- MAPOn ramp closed on ramp from McQueen Rd to 202-LOOP Westbound . All lanes closed. 5/12/2025 12:00 AM to 7/10/2025 11:00 PM
On ramp closed on ramp from McQueen Rd to 202-LOOP Westbound . All lanes closed. 5/12/2025 12:00 AM to 7/10/2025 11:00 PM
Start Time: 2025-05-12T01:34:30.000-06:00
End Time: 2025-07-06T18:00:00.000-06:00
map local traffic - MAPRoadway reduced to two lanes on S McQueen Rd Southbound from E Wildhorse Dr to E Armstrong Wy 6/20/2025 10:00 PM to 6/22/2025 10:00 PM
Roadway reduced to two lanes on S McQueen Rd Southbound from E Wildhorse Dr to E Armstrong Wy 6/20/2025 10:00 PM to 6/22/2025 10:00 PM
Start Time: 2025-06-20T23:00:00.000-06:00
End Time: 2025-06-22T00:59:00.000-06:00
map local traffic - MAPE Ryan Rd is closed from S Arizona Ave to S McQueen Rd.
E Ryan Rd is closed from S Arizona Ave to S McQueen Rd.
Start Time: 2025-06-05T15:52:30.000-06:00
End Time: 2025-06-21T06:14:48.456-06:00
map local traffic - MAPW Erie St is closed from N Chippewa Pl to N Pleasant Dr.
W Erie St is closed from N Chippewa Pl to N Pleasant Dr.
Start Time: 2025-05-27T09:23:30.000-06:00
End Time: 2025-06-21T06:14:48.456-06:00
map local traffic - MAPRoadwork on N Alma School Rd from W Chandler Blvd to W Ray Rd.
Roadwork on N Alma School Rd from W Chandler Blvd to W Ray Rd.
Start Time: 2025-06-18T13:17:00.000-06:00
End Time: 2025-06-21T06:14:48.456-06:00
map local traffic - MAPAlma School Rd - road construction - Channels & Hard Closures
Alma School Rd - road construction - Channels & Hard Closures
Start Time: 2025-06-09T17:56:30.000-06:00
End Time: 2025-06-21T18:00:00.000-06:00
map local traffic - MAPRoad widening on E Ocotillo Rd Both from S Val Vista Dr to S Greenfield Rd. Starting 2024-08-22 3:14 PM and ending 2026-08-22 3:14 PM.
Road widening on E Ocotillo Rd Both from S Val Vista Dr to S Greenfield Rd. Starting 2024-08-22 3:14 PM and ending 2026-08-22 3:14 PM.
Start Time: 2024-08-22T16:14:00.000-06:00
End Time: 2026-08-22T16:14:00.000-06:00
map local traffic - MAPRoad widening on E Ocotillo Rd Both from S Val Vista Dr to S Greenfield Rd. Starting 2024-08-22 3:14 PM and ending 2026-08-22 3:14 PM.
Road widening on E Ocotillo Rd Both from S Val Vista Dr to S Greenfield Rd. Starting 2024-08-22 3:14 PM and ending 2026-08-22 3:14 PM.
Start Time: 2024-08-22T16:14:00.000-06:00
End Time: 2026-08-22T16:14:00.000-06:00
map local traffic - MAPNORTH DAKOTA ST - road construction - Slurry Seal
NORTH DAKOTA ST - road construction - Slurry Seal
Start Time: 2025-06-16T18:00:00.000-06:00
End Time: 2025-07-30T18:00:00.000-06:00
map local traffic - MAP6846 E Warner - road construction - Eastbound lane shift on Warner for Team Fishel to install Fiber for Raphael Misserie.
6846 E Warner - road construction - Eastbound lane shift on Warner for Team Fishel to install Fiber for Raphael Misserie.
