- MAPAirport Rd - road construction - Road work, flagging operations, be prepared to stop
Airport Rd - road construction - Road work, flagging operations, be prepared to stop
Start Time: 2025-06-09T08:00:00.000-06:00
End Time: 2025-07-18T16:30:00.000-06:00
map local traffic - MAPRoadwork on W Indian School Rd from AZ-303/Estrella Fwy to N Citrus Rd (Indian School Rd).
Roadwork on W Indian School Rd from AZ-303/Estrella Fwy to N Citrus Rd (Indian School Rd).
Start Time: 2025-06-20T20:56:30.000-06:00
End Time: 2025-06-21T06:14:35.746-06:00
map local traffic - MAPS MIller Rd - road construction - Paving
S MIller Rd - road construction - Paving
Start Time: 2025-06-20T18:25:00.000-06:00
End Time: 2025-06-25T17:00:00.000-06:00
map local traffic - MAPvarious traffic control
various traffic control
Start Time: 2025-06-16T11:43:00.000-06:00
End Time: 2025-10-01T01:00:00.000-06:00
map local traffic - MAPvarious traffic control
various traffic control
Start Time: 2025-06-04T09:41:00.000-06:00
End Time: 2025-08-01T01:00:00.000-06:00
map local traffic - MAPNorthern Ave - road construction - Road work, road closed. Use detour route
Northern Ave - road construction - Road work, road closed. Use detour route
Start Time: 2025-06-02T01:00:00.000-06:00
End Time: 2025-06-27T13:00:00.000-06:00
map local traffic - MAPN Cotton Ln is closed from W Waddell Rd to W Peoria Ave.
N Cotton Ln is closed from W Waddell Rd to W Peoria Ave.
Start Time: 2025-05-27T07:56:00.000-06:00
End Time: 2025-06-21T06:14:35.746-06:00
map local traffic - MAPW Lower Buckeye Rd is closed from S Miller Rd to S 247th Ave.
W Lower Buckeye Rd is closed from S Miller Rd to S 247th Ave.
Start Time: 2025-05-27T07:47:00.000-06:00
End Time: 2025-06-21T06:14:35.746-06:00
map local traffic - MAPShift traffic to the east
Shift traffic to the east
Start Time: 2025-05-19T01:00:00.000-06:00
End Time: 2025-06-28T01:00:00.000-06:00
map local traffic - MAPW Myrtle Ave is closed from N 59th Ave to N 58th Ave.
W Myrtle Ave is closed from N 59th Ave to N 58th Ave.
Start Time: 2025-05-13T15:54:30.000-06:00
End Time: 2025-06-28T01:00:00.000-06:00
map local traffic - MAPflagger station
flagger station
Start Time: 2025-05-12T01:00:00.000-06:00
End Time: 2025-07-05T01:00:00.000-06:00
map local traffic - MAPBROADWAY RD - road construction - PAVING
BROADWAY RD - road construction - PAVING
Start Time: 2025-06-20T17:25:00.000-06:00
End Time: 2025-07-01T01:00:00.000-06:00
map local traffic - MAPBROADWAY RD - road construction - GM, AS, CC
BROADWAY RD - road construction - GM, AS, CC
Start Time: 2025-06-20T12:06:30.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAP77TH AVE - road construction - Manhole rehab 18-10-113
77TH AVE - road construction - Manhole rehab 18-10-113
Start Time: 2025-06-20T08:00:00.000-06:00
End Time: 2025-07-04T17:00:00.000-06:00
map local traffic - MAPN Miller Rd & W Broadway Rd - road construction - SB flagman closure from W Spencer Run to 300' s/o Broadway rd.
N Miller Rd & W Broadway Rd - road construction - SB flagman closure from W Spencer Run to 300' s/o Broadway rd.
Start Time: 2025-06-19T01:00:00.000-06:00
End Time: 2025-06-26T13:00:00.000-06:00
map local traffic - MAPN Miller Rd & W Broadway Rd - road construction - SB flagman closure from W Spencer Run to 300' s/o Broadway rd.
