Current Constructions
- MAP6846 E Warner - road construction - Eastbound lane shift on Warner for Team Fishel to install Fiber for Raphael Misserie.
6846 E Warner - road construction - Eastbound lane shift on Warner for Team Fishel to install Fiber for Raphael Misserie.
Start Time: 2025-06-16T02:30:00.000-06:00
End Time: 2025-06-23T10:00:00.000-06:00
map local traffic - MAPOn ramp closed on ramp from McQueen Rd to 202-LOOP Westbound . All lanes closed. 5/12/2025 12:00 AM to 7/10/2025 11:00 PM
On ramp closed on ramp from McQueen Rd to 202-LOOP Westbound . All lanes closed. 5/12/2025 12:00 AM to 7/10/2025 11:00 PM
Start Time: 2025-05-12T01:34:30.000-06:00
End Time: 2025-07-06T18:00:00.000-06:00
map local traffic - MAPW Erie St is closed from N Chippewa Pl to N Alma School Rd.
W Erie St is closed from N Chippewa Pl to N Alma School Rd.
Start Time: 2025-05-27T09:20:30.000-06:00
End Time: 2025-06-16T05:58:01.578-06:00
map local traffic - MAPRoadwork on N Murphy Rd from W Maricopa Casa Grande Hwy to W Honeycutt Rd.
Roadwork on N Murphy Rd from W Maricopa Casa Grande Hwy to W Honeycutt Rd.
Start Time: 2025-06-15T16:08:00.000-06:00
End Time: 2025-06-16T05:58:01.578-06:00
map local traffic - MAPRyan Rd - road construction - Crew needs to Close off 4 sections of road in phases to work safely.
Ryan Rd - road construction - Crew needs to Close off 4 sections of road in phases to work safely.
Start Time: 2025-06-14T18:50:00.000-06:00
End Time: 2025-09-29T18:00:00.000-06:00
map local traffic - MAPAlma School Rd - road construction - Channels & Hard Closures
Alma School Rd - road construction - Channels & Hard Closures
Start Time: 2025-06-09T17:57:00.000-06:00
End Time: 2025-06-21T18:00:00.000-06:00
map local traffic - MAP9650 E Ray - road construction - Eastbound and westbound Ray Rd. right lane closures and northbound Copernicus lane shift for Marks Valley to install ADA ramps and a new light signal.
9650 E Ray - road construction - Eastbound and westbound Ray Rd. right lane closures and northbound Copernicus lane shift for Marks Valley to install ADA ramps and a new light signal.
Start Time: 2025-05-26T18:00:00.000-06:00
End Time: 2025-07-13T18:00:00.000-06:00
map local traffic - MAP5215 S Ellsworth - road construction - Northbound and southbound Ellsworth left lane, shoulder, and left turn bay closures. Westbound Ray Rd Lane shifts and a left lane closure. Westbound Cadence left lane closure for Major League to install fiber for Lightpath.
5215 S Ellsworth - road construction - Northbound and southbound Ellsworth left lane, shoulder, and left turn bay closures. Westbound Ray Rd Lane shifts and a left lane closure. Westbound Cadence left lane closure for Major League to install fiber for Lightpath.
Start Time: 2025-05-21T02:30:00.000-06:00
End Time: 2025-06-16T10:00:00.000-06:00
map local traffic - MAPRoad widening on E Ocotillo Rd Both from S Val Vista Dr to S Greenfield Rd. Starting 2024-08-22 3:14 PM and ending 2026-08-22 3:14 PM.
Road widening on E Ocotillo Rd Both from S Val Vista Dr to S Greenfield Rd. Starting 2024-08-22 3:14 PM and ending 2026-08-22 3:14 PM.
Start Time: 2024-08-22T16:14:00.000-06:00
End Time: 2026-08-22T16:14:00.000-06:00
map local traffic - MAPRoad widening on E Ocotillo Rd Both from S Val Vista Dr to S Greenfield Rd. Starting 2024-08-22 3:14 PM and ending 2026-08-22 3:14 PM.