Start Time: 2025-06-16T02:30:00.000-06:00
End Time: 2025-06-23T10:00:00.000-06:00
map local traffic - MAPParklane Blvd - road construction - A tcp depicting a northbound midblock on Parklane at Commonwealth
Parklane Blvd - road construction - A tcp depicting a northbound midblock on Parklane at Commonwealth
Start Time: 2025-06-15T18:00:00.000-06:00
End Time: 2025-06-26T18:00:00.000-06:00
map local traffic - MAPParklane Blvd - road construction - A tcp depicting a northbound midblock on Parklane at Commonwealth
Parklane Blvd - road construction - A tcp depicting a northbound midblock on Parklane at Commonwealth
Start Time: 2025-06-15T18:00:00.000-06:00
End Time: 2025-06-26T18:00:00.000-06:00
map local traffic - MAPDOBSON RD - road construction - OPEN CUT - WEEKEND WORK
DOBSON RD - road construction - OPEN CUT - WEEKEND WORK
Start Time: 2025-06-11T18:02:30.000-06:00
End Time: 2025-07-13T18:00:00.000-06:00
map local traffic - MAPWarner Rd - road construction - RESTO
Warner Rd - road construction - RESTO
Start Time: 2025-06-04T18:00:00.000-06:00
End Time: 2025-07-30T18:00:00.000-06:00
map local traffic - MAPLIBERTY LN - road construction - MISCELLANEOUS CIVIL WORK
LIBERTY LN - road construction - MISCELLANEOUS CIVIL WORK
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAPInovation - road construction - Fiber pulling, resto
Inovation - road construction - Fiber pulling, resto
Start Time: 2025-05-30T08:57:00.000-06:00
End Time: 2025-06-26T18:00:00.000-06:00
map local traffic - MAPEllis - road construction - Fiber pulling, resto
Ellis - road construction - Fiber pulling, resto
Start Time: 2025-05-30T08:57:00.000-06:00
End Time: 2025-06-26T18:00:00.000-06:00
map local traffic - MAPFrye Rd - road construction - tcp depicting work being done at frye and canal dr. depicting a 24 hr closure in the cul de sac
Frye Rd - road construction - tcp depicting work being done at frye and canal dr. depicting a 24 hr closure in the cul de sac
Start Time: 2025-05-30T08:57:00.000-06:00
End Time: 2025-07-22T18:00:00.000-06:00
map local traffic - MAP9558 E Sector - road construction - Flagging operations at Echo and Warner, parking restrictions, directional closures and shoulder closures. SCI to install Google Fiber.
9558 E Sector - road construction - Flagging operations at Echo and Warner, parking restrictions, directional closures and shoulder closures. SCI to install Google Fiber.
Start Time: 2025-05-12T02:30:00.000-06:00
End Time: 2025-06-26T10:00:00.000-06:00
map local traffic - MAPFrye Rd - road construction - Various typical tcps per our precon with Granite and the City of Chandler for all the work being don
Frye Rd - road construction - Various typical tcps per our precon with Granite and the City of Chandler for all the work being don
Start Time: 2025-04-22T08:02:30.000-06:00
End Time: 2025-07-15T18:00:00.000-06:00
map local traffic - MAPConstruction work on E Ocotillo Rd Both from S Greenfield Rd to S Freeman Farms Rd. Starting 2024-11-18 8:30 AM and ending 2026-08-01 2:00 PM.
Construction work on E Ocotillo Rd Both from S Greenfield Rd to S Freeman Farms Rd. Starting 2024-11-18 8:30 AM and ending 2026-08-01 2:00 PM.
Start Time: 2024-11-18T08:30:00.000-07:00
End Time: 2026-08-01T15:00:00.000-06:00
map local traffic - MAPConstruction work on E Ocotillo Rd Both from S Greenfield Rd to S Freeman Farms Rd. Starting 2024-11-18 8:30 AM and ending 2026-08-01 2:00 PM.
Construction work on E Ocotillo Rd Both from S Greenfield Rd to S Freeman Farms Rd. Starting 2024-11-18 8:30 AM and ending 2026-08-01 2:00 PM.
Start Time: 2024-11-18T08:30:00.000-07:00
End Time: 2026-08-01T15:00:00.000-06:00
map local traffic - MAPS 3rd St is closed from E Grant St to E Lincoln St.
S 3rd St is closed from E Grant St to E Lincoln St.
