makes it home safely. Talk. Text. Crash.
Start Time: 2025-05-20T18:46:53.000-05:00
End Time: 2028-01-31T17:00:00.000-06:00
map local traffic - MAPRoadwork on Losoya St from E Houston St to E Commerce St.
Roadwork on Losoya St from E Houston St to E Commerce St.
Start Time: 2025-05-04T02:23:30.000-05:00
End Time: 2025-09-06T23:55:00.000-05:00
map local traffic - MAPAlternating lanes closed. One way traffic control with delays. Watch for flag personnel directing traffic. No oversize loads
Alternating lanes closed. One way traffic control with delays. Watch for flag personnel directing traffic. No oversize loads
Start Time: 2025-03-26T08:25:36.000-05:00
End Time: 2026-09-30T17:00:00.000-05:00
map local traffic - MAPAlternating lanes closed. One way traffic control with delays. Watch for flag personnel directing traffic. No oversize loads
Alternating lanes closed. One way traffic control with delays. Watch for flag personnel directing traffic. No oversize loads
Start Time: 2025-03-25T19:24:00.000-05:00
End Time: 2026-09-30T17:00:00.000-05:00
map local traffic - MAPRoadwork on Losoya St from E Commerce St (S Alamo St/Alamo Plz) to E Durango Blvd (S Alamo St).
Roadwork on Losoya St from E Commerce St (S Alamo St/Alamo Plz) to E Durango Blvd (S Alamo St).
Start Time: 2025-03-06T13:18:04.000-06:00
End Time: 2025-09-06T23:55:00.000-05:00
map local traffic - MAPRoadwork on Dolorosa from S San Saba St (Dolorosa St) to S Flores St (Dolorosa St).
Roadwork on Dolorosa from S San Saba St (Dolorosa St) to S Flores St (Dolorosa St).
Start Time: 2024-12-23T12:56:11.000-06:00
End Time: 2025-06-23T23:55:00.000-05:00
map local traffic - MAPRoadwork on W Houston St from N Pecos la Trinidad St/N San Saba St (Houston St) to N Santa Rosa St.
Roadwork on W Houston St from N Pecos la Trinidad St/N San Saba St (Houston St) to N Santa Rosa St.
Start Time: 2025-05-22T19:10:43.000-05:00
End Time: 2025-09-06T23:55:00.000-05:00
map local traffic