N Miller Rd & W Broadway Rd - road construction - SB flagman closure from W Spencer Run to 300' s/o Broadway rd.
Start Time: 2025-06-19T01:00:00.000-06:00
End Time: 2025-06-26T13:00:00.000-06:00
map local traffic - MAPBASELINE RD - road construction - GM
BASELINE RD - road construction - GM
Start Time: 2025-06-09T01:00:00.000-06:00
End Time: 2025-06-28T01:00:00.000-06:00
map local traffic - MAPRoadwork on S Cotton Ln from S Estrella Pkwy (Cotton Ln) to AZ-85.
Roadwork on S Cotton Ln from S Estrella Pkwy (Cotton Ln) to AZ-85.
Start Time: 2025-06-06T17:17:00.000-06:00
End Time: 2025-06-21T06:14:35.746-06:00
map local traffic - MAPW Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
W Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
Start Time: 2025-06-05T08:02:30.000-06:00
End Time: 2025-07-04T18:00:00.000-06:00
map local traffic - MAPW Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
W Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
Start Time: 2025-06-05T08:02:30.000-06:00
End Time: 2025-07-04T18:00:00.000-06:00
map local traffic - MAPW Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
W Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
Start Time: 2025-06-05T08:02:30.000-06:00
End Time: 2025-07-04T18:00:00.000-06:00
map local traffic - MAPW Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
W Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
Start Time: 2025-06-05T08:02:30.000-06:00
End Time: 2025-07-04T18:00:00.000-06:00
map local traffic - MAPW Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
W Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
Start Time: 2025-06-05T08:02:30.000-06:00
End Time: 2025-07-04T18:00:00.000-06:00
map local traffic - MAPW Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
W Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
Start Time: 2025-06-05T08:02:30.000-06:00
End Time: 2025-07-04T18:00:00.000-06:00
map local traffic - MAPW Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
W Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
Start Time: 2025-06-05T08:02:30.000-06:00
End Time: 2025-07-04T18:00:00.000-06:00
map local traffic - MAPW Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
W Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
Start Time: 2025-06-05T08:02:30.000-06:00
End Time: 2025-07-04T18:00:00.000-06:00
map local traffic - MAPW Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
W Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
Start Time: 2025-06-05T08:02:30.000-06:00
End Time: 2025-07-04T18:00:00.000-06:00
map local traffic - MAPW Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
W Kendall St - Winslow Ave - Whyman St - Miami St - Globe Ave - Westpark Loop - Crownking Rd - 258th Dr - 258th Ave - 257th Ln - 257th Dr - 257th Ave - road construction - parking lane closures
Start Time: 2025-06-05T08:02:30.000-06:00
End Time: 2025-07-04T18:00:00.000-06:00
map local traffic - MAP99th Ave - road construction - Road work, northbound right lane closed. Slow down in work zones
99th Ave - road construction - Road work, northbound right lane closed. Slow down in work zones
Start Time: 2025-05-30T08:57:00.000-06:00
End Time: 2025-06-30T17:00:00.000-06:00
map local traffic - MAPTHOMAS RD - road construction - Installation of new traffic signal foundations/poles/conduit
THOMAS RD - road construction - Installation of new traffic signal foundations/poles/conduit
Start Time: 2025-05-23T16:04:00.000-06:00
End Time: 2025-06-30T17:00:00.000-06:00
map local traffic - MAPMC 85 - road construction - Road work, left lane closed. Slow down in work zones
MC 85 - road construction - Road work, left lane closed. Slow down in work zones
Start Time: 2025-04-21T10:36:00.000-06:00
End Time: 2025-07-29T13:00:00.000-06:00
map local traffic - MAPPERRYVILLE RD AND ROOSEVELT ST - road construction - ROAD IMPROVEMENTS
PERRYVILLE RD AND ROOSEVELT ST - road construction - ROAD IMPROVEMENTS
Start Time: 2025-06-18T01:00:00.000-06:00
End Time: 2025-07-18T12:59:00.000-06:00
map local traffic - MAPRoadwork on N 163rd Ave from Grand Ave to W Pinnacle Peak Rd.