Start Time: 2025-06-21T02:35:30.000-06:00
End Time: 2025-06-21T06:14:35.746-06:00
map local traffic - MAPRoadway closed on E Frank Lloyd Wright Blvd Eastbound near N Pima Rd . All lanes closed. 6/20/2025 9:00 PM to 6/21/2025 8:00 AM
Roadway closed on E Frank Lloyd Wright Blvd Eastbound near N Pima Rd . All lanes closed. 6/20/2025 9:00 PM to 6/21/2025 8:00 AM
Start Time: 2025-06-20T22:51:00.000-06:00
End Time: 2025-06-21T08:59:00.000-06:00
map local traffic - MAPRoadway closed on E Frank Lloyd Wright Blvd Westbound near N Pima Rd . All lanes closed. 6/20/2025 9:00 PM to 6/21/2025 8:00 AM
Roadway closed on E Frank Lloyd Wright Blvd Westbound near N Pima Rd . All lanes closed. 6/20/2025 9:00 PM to 6/21/2025 8:00 AM
Start Time: 2025-06-20T22:44:30.000-06:00
End Time: 2025-06-21T08:59:00.000-06:00
map local traffic - MAPMcKellips Rd - road construction - Road work, road closed. Follow detour route
McKellips Rd - road construction - Road work, road closed. Follow detour route
Start Time: 2025-06-20T11:35:30.000-06:00
End Time: 2025-07-07T06:00:00.000-06:00
map local traffic - MAPBUCKEYE RD - road construction - BO,PH,BF
BUCKEYE RD - road construction - BO,PH,BF
Start Time: 2025-06-21T01:00:00.000-06:00
End Time: 2025-06-22T01:00:00.000-06:00
map local traffic - MAPLong term road construction on E Apache Trl Westbound from N Meridian Rd to Silver Spur Ranch Mobile Home Park . 2 Right Lanes Closed. Width Restriction: 11ft 4/10/2025 5:00 AM to 9/10/2025 5:00 AM
Long term road construction on E Apache Trl Westbound from N Meridian Rd to Silver Spur Ranch Mobile Home Park . 2 Right Lanes Closed. Width Restriction: 11ft 4/10/2025 5:00 AM to 9/10/2025 5:00 AM
Start Time: 2025-06-20T16:24:30.000-06:00
End Time: 2025-06-22T00:59:00.000-06:00
map local traffic - MAPflagger station
flagger station
Start Time: 2025-06-20T11:14:30.000-06:00
End Time: 2025-07-04T01:00:00.000-06:00
map local traffic - MAPW Adams St is closed from N 7th Ave to N Central Ave (Adams St).
W Adams St is closed from N 7th Ave to N Central Ave (Adams St).
Start Time: 2025-06-19T10:58:00.000-06:00
End Time: 2025-06-21T06:14:35.746-06:00
map local traffic - MAPS 16th Pl is closed from E Jackson St to E Jefferson St.
S 16th Pl is closed from E Jackson St to E Jefferson St.
Start Time: 2025-06-19T01:51:30.000-06:00
End Time: 2025-06-21T06:14:35.746-06:00
map local traffic - MAPclose parking lane
close parking lane
Start Time: 2025-06-17T12:44:30.000-06:00
End Time: 2025-07-05T01:00:00.000-06:00
map local traffic - MAPvarious traffic control
various traffic control
Start Time: 2025-06-16T11:43:00.000-06:00
End Time: 2025-10-01T01:00:00.000-06:00
map local traffic - MAPW Madison St is closed from S 7th Ave to S 9th Ave.
W Madison St is closed from S 7th Ave to S 9th Ave.
Start Time: 2025-06-11T15:38:30.000-06:00
End Time: 2025-06-21T06:14:35.746-06:00
map local traffic - MAPClose SB
Close SB
Start Time: 2025-06-09T11:51:00.000-06:00
End Time: 2025-07-13T01:00:00.000-06:00
map local traffic - MAPW Erie St is closed from N Sunset Dr to N Hartford St.
W Erie St is closed from N Sunset Dr to N Hartford St.
Start Time: 2025-05-27T09:23:30.000-06:00
End Time: 2025-06-21T06:14:35.746-06:00
map local traffic - MAPW Myrtle Ave is closed from N 59th Ave to N 58th Ave.
W Myrtle Ave is closed from N 59th Ave to N 58th Ave.
Start Time: 2025-05-13T15:54:30.000-06:00
End Time: 2025-06-28T01:00:00.000-06:00
map local traffic - MAPflagger station
flagger station
Start Time: 2025-05-12T01:00:00.000-06:00
End Time: 2025-07-05T01:00:00.000-06:00
map local traffic - MAPBROADWAY RD - road construction - PAVING
BROADWAY RD - road construction - PAVING
Start Time: 2025-06-20T17:25:00.000-06:00
End Time: 2025-07-01T01:00:00.000-06:00
map local traffic - MAPBROADWAY RD - road construction - GM, AS, CC
BROADWAY RD - road construction - GM, AS, CC
Start Time: 2025-06-20T12:06:30.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAPSHEA BLVD - road construction - Replace Water Service Line
SHEA BLVD - road construction - Replace Water Service Line
Start Time: 2025-06-20T09:30:00.000-06:00
End Time: 2025-06-25T17:30:00.000-06:00
map local traffic - MAP77TH AVE - road construction - Manhole rehab 18-10-113
77TH AVE - road construction - Manhole rehab 18-10-113
Start Time: 2025-06-20T08:00:00.000-06:00
End Time: 2025-07-04T17:00:00.000-06:00
map local traffic - MAP47TH AVE - road construction - MANHOLE REHAB (31-18-131)
47TH AVE - road construction - MANHOLE REHAB (31-18-131)
Start Time: 2025-06-20T08:00:00.000-06:00
End Time: 2025-06-27T16:00:00.000-06:00
map local traffic - MAP36TH ST - road construction - AS, CC
36TH ST - road construction - AS, CC
Start Time: 2025-06-20T01:00:00.000-06:00
End Time: 2025-07-07T01:00:00.000-06:00
map local traffic - MAPRoadwork on E Baseline Rd from S Higley Rd to Greenfield Rd.