Road widening on E Ocotillo Rd Both from S Val Vista Dr to S Greenfield Rd. Starting 2024-08-22 3:14 PM and ending 2026-08-22 3:14 PM.
Start Time: 2024-08-22T16:14:00.000-06:00
End Time: 2026-08-22T16:14:00.000-06:00
map local traffic - MAPDOBSON RD - road construction - OPEN CUT - WEEKEND WORK
DOBSON RD - road construction - OPEN CUT - WEEKEND WORK
Start Time: 2025-06-11T18:02:30.000-06:00
End Time: 2025-07-13T18:00:00.000-06:00
map local traffic - MAP34TH ST - road construction - AS
34TH ST - road construction - AS
Start Time: 2025-06-09T01:00:00.000-06:00
End Time: 2025-06-20T01:00:00.000-06:00
map local traffic - MAPIVANHOE ST - road construction - ASPHALT RESTORATION ON ALLEY
IVANHOE ST - road construction - ASPHALT RESTORATION ON ALLEY
Start Time: 2025-06-08T18:00:00.000-06:00
End Time: 2025-06-19T18:00:00.000-06:00
map local traffic - MAPWillis Rd - road construction - Utility-bore-restoration
Willis Rd - road construction - Utility-bore-restoration
Start Time: 2025-06-06T16:01:30.000-06:00
End Time: 2025-06-19T18:00:00.000-06:00
map local traffic - MAPWarner Rd - road construction - RESTO
Warner Rd - road construction - RESTO
Start Time: 2025-06-04T18:00:00.000-06:00
End Time: 2025-06-16T18:00:00.000-06:00
map local traffic - MAPLIBERTY LN - road construction - MISCELLANEOUS CIVIL WORK
LIBERTY LN - road construction - MISCELLANEOUS CIVIL WORK
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAPFrye Rd - road construction - tcp depicting work being done at frye and canal dr. depicting a 24 hr closure in the cul de sac
Frye Rd - road construction - tcp depicting work being done at frye and canal dr. depicting a 24 hr closure in the cul de sac
Start Time: 2025-05-30T08:57:00.000-06:00
End Time: 2025-07-22T18:00:00.000-06:00
map local traffic - MAPEllis - road construction - Fiber pulling, resto
Ellis - road construction - Fiber pulling, resto
Start Time: 2025-05-30T08:57:00.000-06:00
End Time: 2025-06-26T18:00:00.000-06:00
map local traffic - MAPInovation - road construction - Fiber pulling, resto
Inovation - road construction - Fiber pulling, resto
Start Time: 2025-05-30T08:57:00.000-06:00
End Time: 2025-06-26T18:00:00.000-06:00
map local traffic - MAPRiggs Rd - road construction - TRENCH 25' AND BORE 780' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE - EXTENSION TO PREVIOUSLY APPR
Riggs Rd - road construction - TRENCH 25' AND BORE 780' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE - EXTENSION TO PREVIOUSLY APPR
Start Time: 2025-05-14T18:00:00.000-06:00
End Time: 2025-06-19T18:00:00.000-06:00
map local traffic - MAPFrye Rd - road construction - Various typical tcps per our precon with Granite and the City of Chandler for all the work being don
Frye Rd - road construction - Various typical tcps per our precon with Granite and the City of Chandler for all the work being don
Start Time: 2025-05-14T02:04:30.000-06:00
End Time: 2025-07-15T18:00:00.000-06:00
map local traffic - MAP9558 E Sector Dr - road construction - Flagging operations at Echo and Warner Rd, parking restrictions, directional closures and shoulder closures. SCI to install Google Fiber.
9558 E Sector Dr - road construction - Flagging operations at Echo and Warner Rd, parking restrictions, directional closures and shoulder closures. SCI to install Google Fiber.
