Constructions near I 17 exit 198
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPE Princess Dr is closed from N Hayden Rd to N 79th Way.
E Princess Dr is closed from N Hayden Rd to N 79th Way.
Start Time: 2024-05-07T04:07:26.000-06:00
End Time: 2024-05-11T00:59:00.000-06:00
map local traffic - MAPE Princess Dr is closed from E Campo Bello Dr to N Hayden Rd.
E Princess Dr is closed from E Campo Bello Dr to N Hayden Rd.
Start Time: 2024-05-07T03:12:03.000-06:00
End Time: 2024-05-10T00:59:00.000-06:00
map local traffic - MAPN 45th Ave is closed from W Olive Ave to W Golden Ln.
N 45th Ave is closed from W Olive Ave to W Golden Ln.
Start Time: 2024-05-07T02:19:18.000-06:00
End Time: 2024-05-10T00:59:00.000-06:00
map local traffic - MAPS Novus Pl is closed from S Packard Dr to E University Dr.
S Novus Pl is closed from S Packard Dr to E University Dr.
Start Time: 2024-05-07T01:00:00.000-06:00
End Time: 2024-05-15T00:59:59.000-06:00
map local traffic - MAPE Sky Harbor Blvd is closed at S 24th St.
E Sky Harbor Blvd is closed at S 24th St.
Start Time: 2024-05-06T23:04:36.000-06:00
End Time: 2024-05-14T00:59:00.000-06:00
map local traffic - MAPSR-143 NB has been restricted to one lane with a reduced width. See vehicle length/width restrictions. Oversize trucks must use alt route.
SR-143 NB has been restricted to one lane with a reduced width. See vehicle length/width restrictions. Oversize trucks must use alt route.
Start Time: 2024-04-30T01:00:00.000-06:00
End Time: 2024-05-08T00:59:00.000-06:00
map local traffic - MAPThe eastbound I-10 off-ramp at 32nd Street will be closed from 12 a.m. Saturday, March 30, to 4 a.m. Monday, June 3, for ramp construction.
The eastbound I-10 off-ramp at 32nd Street will be closed from 12 a.m. Saturday, March 30, to 4 a.m. Monday, June 3, for ramp construction.
Start Time: 2024-04-12T03:55:24.000-06:00
End Time: 2024-05-08T00:59:00.000-06:00
map local traffic - MAPContractor will use directional closures and flagman operations for slurry sealing roadway. 0830-1600
Contractor will use directional closures and flagman operations for slurry sealing roadway. 0830-1600
Start Time: 2024-05-07T01:00:00.000-06:00
End Time: 2024-05-12T09:30:00.000-06:00
map local traffic - MAPE Verde Ln is closed from E Thomas Rd / N 18th St to N 16th St.
E Verde Ln is closed from E Thomas Rd / N 18th St to N 16th St.
Start Time: 2024-05-06T07:48:58.000-06:00
End Time: 2024-05-09T00:59:00.000-06:00
map local traffic - MAPE Pierce St is closed from N 1st St to N Central Ave.
E Pierce St is closed from N 1st St to N Central Ave.
Start Time: 2024-05-06T05:18:16.000-06:00
End Time: 2024-05-09T00:59:00.000-06:00
map local traffic - MAPW Rancho Dr is closed from N 23rd Ave to N Black Canyon Hwy.
W Rancho Dr is closed from N 23rd Ave to N Black Canyon Hwy.
Start Time: 2024-05-06T03:28:18.000-06:00
End Time: 2024-05-09T00:59:00.000-06:00
map local traffic - MAPE Southern Ave is closed from Phoenix to S McClintock Dr.
E Southern Ave is closed from Phoenix to S McClintock Dr.
Start Time: 2024-05-05T19:14:54.000-06:00
End Time: 2024-05-08T00:59:00.000-06:00
map local traffic - MAPE Southern Ave is closed from S McClintock Dr to Phoenix.
E Southern Ave is closed from S McClintock Dr to Phoenix.
Start Time: 2024-05-05T19:14:54.000-06:00
End Time: 2024-05-08T00:59:00.000-06:00
map local traffic - MAPN Dobson Rd is closed from W Rio Salado Pkwy (Dobson Rd) to AZ-202/Red Mountain Fwy.
N Dobson Rd is closed from W Rio Salado Pkwy (Dobson Rd) to AZ-202/Red Mountain Fwy.
Start Time: 2024-05-05T08:54:00.000-06:00
End Time: 2024-05-09T00:59:00.000-06:00
map local traffic - MAPW Beardsley Rd is closed from N 59th Ave to N 51st Ave.
W Beardsley Rd is closed from N 59th Ave to N 51st Ave.