Roadwork on E Baseline Rd from S Higley Rd to Greenfield Rd.
Start Time: 2025-06-19T22:59:00.000-06:00
End Time: 2025-06-21T06:14:35.746-06:00
map local traffic - MAPCAMELBACK RD - road construction - PAVING
CAMELBACK RD - road construction - PAVING
Start Time: 2025-06-19T09:30:00.000-06:00
End Time: 2025-07-02T17:00:00.000-06:00
map local traffic - MAP32ND ST - road construction - CC, RT
32ND ST - road construction - CC, RT
Start Time: 2025-06-19T01:00:00.000-06:00
End Time: 2025-06-26T01:00:00.000-06:00
map local traffic - MAP7TH AVE - road construction - UG, PC, DIG, PD
7TH AVE - road construction - UG, PC, DIG, PD
Start Time: 2025-06-18T10:04:00.000-06:00
End Time: 2025-07-07T01:00:00.000-06:00
map local traffic - MAP3820 E Main St - road construction - Westbound right lane closure on Main St. for Ansco to install Gigapower Fiber.
3820 E Main St - road construction - Westbound right lane closure on Main St. for Ansco to install Gigapower Fiber.
Start Time: 2025-06-18T02:30:00.000-06:00
End Time: 2025-06-26T10:00:00.000-06:00
map local traffic - MAP805 N Dobson - road construction - Alternating lane closures on Dobson for Gonzalez Construction to install LSC Fiber.
805 N Dobson - road construction - Alternating lane closures on Dobson for Gonzalez Construction to install LSC Fiber.
Start Time: 2025-06-18T02:30:00.000-06:00
End Time: 2025-07-11T10:00:00.000-06:00
map local traffic - MAP6315 E Main St - road construction - Alternating lane closures on Main St for Northstar to install Google Fiber.
6315 E Main St - road construction - Alternating lane closures on Main St for Northstar to install Google Fiber.
Start Time: 2025-06-16T11:03:00.000-06:00
End Time: 2025-07-11T12:00:00.000-06:00
map local traffic - MAPLong term road construction on E Apache Trl Eastbound from S Ellsworth Rd to S Meridian Rd . 2 Right Lanes Closed. Width Restriction: 11ft 4/10/2025 5:00 AM to 9/10/2025 5:00 AM
Long term road construction on E Apache Trl Eastbound from S Ellsworth Rd to S Meridian Rd . 2 Right Lanes Closed. Width Restriction: 11ft 4/10/2025 5:00 AM to 9/10/2025 5:00 AM
Start Time: 2025-06-15T14:08:00.000-06:00
End Time: 2025-06-22T00:59:00.000-06:00
map local traffic - MAP2005 N Val Vista - road construction - Westbound McKellips right lane closed for Garney to install a new waterline for City of Mesa Engineering.
2005 N Val Vista - road construction - Westbound McKellips right lane closed for Garney to install a new waterline for City of Mesa Engineering.
Start Time: 2025-06-12T16:03:30.000-06:00
End Time: 2025-07-12T17:59:00.000-06:00
map local traffic - MAPBUCKEYE RD - road construction - SE
BUCKEYE RD - road construction - SE
Start Time: 2025-06-12T01:00:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAPGREENWAY RD - road construction - Micro Seal / Edge Millings
GREENWAY RD - road construction - Micro Seal / Edge Millings
Start Time: 2025-06-11T08:02:00.000-06:00
End Time: 2025-06-27T17:00:00.000-06:00
map local traffic - MAPBASELINE RD - road construction - GM
BASELINE RD - road construction - GM
Start Time: 2025-06-09T01:00:00.000-06:00
End Time: 2025-06-28T01:00:00.000-06:00
map local traffic - MAP6759 E University - road construction - Eastbound University right lane closure for Northstar to install Google Fiber.