Start Time: 2025-05-12T02:30:00.000-06:00
End Time: 2025-06-26T10:00:00.000-06:00
map local traffic - MAP9558 E Sector Dr - road construction - Various restrictions: flagging operations, parking restrictions, directional closures and shoulder closures. SCI to install Google Fiber.
9558 E Sector Dr - road construction - Various restrictions: flagging operations, parking restrictions, directional closures and shoulder closures. SCI to install Google Fiber.
Start Time: 2025-05-12T02:30:00.000-06:00
End Time: 2025-06-26T10:00:00.000-06:00
map local traffic - MAP9558 E Sector Dr - road construction - Various restrictions: flagging operations, parking restrictions, directional closures and shoulder closures. SCI to install Google Fiber.
9558 E Sector Dr - road construction - Various restrictions: flagging operations, parking restrictions, directional closures and shoulder closures. SCI to install Google Fiber.
Start Time: 2025-05-12T02:30:00.000-06:00
End Time: 2025-06-26T10:00:00.000-06:00
map local traffic - MAP9558 E Sector Dr - road construction - Flagging operations at Stearn Ave and Inspirian Pkwy, parking restrictions, directional closures and shoulder closures. SCI to install Google Fiber.
9558 E Sector Dr - road construction - Flagging operations at Stearn Ave and Inspirian Pkwy, parking restrictions, directional closures and shoulder closures. SCI to install Google Fiber.
Start Time: 2025-05-12T02:30:00.000-06:00
End Time: 2025-06-26T10:00:00.000-06:00
map local traffic - MAPConstruction work on E Ocotillo Rd Both from S Greenfield Rd to S Freeman Farms Rd. Starting 2024-11-18 8:30 AM and ending 2026-08-01 2:00 PM.
Construction work on E Ocotillo Rd Both from S Greenfield Rd to S Freeman Farms Rd. Starting 2024-11-18 8:30 AM and ending 2026-08-01 2:00 PM.
Start Time: 2024-11-18T08:30:00.000-07:00
End Time: 2026-08-01T15:00:00.000-06:00
map local traffic - MAPConstruction work on E Ocotillo Rd Both from S Greenfield Rd to S Freeman Farms Rd. Starting 2024-11-18 8:30 AM and ending 2026-08-01 2:00 PM.
Construction work on E Ocotillo Rd Both from S Greenfield Rd to S Freeman Farms Rd. Starting 2024-11-18 8:30 AM and ending 2026-08-01 2:00 PM.
Start Time: 2024-11-18T08:30:00.000-07:00
End Time: 2026-08-01T15:00:00.000-06:00
map local traffic - MAP365 S Power - road construction - Northbound Power right lane closed for water line tie in by BRW Contracting for private development.
365 S Power - road construction - Northbound Power right lane closed for water line tie in by BRW Contracting for private development.
Start Time: 2025-06-16T02:30:00.000-06:00
End Time: 2025-06-20T10:00:00.000-06:00
map local traffic - MAPRight lane closed on S Rural Rd Southbound from E Hermosa Dr to E Minton Dr 5/12/2025 12:00 AM to 7/1/2025 12:00 AM
Right lane closed on S Rural Rd Southbound from E Hermosa Dr to E Minton Dr 5/12/2025 12:00 AM to 7/1/2025 12:00 AM
Start Time: 2025-06-16T01:10:00.000-06:00
End Time: 2025-06-17T00:59:00.000-06:00
map local traffic - MAPMADISON ST - road construction - sewer work
MADISON ST - road construction - sewer work
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-07-01T01:00:00.000-06:00
map local traffic - MAPELLIOT RD - road construction - GM
ELLIOT RD - road construction - GM
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-06-28T01:00:00.000-06:00
map local traffic - MAPROOSEVELT ST - road construction - AB
ROOSEVELT ST - road construction - AB