Start Time: 2024-04-26T08:05:00.000-06:00
End Time: 2024-05-08T00:59:00.000-06:00
map local traffic - MAPN 3rd St is closed from E Washington St (3rd St) to E Monroe St.
N 3rd St is closed from E Washington St (3rd St) to E Monroe St.
Start Time: 2024-04-22T12:05:00.000-06:00
End Time: 2024-05-09T00:59:00.000-06:00
map local traffic - MAPConstruction work on N Park Ave All at Dale Earnhardt Dr. All Lanes Closed. Starting 2024-03-11 2:53 PM and ending 2024-05-31 2:54 PM.
Construction work on N Park Ave All at Dale Earnhardt Dr. All Lanes Closed. Starting 2024-03-11 2:53 PM and ending 2024-05-31 2:54 PM.
Start Time: 2024-03-11T15:53:00.000-06:00
End Time: 2024-05-31T15:54:00.000-06:00
map local traffic - MAPRoadway closed on N Gilbert Rd Southbound from N Beeline Hwy - SR87 to E Quartz St . All Lanes Closed. 3/1/2023 12:00 AM to 7/31/2024 12:00 PM
Roadway closed on N Gilbert Rd Southbound from N Beeline Hwy - SR87 to E Quartz St . All Lanes Closed. 3/1/2023 12:00 AM to 7/31/2024 12:00 PM
Start Time: 2023-07-11T14:46:00.000-06:00
End Time: 2024-05-08T00:59:00.000-06:00
map local traffic - MAPEl Mirage Rd, FROM: El Mirage Rd, TO: El Mirage Rd - restrictions - Lane shifts due to road work. Slow down in work zones
El Mirage Rd, FROM: El Mirage Rd, TO: El Mirage Rd - restrictions - Lane shifts due to road work. Slow down in work zones
Start Time: 2024-05-06T09:30:00.000-06:00
End Time: 2024-05-09T17:00:00.000-06:00
map local traffic - MAPRoad widening on W Jomax Rd Eastbound from N Black Canyon Hwy to N 27th Ave . Left Lane Closed. 2/23/2024 12:00 AM to 7/11/2024 5:00 AM
Road widening on W Jomax Rd Eastbound from N Black Canyon Hwy to N 27th Ave . Left Lane Closed. 2/23/2024 12:00 AM to 7/11/2024 5:00 AM
Start Time: 2024-05-06T01:00:00.000-06:00
End Time: 2024-05-08T00:59:00.000-06:00
map local traffic - MAPConstruction work on W McDowell Rd Both from 113th Dr to N 119th Ave. Starting 2024-05-04 1:00 PM and ending 2024-05-17 1:00 PM.
Construction work on W McDowell Rd Both from 113th Dr to N 119th Ave. Starting 2024-05-04 1:00 PM and ending 2024-05-17 1:00 PM.
Start Time: 2024-05-04T14:00:00.000-06:00
End Time: 2024-05-17T14:00:00.000-06:00
map local traffic - MAPRoadwork on N Gilbert Rd from AZ-202/Red Mountain Fwy to AZ-87/N Beeline Hwy.
Roadwork on N Gilbert Rd from AZ-202/Red Mountain Fwy to AZ-87/N Beeline Hwy.
Start Time: 2024-05-04T07:21:00.000-06:00
End Time: 2024-05-07T06:15:40.030-06:00
map local traffic - MAPRoadwork on S Central Ave from Baseline Rd to Broadway Rd.
Roadwork on S Central Ave from Baseline Rd to Broadway Rd.
Start Time: 2024-04-24T10:14:30.000-06:00
End Time: 2024-05-07T06:15:40.030-06:00
map local traffic - MAPRoadwork on W Camelback Rd from N Sarival Rd to 152nd Ave.
Roadwork on W Camelback Rd from N Sarival Rd to 152nd Ave.
Start Time: 2024-04-24T07:43:30.000-06:00
End Time: 2024-05-07T06:15:40.030-06:00
map local traffic - MAPBASELINE RD - CARSON RD - Construction - Manhole placement LanesRestricted: NB=1 SB=1 BASELINE RD - CARSON RD
BASELINE RD - CARSON RD - Construction - Manhole placement LanesRestricted: NB=1 SB=1 BASELINE RD - CARSON RD
Start Time: 2024-04-11T08:00:00.000-06:00
End Time: 2024-05-14T05:00:00.000-06:00
map local traffic - MAPRoadwork on S 91st Ave from W Van Buren St (N 91st Ave) to AZ-85/W Buckeye Rd.
Roadwork on S 91st Ave from W Van Buren St (N 91st Ave) to AZ-85/W Buckeye Rd.