6759 E University - road construction - Eastbound University right lane closure for Northstar to install Google Fiber.
Start Time: 2025-06-09T00:00:00.000-06:00
End Time: 2025-07-18T10:00:00.000-06:00
map local traffic - MAPLong term road construction on E Apache Trl Westbound from S Sossaman Rd to S Ellsworth Rd . 2 Right Lanes Closed. Width Restriction: 13ft 4/10/2025 5:00 AM to 9/10/2025 5:00 AM
Long term road construction on E Apache Trl Westbound from S Sossaman Rd to S Ellsworth Rd . 2 Right Lanes Closed. Width Restriction: 13ft 4/10/2025 5:00 AM to 9/10/2025 5:00 AM
Start Time: 2025-06-03T14:00:00.000-06:00
End Time: 2025-06-22T00:59:00.000-06:00
map local traffic - MAPLong term road construction on E Apache Trl Westbound from N Ellsworth Rd to N Sossaman Rd . 2 Right Lanes Closed. Width Restriction: 11ft 4/10/2025 5:00 AM to 9/10/2025 5:00 AM
Long term road construction on E Apache Trl Westbound from N Ellsworth Rd to N Sossaman Rd . 2 Right Lanes Closed. Width Restriction: 11ft 4/10/2025 5:00 AM to 9/10/2025 5:00 AM
Start Time: 2025-05-29T18:44:30.000-06:00
End Time: 2025-06-22T00:59:00.000-06:00
map local traffic - MAPE DOUBLETREE RANCH RD / N GAINEY CENTER DR - road construction - EB Doubletree Ranch Rd. median lane, left turn lane restricted at Gainey Center Dr. to Gainey Ranch Rd.; WB Doubletree Ranch Rd. thru traffic shifted to the EB Doubletree Ranch Rd. median lane at Gainey; Ranch Rd. to Gainey Center Dr.; TCP#2: EB Doubletree Ranch Rd. thru traffic shifted to the WB Doubletree Ranch Rd median lane at Gainey; Center Dr.; WB Doubletree Ranch Rd. median lane, left turn lane restricted at Gainey Ranch Rd. to Gainey Center Dr.
E DOUBLETREE RANCH RD / N GAINEY CENTER DR - road construction - EB Doubletree Ranch Rd. median lane, left turn lane restricted at Gainey Center Dr. to Gainey Ranch Rd.; WB Doubletree Ranch Rd. thru traffic shifted to the EB Doubletree Ranch Rd. median lane at Gainey; Ranch Rd. to Gainey Center Dr.; TCP#2: EB Doubletree Ranch Rd. thru traffic shifted to the WB Doubletree Ranch Rd median lane at Gainey; Center Dr.; WB Doubletree Ranch Rd. median lane, left turn lane restricted at Gainey Ranch Rd. to Gainey Center Dr.
Start Time: 2025-05-29T14:44:00.000-06:00
End Time: 2025-10-24T01:00:00.000-06:00
map local traffic - MAPTHOMAS RD - road construction - Installation of new traffic signal foundations/poles/conduit
THOMAS RD - road construction - Installation of new traffic signal foundations/poles/conduit
Start Time: 2025-05-23T16:04:00.000-06:00
End Time: 2025-06-30T17:00:00.000-06:00
map local traffic - MAP3327 S Sossaman - road construction - Northbound and southbound lane shifts on Sossaman for McCain to install sewer and pave shoulders for Arco
3327 S Sossaman - road construction - Northbound and southbound lane shifts on Sossaman for McCain to install sewer and pave shoulders for Arco
Start Time: 2025-05-23T05:47:30.000-06:00
End Time: 2025-07-31T18:00:00.000-06:00
map local traffic - MAPE THOMAS RD / N PIMA RD - road construction - NB Pima Rd thru lane, shoulder restricted through Thomas Rd.; WB Thomas Rd right turn lane, shoulder restricted at Pima Rd.; SB Pima Rd right turn lane, shoulder restricted at Thomas Rd onto Westbound Merge Lane.
E THOMAS RD / N PIMA RD - road construction - NB Pima Rd thru lane, shoulder restricted through Thomas Rd.; WB Thomas Rd right turn lane, shoulder restricted at Pima Rd.; SB Pima Rd right turn lane, shoulder restricted at Thomas Rd onto Westbound Merge Lane.