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-06-30T01:00:00.000-06:00
map local traffic - MAPMADISON ST - road construction - NS
MADISON ST - road construction - NS
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-06-30T01:00:00.000-06:00
map local traffic - MAP16TH ST - road construction - MH, DE, SE
16TH ST - road construction - MH, DE, SE
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-06-18T01:00:00.000-06:00
map local traffic - MAP2ND ST - road construction - NS
2ND ST - road construction - NS
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-06-30T01:00:00.000-06:00
map local traffic - MAP44TH ST - road construction - SE
44TH ST - road construction - SE
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-06-30T01:00:00.000-06:00
map local traffic - MAPWASHINGTON ST - road construction - SE
WASHINGTON ST - road construction - SE
Start Time: 2025-06-15T23:10:00.000-06:00
End Time: 2025-07-01T01:00:00.000-06:00
map local traffic - MAPLong term road construction on E Apache Trl Westbound from N Ellsworth Rd to N Sossaman Rd . 2 Right Lanes Closed. Width Restriction: 11ft 4/10/2025 5:00 AM to 9/10/2025 5:00 AM
Long term road construction on E Apache Trl Westbound from N Ellsworth Rd to N Sossaman Rd . 2 Right Lanes Closed. Width Restriction: 11ft 4/10/2025 5:00 AM to 9/10/2025 5:00 AM
Start Time: 2025-06-15T23:10:00.000-06:00
End Time: 2025-06-17T00:59:00.000-06:00
map local traffic - MAPW Madison St is closed from S 7th Ave to S 9th Ave.
W Madison St is closed from S 7th Ave to S 9th Ave.
Start Time: 2025-06-11T15:34:30.000-06:00
End Time: 2025-06-16T05:57:48.739-06:00
map local traffic - MAPN Val Vista Dr is closed from AZ-202/Red Mountain Fwy to E McDowell Rd.
N Val Vista Dr is closed from AZ-202/Red Mountain Fwy to E McDowell Rd.
Start Time: 2025-05-29T08:32:30.000-06:00
End Time: 2025-06-16T05:57:48.739-06:00
map local traffic - MAPMcKellips Rd - road construction - Road work, road closed. Follow detour route
McKellips Rd - road construction - Road work, road closed. Follow detour route
Start Time: 2025-03-24T04:09:45.000-06:00
End Time: 2025-07-07T06:00:00.000-06:00
map local traffic - MAPPOLK ST - road construction - Storm Drain Installation
POLK ST - road construction - Storm Drain Installation
Start Time: 2025-06-14T09:30:00.000-06:00
End Time: 2025-06-28T17:00:00.000-06:00
map local traffic - MAP2005 N Val Vista - road construction - Westbound McKellips right lane closed for Garney to install a new waterline for City of Mesa Engineering.
2005 N Val Vista - road construction - Westbound McKellips right lane closed for Garney to install a new waterline for City of Mesa Engineering.
Start Time: 2025-06-12T16:03:30.000-06:00
End Time: 2025-07-12T17:59:00.000-06:00
map local traffic - MAPBUCKEYE RD - road construction - SE
BUCKEYE RD - road construction - SE
Start Time: 2025-06-12T01:00:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAP32ND ST - road construction - UG, EM
32ND ST - road construction - UG, EM
Start Time: 2025-06-11T01:00:00.000-06:00
End Time: 2025-06-18T01:00:00.000-06:00
map local traffic - MAPBASELINE RD - road construction - GM
BASELINE RD - road construction - GM
Start Time: 2025-06-09T01:00:00.000-06:00
End Time: 2025-06-28T01:00:00.000-06:00
map local traffic - MAP6636 E Alder Ave - road construction - Eastbound lane closure on University Dr for Northstar to install Google Fiber.
