    Stationary traffic on I-15 S from Seven Mile Rd/Exit 234 (I-15) to US-287/Exit 228 (I-15) due to roadwork.
    Stationary traffic on I-15 S from Seven Mile Rd/Exit 234 (I-15) to US-287/Exit 228 (I-15) due to roadwork.
    Start Time: 2024-04-19T03:55:30.000-06:00
    End Time: 2024-04-19T04:40:30.000-06:00
    maplocal traffic
  • MAP
    The following road construction project is in progress: road construction with delays, reduced speed limit, two way traffic, and width limit 14 ft until further notice. Two-way traffic configuration using crossovers, reduced speed limit, 14 foot width restriction due to road work on I-15 from mile post 221.7 to 229.1, near Wolf Creek. Vehicles impacted by these restrictions will be piloted through the project between 3:00 am and 6:00 am Monday through Friday. Expect up to 3-hour delays while piloting operations occur. Piloting operations will not occur on weekends or holidays. Oversized loads may call (406) 490-8390 for more information. The northbound 228 on-ramp is closed with a detour set up routing traffic south to the northbound 226 on-ramp at the Wolf Creek interchange. Monday through Friday between 3:00 am and 6:00 am, Interstate 15 traffic will be stopped while piloting operations occur. Expect up to 3-hour delays while piloting operations occur.
    The following road construction project is in progress: road construction with delays, reduced speed limit, two way traffic, and width limit 14 ft until further notice. Two-way traffic configuration using crossovers, reduced speed limit, 14 foot width restriction due to road work on I-15 from mile post 221.7 to 229.1, near Wolf Creek. Vehicles impacted by these restrictions will be piloted through the project between 3:00 am and 6:00 am Monday through Friday. Expect up to 3-hour delays while piloting operations occur. Piloting operations will not occur on weekends or holidays. Oversized loads may call (406) 490-8390 for more information. The northbound 228 on-ramp is closed with a detour set up routing traffic south to the northbound 226 on-ramp at the Wolf Creek interchange. Monday through Friday between 3:00 am and 6:00 am, Interstate 15 traffic will be stopped while piloting operations occur. Expect up to 3-hour delays while piloting operations occur.
    Start Time: 2024-04-15T14:29:00.000-06:00
    End Time: 2024-04-19T06:00:00.000-06:00