Start Time: 2025-05-05T19:12:30.000-06:00
End Time: 2025-07-31T17:00:00.000-06:00
map local traffic - MAPUniversity Dr - road construction - Road work, eastbound right lane closed. Slow down in work zones
University Dr - road construction - Road work, eastbound right lane closed. Slow down in work zones
Start Time: 2025-04-22T02:37:41.000-06:00
End Time: 2025-06-27T17:00:00.000-06:00
map local traffic - MAPLong term road construction on E Apache Trl Westbound from N Ellsworth Rd to N Sossaman Rd . 2 Right Lanes Closed. Width Restriction: 11ft 4/10/2025 5:00 AM to 9/10/2025 5:00 AM
Long term road construction on E Apache Trl Westbound from N Ellsworth Rd to N Sossaman Rd . 2 Right Lanes Closed. Width Restriction: 11ft 4/10/2025 5:00 AM to 9/10/2025 5:00 AM
Start Time: 2025-04-10T07:32:00.000-06:00
End Time: 2025-06-22T00:59:00.000-06:00
map local traffic - MAPRoadwork on S Central Ave from Baseline Rd to Broadway Rd.
Roadwork on S Central Ave from Baseline Rd to Broadway Rd.
Start Time: 2025-03-30T20:23:30.000-06:00
End Time: 2025-06-21T06:14:35.746-06:00
map local traffic - MAPRoadwork on S Central Ave from Broadway Rd to Baseline Rd.
Roadwork on S Central Ave from Broadway Rd to Baseline Rd.
Start Time: 2025-03-29T15:08:30.000-06:00
End Time: 2025-06-21T06:14:35.746-06:00
map local traffic - MAPROOSEVELT ST - road construction - Sidewalk and driveway work
ROOSEVELT ST - road construction - Sidewalk and driveway work
Start Time: 2025-06-18T14:03:30.000-06:00
End Time: 2025-07-12T01:00:00.000-06:00
map local traffic - MAPMADISON ST - road construction - sewer work
MADISON ST - road construction - sewer work
Start Time: 2025-06-18T09:17:00.000-06:00
End Time: 2025-07-01T01:00:00.000-06:00
map local traffic - MAPComstock - road construction - Utility
Comstock - road construction - Utility
Start Time: 2025-06-17T18:00:00.000-06:00
End Time: 2025-06-26T18:00:00.000-06:00
map local traffic - MAPComstock - road construction - Utility
Comstock - road construction - Utility
Start Time: 2025-06-17T18:00:00.000-06:00
End Time: 2025-06-26T18:00:00.000-06:00
map local traffic - MAPGRANDVIEW RD - road construction - BO
GRANDVIEW RD - road construction - BO
Start Time: 2025-06-17T08:02:30.000-06:00
End Time: 2025-07-16T01:00:00.000-06:00
map local traffic - MAPFAIRMOUNT AVE - road construction - Boring/Drilling
FAIRMOUNT AVE - road construction - Boring/Drilling
Start Time: 2025-06-17T08:00:00.000-06:00
End Time: 2025-06-24T19:30:00.000-06:00
map local traffic - MAP5TH AVE - road construction - BO, TR
5TH AVE - road construction - BO, TR
Start Time: 2025-06-17T01:00:00.000-06:00
End Time: 2025-07-01T01:00:00.000-06:00
map local traffic - MAPVIRGINIA AVE - road construction - bo
VIRGINIA AVE - road construction - bo
Start Time: 2025-06-17T01:00:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAPOSBORN RD - road construction - Concrete ADA Ramps
OSBORN RD - road construction - Concrete ADA Ramps
Start Time: 2025-06-16T16:02:30.000-06:00
End Time: 2025-08-01T01:00:00.000-06:00
map local traffic - MAPPLEASANT DR - road construction - COX TO BORE 532' TO INSTALL NEW CATV CONDUIT FOR SERVICE REPAIR ORDER.
PLEASANT DR - road construction - COX TO BORE 532' TO INSTALL NEW CATV CONDUIT FOR SERVICE REPAIR ORDER.