Roadwork on N 163rd Ave from Grand Ave to W Pinnacle Peak Rd.
Start Time: 2025-06-17T17:16:30.000-06:00
End Time: 2025-06-21T06:14:35.746-06:00
map local traffic - MAPRoadwork on W Happy Valley Rd from W McMicken Way to N Dysart Rd.
Roadwork on W Happy Valley Rd from W McMicken Way to N Dysart Rd.
Start Time: 2025-06-17T08:15:30.000-06:00
End Time: 2025-06-21T06:14:35.746-06:00
map local traffic - MAPVIRGINIA AVE - road construction - bo
VIRGINIA AVE - road construction - bo
Start Time: 2025-06-17T01:00:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAPOSBORN RD - road construction - Concrete ADA Ramps
OSBORN RD - road construction - Concrete ADA Ramps
Start Time: 2025-06-16T16:02:30.000-06:00
End Time: 2025-08-01T01:00:00.000-06:00
map local traffic - MAPRoadwork on W Happy Valley Rd from N 132nd Dr to W Hackamore Dr.
Roadwork on W Happy Valley Rd from N 132nd Dr to W Hackamore Dr.
Start Time: 2025-06-16T11:14:30.000-06:00
End Time: 2025-06-21T06:14:35.746-06:00
map local traffic - MAP6th Ave 5th Ave4th Ave 3rd Ave Apache Blvd Baseline RdAlleys - road construction - Bore
6th Ave 5th Ave4th Ave 3rd Ave Apache Blvd Baseline RdAlleys - road construction - Bore
Start Time: 2025-06-16T08:03:00.000-06:00
End Time: 2025-07-17T06:00:00.000-06:00
map local traffic - MAP6th Ave 5th Ave4th Ave 3rd Ave Apache Blvd Baseline RdAlleys - road construction - Bore
6th Ave 5th Ave4th Ave 3rd Ave Apache Blvd Baseline RdAlleys - road construction - Bore
Start Time: 2025-06-16T08:00:00.000-06:00
End Time: 2025-07-17T06:00:00.000-06:00
map local traffic - MAP6th Ave 5th Ave4th Ave 3rd Ave Apache Blvd Baseline RdAlleys - road construction - Bore
6th Ave 5th Ave4th Ave 3rd Ave Apache Blvd Baseline RdAlleys - road construction - Bore
Start Time: 2025-06-16T08:00:00.000-06:00
End Time: 2025-07-17T06:00:00.000-06:00
map local traffic - MAP6th Ave 5th Ave4th Ave 3rd Ave Apache Blvd Baseline RdAlleys - road construction - Bore
6th Ave 5th Ave4th Ave 3rd Ave Apache Blvd Baseline RdAlleys - road construction - Bore
Start Time: 2025-06-16T08:00:00.000-06:00
End Time: 2025-07-17T06:00:00.000-06:00
map local traffic - MAP6th Ave 5th Ave4th Ave 3rd Ave Apache Blvd Baseline RdAlleys - road construction - Bore
6th Ave 5th Ave4th Ave 3rd Ave Apache Blvd Baseline RdAlleys - road construction - Bore
Start Time: 2025-06-16T08:00:00.000-06:00
End Time: 2025-07-17T06:00:00.000-06:00
map local traffic - MAP6th Ave 5th Ave4th Ave 3rd Ave Apache Blvd Baseline RdAlleys - road construction - Bore
6th Ave 5th Ave4th Ave 3rd Ave Apache Blvd Baseline RdAlleys - road construction - Bore
Start Time: 2025-06-16T08:00:00.000-06:00
End Time: 2025-07-17T06:00:00.000-06:00
map local traffic - MAP6th Ave 5th Ave4th Ave 3rd Ave Apache Blvd Baseline RdAlleys - road construction - Bore
6th Ave 5th Ave4th Ave 3rd Ave Apache Blvd Baseline RdAlleys - road construction - Bore
Start Time: 2025-06-16T08:00:00.000-06:00
End Time: 2025-07-17T06:00:00.000-06:00
map local traffic - MAPJackson Ave - road construction - New Driveway
Jackson Ave - road construction - New Driveway
Start Time: 2025-06-16T02:00:00.000-06:00
End Time: 2025-06-22T00:45:00.000-06:00
map local traffic - MAPRoadwork on W Lower Buckeye Rd from S Apache Rd to S 247th Ave.