6636 E Alder Ave - road construction - Eastbound lane closure on University Dr for Northstar to install Google Fiber.
Start Time: 2025-06-09T00:00:00.000-06:00
End Time: 2025-07-18T12:00:00.000-06:00
map local traffic - MAPLong term road construction on E Apache Trl Westbound from S Sossaman Rd to S Ellsworth Rd . 2 Right Lanes Closed. Width Restriction: 13ft 4/10/2025 5:00 AM to 9/10/2025 5:00 AM
Long term road construction on E Apache Trl Westbound from S Sossaman Rd to S Ellsworth Rd . 2 Right Lanes Closed. Width Restriction: 13ft 4/10/2025 5:00 AM to 9/10/2025 5:00 AM
Start Time: 2025-06-03T14:00:00.000-06:00
End Time: 2025-06-17T00:59:00.000-06:00
map local traffic - MAPBROADWAY RD - road construction - PAVING
BROADWAY RD - road construction - PAVING
Start Time: 2025-06-02T01:00:00.000-06:00
End Time: 2025-07-01T01:00:00.000-06:00
map local traffic - MAP3327 S Sossaman - road construction - Northbound and southbound lane shifts on Sossaman for McCain to install sewer and pave shoulders for Arco
3327 S Sossaman - road construction - Northbound and southbound lane shifts on Sossaman for McCain to install sewer and pave shoulders for Arco
Start Time: 2025-05-23T07:39:00.000-06:00
End Time: 2025-06-19T18:00:00.000-06:00
map local traffic - MAPE THOMAS RD / N PIMA RD - road construction - NB Pima Rd thru lane, shoulder restricted through Thomas Rd.; WB Thomas Rd right turn lane, shoulder restricted at Pima Rd.; SB Pima Rd right turn lane, shoulder restricted at Thomas Rd onto Westbound Merge Lane.
E THOMAS RD / N PIMA RD - road construction - NB Pima Rd thru lane, shoulder restricted through Thomas Rd.; WB Thomas Rd right turn lane, shoulder restricted at Pima Rd.; SB Pima Rd right turn lane, shoulder restricted at Thomas Rd onto Westbound Merge Lane.
Start Time: 2025-05-05T18:52:00.000-06:00
End Time: 2025-07-31T17:00:00.000-06:00
map local traffic - MAPRoadwork on S Central Ave from Baseline Rd to Broadway Rd.
Roadwork on S Central Ave from Baseline Rd to Broadway Rd.
Start Time: 2025-03-30T20:23:30.000-06:00
End Time: 2025-06-16T05:57:48.739-06:00
map local traffic - MAPRoadwork on S Central Ave from Broadway Rd to Baseline Rd.
Roadwork on S Central Ave from Broadway Rd to Baseline Rd.
Start Time: 2025-03-29T15:08:30.000-06:00
End Time: 2025-06-16T05:57:48.739-06:00
map local traffic - MAP44TH ST - road construction - Asphalt/Concrete Restoration
44TH ST - road construction - Asphalt/Concrete Restoration
Start Time: 2025-06-13T09:30:00.000-06:00
End Time: 2025-06-27T17:00:00.000-06:00
map local traffic - MAP35TH AVE - road construction - Concrete Panel
35TH AVE - road construction - Concrete Panel
Start Time: 2025-06-12T09:30:00.000-06:00
End Time: 2025-06-20T17:00:00.000-06:00
map local traffic - MAPARCADIA DR - road construction - Installing Speed Cushions
ARCADIA DR - road construction - Installing Speed Cushions
Start Time: 2025-06-12T09:30:00.000-06:00
End Time: 2025-07-12T17:00:00.000-06:00
map local traffic - MAP48TH ST - road construction - Replace Water Service Line
48TH ST - road construction - Replace Water Service Line
Start Time: 2025-06-12T09:30:00.000-06:00
End Time: 2025-06-20T17:30:00.000-06:00
map local traffic - MAPARCADIA DR - road construction - Installing Speed Cushions
ARCADIA DR - road construction - Installing Speed Cushions
Start Time: 2025-06-12T09:30:00.000-06:00
End Time: 2025-07-12T17:00:00.000-06:00
map local traffic - MAPAPACHE ST - road construction - Sign Placement
APACHE ST - road construction - Sign Placement
Start Time: 2025-06-12T07:00:00.000-06:00