Start Time: 2025-06-16T16:02:30.000-06:00
End Time: 2025-07-02T18:00:00.000-06:00
map local traffic - MAP2ND ST - road construction - NS
2ND ST - road construction - NS
Start Time: 2025-06-16T16:02:30.000-06:00
End Time: 2025-07-14T01:00:00.000-06:00
map local traffic - MAP44TH ST - road construction - Asphalt/Concrete Restoration
44TH ST - road construction - Asphalt/Concrete Restoration
Start Time: 2025-06-16T09:30:00.000-06:00
End Time: 2025-06-27T17:00:00.000-06:00
map local traffic - MAPLINCOLN ST - road construction - Pothole for water utility
LINCOLN ST - road construction - Pothole for water utility
Start Time: 2025-06-16T09:30:00.000-06:00
End Time: 2025-06-30T17:00:00.000-06:00
map local traffic - MAPMADISON ST - road construction - NS
MADISON ST - road construction - NS
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-06-30T01:00:00.000-06:00
map local traffic - MAPELLIOT RD - road construction - GM
ELLIOT RD - road construction - GM
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-06-28T01:00:00.000-06:00
map local traffic - MAPROOSEVELT ST - road construction - AB
ROOSEVELT ST - road construction - AB
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-06-30T01:00:00.000-06:00
map local traffic - MAP44TH ST - road construction - SE
44TH ST - road construction - SE
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-06-30T01:00:00.000-06:00
map local traffic - MAPWASHINGTON ST - road construction - SE
WASHINGTON ST - road construction - SE
Start Time: 2025-06-15T23:09:00.000-06:00
End Time: 2025-07-04T01:00:00.000-06:00
map local traffic - MAPPOLK ST - road construction - Storm Drain Installation
POLK ST - road construction - Storm Drain Installation
Start Time: 2025-06-14T09:30:00.000-06:00
End Time: 2025-06-28T17:00:00.000-06:00
map local traffic - MAPBELL RD - road construction - Sewer Rehabilitation MH 45 EAST
BELL RD - road construction - Sewer Rehabilitation MH 45 EAST
Start Time: 2025-06-14T09:30:00.000-06:00
End Time: 2025-06-28T17:00:00.000-06:00
map local traffic - MAPGREENWAY RD - road construction - SE
GREENWAY RD - road construction - SE
Start Time: 2025-06-13T14:02:30.000-06:00
End Time: 2025-07-03T01:00:00.000-06:00
map local traffic - MAP44TH ST - road construction - Asphalt/Concrete Restoration
44TH ST - road construction - Asphalt/Concrete Restoration
Start Time: 2025-06-13T09:30:00.000-06:00
End Time: 2025-06-27T17:00:00.000-06:00
map local traffic - MAP25TH ST - road construction - SIDEWALK WORK /DRIVEWAY
25TH ST - road construction - SIDEWALK WORK /DRIVEWAY
Start Time: 2025-06-13T01:00:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAPARCADIA DR - road construction - Installing Speed Cushions
ARCADIA DR - road construction - Installing Speed Cushions
Start Time: 2025-06-12T09:30:00.000-06:00
End Time: 2025-07-12T17:00:00.000-06:00
map local traffic - MAPARCADIA DR - road construction - Installing Speed Cushions
ARCADIA DR - road construction - Installing Speed Cushions
Start Time: 2025-06-12T09:30:00.000-06:00
End Time: 2025-07-12T17:00:00.000-06:00
map local traffic - MAPAPACHE ST - road construction - Sign Placement
APACHE ST - road construction - Sign Placement
Start Time: 2025-06-12T07:00:00.000-06:00
End Time: 2025-06-23T17:00:00.000-06:00
map local traffic - MAP87TH AVE - road construction - SC
87TH AVE - road construction - SC
Start Time: 2025-06-12T01:00:00.000-06:00
End Time: 2025-06-26T01:00:00.000-06:00
map local traffic - MAPSOUTH MOUNTAIN AVE - road construction - Asphalt/Concrete Restoration
SOUTH MOUNTAIN AVE - road construction - Asphalt/Concrete Restoration
Start Time: 2025-06-11T09:30:00.000-06:00
End Time: 2025-06-27T17:00:00.000-06:00
map local traffic - MAPMULBERRY ST - road construction - BO/TR/AS/CC
MULBERRY ST - road construction - BO/TR/AS/CC
Start Time: 2025-06-10T16:03:30.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAPMCKINLEY ST - road construction - CC/AS RT
MCKINLEY ST - road construction - CC/AS RT
Start Time: 2025-06-10T01:00:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAP43RD PL - road construction - REMOVE AND REPLACE SIDEWALK
43RD PL - road construction - REMOVE AND REPLACE SIDEWALK
Start Time: 2025-06-09T07:00:00.000-06:00
End Time: 2025-06-27T15:00:00.000-06:00
map local traffic - MAPCOOLIDGE ST - road construction - BO, CC, AS, PH, PC, RT, TR, UG