Roadwork on W Lower Buckeye Rd from S Apache Rd to S 247th Ave.
Start Time: 2025-06-15T11:08:00.000-06:00
End Time: 2025-06-21T06:14:35.746-06:00
map local traffic - MAP87TH AVE - road construction - SC
87TH AVE - road construction - SC
Start Time: 2025-06-12T01:00:00.000-06:00
End Time: 2025-06-26T01:00:00.000-06:00
map local traffic - MAPMCKINLEY ST - road construction - CC/AS RT
MCKINLEY ST - road construction - CC/AS RT
Start Time: 2025-06-10T01:00:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAPShoulder closure for Apache Rd and Mobile Ln. - road construction - Bore holes
Shoulder closure for Apache Rd and Mobile Ln. - road construction - Bore holes
Start Time: 2025-06-09T09:01:30.000-06:00
End Time: 2025-07-09T15:00:00.000-06:00
map local traffic - MAPWoodlands Ave to Wshington st194th Ln to 193rd Dr - road construction - Bore for Wyyerd
Woodlands Ave to Wshington st194th Ln to 193rd Dr - road construction - Bore for Wyyerd
Start Time: 2025-06-06T11:01:30.000-06:00
End Time: 2025-07-18T17:00:00.000-06:00
map local traffic - MAPWoodlands Ave to Wshington st194th Ln to 193rd Dr - road construction - Bore for Wyyerd
Woodlands Ave to Wshington st194th Ln to 193rd Dr - road construction - Bore for Wyyerd
Start Time: 2025-06-06T11:01:30.000-06:00
End Time: 2025-07-18T17:00:00.000-06:00
map local traffic - MAPWoodlands Ave to Wshington st194th Ln to 193rd Dr - road construction - Bore for Wyyerd
Woodlands Ave to Wshington st194th Ln to 193rd Dr - road construction - Bore for Wyyerd
Start Time: 2025-06-06T11:01:30.000-06:00
End Time: 2025-07-18T17:00:00.000-06:00
map local traffic - MAPWoodlands Ave to Wshington st194th Ln to 193rd Dr - road construction - Bore for Wyyerd
Woodlands Ave to Wshington st194th Ln to 193rd Dr - road construction - Bore for Wyyerd
Start Time: 2025-06-06T11:01:30.000-06:00
End Time: 2025-07-18T17:00:00.000-06:00
map local traffic - MAPWoodlands Ave to Wshington st194th Ln to 193rd Dr - road construction - Bore for Wyyerd
Woodlands Ave to Wshington st194th Ln to 193rd Dr - road construction - Bore for Wyyerd
Start Time: 2025-06-06T11:01:30.000-06:00
End Time: 2025-07-18T17:00:00.000-06:00
map local traffic - MAPWoodlands Ave to Wshington st194th Ln to 193rd Dr - road construction - Bore for Wyyerd
Woodlands Ave to Wshington st194th Ln to 193rd Dr - road construction - Bore for Wyyerd
Start Time: 2025-06-06T11:01:30.000-06:00
End Time: 2025-07-18T17:00:00.000-06:00
map local traffic - MAP241st Ave and Yuma Rd - road construction - Fiber for Wyyred.