End Time: 2025-06-23T17:00:00.000-06:00
map local traffic - MAP10TH ST - road construction - SE
10TH ST - road construction - SE
Start Time: 2025-06-12T01:00:00.000-06:00
End Time: 2025-06-20T01:00:00.000-06:00
map local traffic - MAPSOUTH MOUNTAIN AVE - road construction - Asphalt/Concrete Restoration
SOUTH MOUNTAIN AVE - road construction - Asphalt/Concrete Restoration
Start Time: 2025-06-11T09:30:00.000-06:00
End Time: 2025-06-27T17:00:00.000-06:00
map local traffic - MAPWINDSOR AVE - road construction - Install speed hump
WINDSOR AVE - road construction - Install speed hump
Start Time: 2025-06-11T09:30:00.000-06:00
End Time: 2025-06-17T17:00:00.000-06:00
map local traffic - MAPMULBERRY ST - road construction - BO/TR/AS/CC
MULBERRY ST - road construction - BO/TR/AS/CC
Start Time: 2025-06-10T16:03:30.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAPMCKINLEY ST - road construction - CC/AS RT
MCKINLEY ST - road construction - CC/AS RT
Start Time: 2025-06-10T01:00:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAP43RD PL - road construction - REMOVE AND REPLACE SIDEWALK
43RD PL - road construction - REMOVE AND REPLACE SIDEWALK
Start Time: 2025-06-09T07:00:00.000-06:00
End Time: 2025-06-27T15:00:00.000-06:00
map local traffic - MAPCOOLIDGE ST - road construction - BO, CC, AS, PH, PC, RT, TR, UG
COOLIDGE ST - road construction - BO, CC, AS, PH, PC, RT, TR, UG
Start Time: 2025-06-09T01:00:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAP3RD AVE - road construction - SE
3RD AVE - road construction - SE
Start Time: 2025-06-09T01:00:00.000-06:00
End Time: 2025-06-23T01:00:00.000-06:00
map local traffic - MAP16TH PL - road construction - Catch Basin / Storm Drain Installation
16TH PL - road construction - Catch Basin / Storm Drain Installation
Start Time: 2025-06-07T18:50:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAPROOSEVELT ST - road construction - Leaky Water Services
ROOSEVELT ST - road construction - Leaky Water Services
Start Time: 2025-06-06T09:30:00.000-06:00
End Time: 2025-06-20T17:00:00.000-06:00
map local traffic - MAP36TH ST - road construction - PC
36TH ST - road construction - PC
Start Time: 2025-06-06T01:00:00.000-06:00
End Time: 2025-06-20T01:00:00.000-06:00
map local traffic - MAPBROADWAY RD - road construction - GM, AS, CC
BROADWAY RD - road construction - GM, AS, CC
Start Time: 2025-06-05T16:02:30.000-06:00
End Time: 2025-06-21T01:00:00.000-06:00
map local traffic - MAP52ND ST - road construction - BO
52ND ST - road construction - BO
Start Time: 2025-06-04T16:02:30.000-06:00
End Time: 2025-06-23T01:00:00.000-06:00
map local traffic - MAPGRANT ST - road construction - TR BO
GRANT ST - road construction - TR BO
Start Time: 2025-06-04T01:00:00.000-06:00
End Time: 2025-06-18T01:00:00.000-06:00
map local traffic - MAP430 N DOBSON - road construction - B & F to do sewer and water work for the City of Mesa CP0834Q017. with multiple restrictions in the intersection of N Dobson Rd and W University Dr
430 N DOBSON - road construction - B & F to do sewer and water work for the City of Mesa CP0834Q017. with multiple restrictions in the intersection of N Dobson Rd and W University Dr
Start Time: 2025-06-03T18:00:00.000-06:00
End Time: 2025-07-10T18:00:00.000-06:00
map local traffic - MAP35TH AVE - road construction - Asphalt - Concrete Restoration
35TH AVE - road construction - Asphalt - Concrete Restoration
Start Time: 2025-06-03T09:30:00.000-06:00
End Time: 2025-06-20T17:00:00.000-06:00
map local traffic - MAP16TH ST - road construction - REMOVE AND REPLACE SIDEWALK