COOLIDGE ST - road construction - BO, CC, AS, PH, PC, RT, TR, UG
Start Time: 2025-06-09T01:00:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAP3RD AVE - road construction - SE
3RD AVE - road construction - SE
Start Time: 2025-06-09T01:00:00.000-06:00
End Time: 2025-06-23T01:00:00.000-06:00
map local traffic - MAPROOSEVELT ST - road construction - Asphalt/Concrete Restoration
ROOSEVELT ST - road construction - Asphalt/Concrete Restoration
Start Time: 2025-06-06T09:30:00.000-06:00
End Time: 2025-07-04T17:00:00.000-06:00
map local traffic - MAP52ND ST - road construction - BO
52ND ST - road construction - BO
Start Time: 2025-06-04T16:02:00.000-06:00
End Time: 2025-06-23T01:00:00.000-06:00
map local traffic - MAP430 N DOBSON - road construction - B & F to do sewer and water work for the City of Mesa CP0834Q017. with multiple restrictions in the intersection of N Dobson Rd and W University Dr
430 N DOBSON - road construction - B & F to do sewer and water work for the City of Mesa CP0834Q017. with multiple restrictions in the intersection of N Dobson Rd and W University Dr
Start Time: 2025-06-03T18:00:00.000-06:00
End Time: 2025-07-10T18:00:00.000-06:00
map local traffic - MAPPALM LN - road construction - REMOVE AND REPLACE SIDEWALK
PALM LN - road construction - REMOVE AND REPLACE SIDEWALK
Start Time: 2025-06-03T07:00:00.000-06:00
End Time: 2025-06-27T15:00:00.000-06:00
map local traffic - MAP91ST AVE - road construction - INSTALL 1" SERVICE
91ST AVE - road construction - INSTALL 1" SERVICE
Start Time: 2025-06-02T09:30:00.000-06:00
End Time: 2025-06-22T16:00:00.000-06:00
map local traffic - MAPINDIAN SCHOOL RD - road construction - TRAFFIC SIGNALS
INDIAN SCHOOL RD - road construction - TRAFFIC SIGNALS
Start Time: 2025-06-02T09:30:00.000-06:00
End Time: 2025-07-07T17:00:00.000-06:00
map local traffic - MAP51ST ST - road construction - PH, BO, RT, CC, AS
51ST ST - road construction - PH, BO, RT, CC, AS
Start Time: 2025-06-02T01:00:00.000-06:00
End Time: 2025-06-30T01:00:00.000-06:00
map local traffic - MAPALTA VISTA RD - road construction - NS
ALTA VISTA RD - road construction - NS
Start Time: 2025-06-02T01:00:00.000-06:00
End Time: 2025-06-29T01:00:00.000-06:00
map local traffic - MAP17TH ST - road construction - Sewer Adjustments
17TH ST - road construction - Sewer Adjustments
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-24T01:00:00.000-06:00
map local traffic - MAP2ND AVE - road construction - Construction on new build/Utility in Alley
2ND AVE - road construction - Construction on new build/Utility in Alley
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-07-16T01:00:00.000-06:00
map local traffic - MAP15TH ST - road construction - BO/TR/AS/CC
15TH ST - road construction - BO/TR/AS/CC
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAPWARNER ELLIOT LOOP - road construction - ADA RAMP/Patch Back
WARNER ELLIOT LOOP - road construction - ADA RAMP/Patch Back
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-27T17:00:00.000-06:00
map local traffic - MAP11TH AVE - road construction - sewer work
11TH AVE - road construction - sewer work
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-07-01T01:00:00.000-06:00
map local traffic - MAP3RD AVE - road construction - UTILITY ADJUSTMENT
3RD AVE - road construction - UTILITY ADJUSTMENT
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-23T15:00:00.000-06:00
map local traffic - MAPWILLETTA ST - road construction - APS power run
WILLETTA ST - road construction - APS power run
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-23T17:00:00.000-06:00
map local traffic - MAP47TH AVE - road construction - BF, BO,PI, PH, PC, RT, UG
47TH AVE - road construction - BF, BO,PI, PH, PC, RT, UG
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-07-08T01:00:00.000-06:00
map local traffic - MAP24TH ST - road construction - APS power run
24TH ST - road construction - APS power run
Start Time: 2025-05-28T09:30:00.000-06:00
End Time: 2025-06-23T17:00:00.000-06:00
map local traffic - MAPBELL RD - road construction - Sewer Rehabilitation MH 46 & 47
BELL RD - road construction - Sewer Rehabilitation MH 46 & 47
Start Time: 2025-05-17T07:16:00.000-06:00
End Time: 2025-07-04T17:00:00.000-06:00
map local traffic - MAPvarious traffic control
various traffic control
Start Time: 2025-06-04T17:20:00.000-06:00
End Time: 2025-07-04T01:00:00.000-06:00