241st Ave and Yuma Rd - road construction - Fiber for Wyyred.
Start Time: 2025-06-05T09:01:30.000-06:00
End Time: 2025-06-27T16:30:00.000-06:00
map local traffic - MAPWoodlands Ave to Washington St193rd Ave to W Vista de Montana Pkwy - road construction - Bore for Wyyerd
Woodlands Ave to Washington St193rd Ave to W Vista de Montana Pkwy - road construction - Bore for Wyyerd
Start Time: 2025-06-05T09:01:30.000-06:00
End Time: 2025-07-11T17:00:00.000-06:00
map local traffic - MAPWoodlands Ave to Washington St193rd Ave to W Vista de Montana Pkwy - road construction - Bore for Wyyerd
Woodlands Ave to Washington St193rd Ave to W Vista de Montana Pkwy - road construction - Bore for Wyyerd
Start Time: 2025-06-05T08:02:30.000-06:00
End Time: 2025-07-11T17:00:00.000-06:00
map local traffic - MAP241st Ave and Yuma Rd - road construction - Fiber for Wyyred.
241st Ave and Yuma Rd - road construction - Fiber for Wyyred.
Start Time: 2025-06-05T08:00:00.000-06:00
End Time: 2025-06-27T16:30:00.000-06:00
map local traffic - MAP241st Ave and Yuma Rd - road construction - Fiber for Wyyred.
241st Ave and Yuma Rd - road construction - Fiber for Wyyred.
Start Time: 2025-06-05T08:00:00.000-06:00
End Time: 2025-06-27T16:30:00.000-06:00
map local traffic - MAP241st Ave and Yuma Rd - road construction - Fiber for Wyyred.
241st Ave and Yuma Rd - road construction - Fiber for Wyyred.
Start Time: 2025-06-05T08:00:00.000-06:00
End Time: 2025-06-27T16:30:00.000-06:00
map local traffic - MAP241st Ave and Yuma Rd - road construction - Fiber for Wyyred.
241st Ave and Yuma Rd - road construction - Fiber for Wyyred.
Start Time: 2025-06-05T08:00:00.000-06:00
End Time: 2025-06-27T16:30:00.000-06:00
map local traffic - MAP241st Ave and Yuma Rd - road construction - Fiber for Wyyred.
241st Ave and Yuma Rd - road construction - Fiber for Wyyred.
Start Time: 2025-06-05T08:00:00.000-06:00
End Time: 2025-06-27T16:30:00.000-06:00
map local traffic - MAP241st Ave and Yuma Rd - road construction - Fiber for Wyyred.
241st Ave and Yuma Rd - road construction - Fiber for Wyyred.
Start Time: 2025-06-05T08:00:00.000-06:00
End Time: 2025-06-27T16:30:00.000-06:00
map local traffic - MAP241st Ave and Yuma Rd - road construction - Fiber for Wyyred.
241st Ave and Yuma Rd - road construction - Fiber for Wyyred.
Start Time: 2025-06-05T08:00:00.000-06:00
End Time: 2025-06-27T16:30:00.000-06:00
map local traffic - MAPCharter Oak Rd - road construction - Micro Trench project. Expect lane and parking restrictions.
Charter Oak Rd - road construction - Micro Trench project. Expect lane and parking restrictions.
Start Time: 2025-06-03T13:01:30.000-06:00
End Time: 2025-07-03T16:00:00.000-06:00
map local traffic - MAPCharter Oak Rd - road construction - Micro trench project. Expect lane and parking restrictions
Charter Oak Rd - road construction - Micro trench project. Expect lane and parking restrictions
Start Time: 2025-06-03T12:17:30.000-06:00
End Time: 2025-07-03T16:00:00.000-06:00
map local traffic - MAPColumbine Dr - road construction - Micro trench project. Expect lane and parking restrictions.
Columbine Dr - road construction - Micro trench project. Expect lane and parking restrictions.