16TH ST - road construction - REMOVE AND REPLACE SIDEWALK
Start Time: 2025-06-03T07:00:00.000-06:00
End Time: 2025-06-20T14:00:00.000-06:00
map local traffic - MAPPALM LN - road construction - REMOVE AND REPLACE SIDEWALK
PALM LN - road construction - REMOVE AND REPLACE SIDEWALK
Start Time: 2025-06-03T07:00:00.000-06:00
End Time: 2025-06-27T15:00:00.000-06:00
map local traffic - MAP7TH ST - road construction - Asphalt - Concrete Restoration
7TH ST - road construction - Asphalt - Concrete Restoration
Start Time: 2025-06-02T01:00:00.000-06:00
End Time: 2025-06-20T17:00:00.000-06:00
map local traffic - MAP51ST ST - road construction - PH, BO, RT, CC, AS
51ST ST - road construction - PH, BO, RT, CC, AS
Start Time: 2025-06-02T01:00:00.000-06:00
End Time: 2025-06-30T01:00:00.000-06:00
map local traffic - MAP17TH ST - road construction - Sewer Adjustments
17TH ST - road construction - Sewer Adjustments
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-24T01:00:00.000-06:00
map local traffic - MAPWARNER ELLIOT LOOP - road construction - ADA RAMP/Patch Back
WARNER ELLIOT LOOP - road construction - ADA RAMP/Patch Back
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-27T17:00:00.000-06:00
map local traffic - MAP47TH AVE - road construction - BF, BO,PI, PH, PC, RT, UG
47TH AVE - road construction - BF, BO,PI, PH, PC, RT, UG
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-24T01:00:00.000-06:00
map local traffic - MAPPOLK ST - road construction - MH SE
POLK ST - road construction - MH SE
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-18T01:00:00.000-06:00
map local traffic - MAP2ND AVE - road construction - Construction on new build/Utility in Alley
2ND AVE - road construction - Construction on new build/Utility in Alley
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-07-16T01:00:00.000-06:00
map local traffic - MAP3RD AVE - road construction - UTILITY ADJUSTMENT
3RD AVE - road construction - UTILITY ADJUSTMENT
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-23T15:00:00.000-06:00
map local traffic - MAPWILLETTA ST - road construction - APS power run
WILLETTA ST - road construction - APS power run
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-23T17:00:00.000-06:00
map local traffic - MAP11TH AVE - road construction - sewer work
11TH AVE - road construction - sewer work
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-07-01T01:00:00.000-06:00
map local traffic - MAP15TH ST - road construction - BO/TR/AS/CC
15TH ST - road construction - BO/TR/AS/CC
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAP24TH ST - road construction - NEW INTERSECTION INSTALL
24TH ST - road construction - NEW INTERSECTION INSTALL
Start Time: 2025-05-28T09:30:00.000-06:00
End Time: 2025-06-23T17:00:00.000-06:00
map local traffic - MAPRAYMOND ST - road construction - trench, asphalt, concrete
RAYMOND ST - road construction - trench, asphalt, concrete
Start Time: 2025-05-20T08:00:00.000-06:00
End Time: 2025-06-20T17:00:00.000-06:00
map local traffic - MAP2831 E Southern - road construction - Steel plate in the right-of-way for Southwest gas work by Undergound Pipeline.
2831 E Southern - road construction - Steel plate in the right-of-way for Southwest gas work by Undergound Pipeline.
Start Time: 2025-04-28T17:02:30.000-06:00
End Time: 2025-06-20T17:59:00.000-06:00
map local traffic - MAPPOLK ST - road construction - Storm Drain Installation
POLK ST - road construction - Storm Drain Installation
Start Time: 2025-06-14T09:30:00.000-06:00
End Time: 2025-06-28T17:00:00.000-06:00