Start Time: 2025-06-03T12:13:32.000-06:00
End Time: 2025-07-03T16:00:00.000-06:00
map local traffic - MAP91ST AVE - road construction - INSTALL 1" SERVICE
91ST AVE - road construction - INSTALL 1" SERVICE
Start Time: 2025-06-02T09:30:00.000-06:00
End Time: 2025-06-22T16:00:00.000-06:00
map local traffic - MAPINDIAN SCHOOL RD - road construction - TRAFFIC SIGNALS
INDIAN SCHOOL RD - road construction - TRAFFIC SIGNALS
Start Time: 2025-06-02T09:30:00.000-06:00
End Time: 2025-07-07T17:00:00.000-06:00
map local traffic - MAP47TH AVE - road construction - BF, BO,PI, PH, PC, RT, UG
47TH AVE - road construction - BF, BO,PI, PH, PC, RT, UG
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-07-08T01:00:00.000-06:00
map local traffic - MAPWestpark Loop and Warner St - road construction - Mill and overlay of Westpark loop roundabout. Concrete curb and sidewalk.
Westpark Loop and Warner St - road construction - Mill and overlay of Westpark loop roundabout. Concrete curb and sidewalk.
Start Time: 2025-05-30T08:57:00.000-06:00
End Time: 2025-06-30T17:00:00.000-06:00
map local traffic - MAPWestpark Loop and Warner St - road construction - Mill and overlay of Westpark loop roundabout. Concrete curb and sidewalk.
Westpark Loop and Warner St - road construction - Mill and overlay of Westpark loop roundabout. Concrete curb and sidewalk.
Start Time: 2025-05-30T08:57:00.000-06:00
End Time: 2025-06-30T17:00:00.000-06:00
map local traffic - MAPWestpark Loop and Warner St - road construction - Mill and overlay of Westpark loop roundabout. Concrete curb and sidewalk.
Westpark Loop and Warner St - road construction - Mill and overlay of Westpark loop roundabout. Concrete curb and sidewalk.
Start Time: 2025-05-30T08:57:00.000-06:00
End Time: 2025-06-30T17:00:00.000-06:00
map local traffic - MAPGranite Vista Loop S - road construction - Road work, flagging operations, be prepared to stop
Granite Vista Loop S - road construction - Road work, flagging operations, be prepared to stop
Start Time: 2025-05-15T09:27:00.000-06:00
End Time: 2025-06-27T17:00:00.000-06:00
map local traffic - MAPOlive Ave - road construction - Lane shifts due to road work. Slow down in work zones
Olive Ave - road construction - Lane shifts due to road work. Slow down in work zones
Start Time: 2025-05-12T09:30:00.000-06:00
End Time: 2025-07-18T13:00:00.000-06:00
map local traffic - MAPBrown St - road construction - Micro trench project. Expect lane and parking restrictions.
Brown St - road construction - Micro trench project. Expect lane and parking restrictions.
Start Time: 2025-05-12T08:27:00.000-06:00
End Time: 2025-07-11T18:00:00.000-06:00
map local traffic - MAPN Sun Valley PKwy - road construction - Place pre warners i shoulder
N Sun Valley PKwy - road construction - Place pre warners i shoulder
Start Time: 2025-05-07T15:17:30.000-06:00
End Time: 2026-03-31T18:00:00.000-06:00
map local traffic - MAPCovey Ln and Desert Vista Blvd - road construction - Install Distribution Line new for Well# 3 to Treatment Plant
Covey Ln and Desert Vista Blvd - road construction - Install Distribution Line new for Well# 3 to Treatment Plant
Start Time: 2025-05-05T01:00:00.000-06:00
End Time: 2025-06-27T17:00:00.000-06:00
map local traffic - MAPvarious traffic control
various traffic control
Start Time: 2025-06-04T17:20:00.000-06:00
End Time: 2025-07-04T01:00:00.000-06:00
map local traffic