Start Time: 2024-04-10T06:07:00.000-06:00
End Time: 2024-07-11T00:55:00.000-06:00
map local traffic - MAPWater main work on N 51st Ave Southbound from W Behrend Dr to AZ-101-Loop E . 3 Left Lanes Closed. 4/8/2024 12:00 AM to 8/9/2024 5:00 AM
Water main work on N 51st Ave Southbound from W Behrend Dr to AZ-101-Loop E . 3 Left Lanes Closed. 4/8/2024 12:00 AM to 8/9/2024 5:00 AM
Start Time: 2024-04-09T01:00:00.000-06:00
End Time: 2024-05-08T00:59:00.000-06:00
map local traffic - MAPWater main work on W Beardsley Rd Westbound from N 51st Ave to N 51st Ave . Left Lane Closed. 4/8/2024 12:00 AM to 8/9/2024 5:00 AM
Water main work on W Beardsley Rd Westbound from N 51st Ave to N 51st Ave . Left Lane Closed. 4/8/2024 12:00 AM to 8/9/2024 5:00 AM
Start Time: 2024-04-09T01:00:00.000-06:00
End Time: 2024-05-08T00:59:00.000-06:00
map local traffic - MAPCENTRAL AVE - 1ST ST - Construction - Roadway & Sidewalk demo/grading LanesRestricted: EB =1, WB =1 CENTRAL AVE - 1ST ST
CENTRAL AVE - 1ST ST - Construction - Roadway & Sidewalk demo/grading LanesRestricted: EB =1, WB =1 CENTRAL AVE - 1ST ST
Start Time: 2024-04-01T09:30:00.000-06:00
End Time: 2024-05-30T05:00:00.000-06:00
map local traffic - MAP32ND ST - 40TH ST - Construction - Prelowers Mill and Overlay and Adjustments LanesRestricted: EB=1 WB=1 32ND ST - 40TH ST Comments: 32nd st and Camelback Rd
32ND ST - 40TH ST - Construction - Prelowers Mill and Overlay and Adjustments LanesRestricted: EB=1 WB=1 32ND ST - 40TH ST Comments: 32nd st and Camelback Rd
Start Time: 2024-03-16T09:30:00.000-06:00
End Time: 2024-06-29T05:00:00.000-06:00
map local traffic - MAPRoadwork on W Camelback Rd from N 179th Dr/N Citrus Rd to AZ-303/Estrella Fwy.
Roadwork on W Camelback Rd from N 179th Dr/N Citrus Rd to AZ-303/Estrella Fwy.
Start Time: 2024-02-21T13:08:30.000-07:00
End Time: 2024-05-07T06:15:40.030-06:00
map local traffic - MAPRoadwork on W Camelback Rd from AZ-303/Estrella Fwy to N Cotton Ln.
Roadwork on W Camelback Rd from AZ-303/Estrella Fwy to N Cotton Ln.
Start Time: 2024-02-21T06:07:30.000-07:00
End Time: 2024-05-07T06:15:40.030-06:00
map local traffic - MAPRoad widening on W Jomax Rd Westbound from N 27th Ave to N Black Canyon Hwy . Left Lane Closed. 2/23/2024 12:00 AM to 7/11/2024 5:00 AM
Road widening on W Jomax Rd Westbound from N 27th Ave to N Black Canyon Hwy . Left Lane Closed. 2/23/2024 12:00 AM to 7/11/2024 5:00 AM
Start Time: 2024-02-13T09:00:00.000-07:00
End Time: 2024-05-08T00:59:00.000-06:00
map local traffic - MAPFREMONT RD - BASELINE RD - Construction - Pothole / Trench / Bore LanesRestricted: ALL FREMONT RD - BASELINE RD
FREMONT RD - BASELINE RD - Construction - Pothole / Trench / Bore LanesRestricted: ALL FREMONT RD - BASELINE RD
Start Time: 2024-01-15T08:30:00.000-07:00
End Time: 2024-05-15T05:00:00.000-06:00
map local traffic - MAPLINCOLN ST - MADISON ST - Construction - Finishing Utilities & Roadway LanesRestricted: NB=1 LINCOLN ST - MADISON ST
LINCOLN ST - MADISON ST - Construction - Finishing Utilities & Roadway LanesRestricted: NB=1 LINCOLN ST - MADISON ST
Start Time: 2024-01-15T07:00:00.000-07:00
End Time: 2024-06-01T05:00:00.000-06:00
map local traffic - MAPRoadwork on S Central Ave from Broadway Rd to Baseline Rd.
Roadwork on S Central Ave from Broadway Rd to Baseline Rd.
Start Time: 2024-01-10T12:00:00.000-07:00
End Time: 2024-05-07T06:15:40.030-06:00
map local traffic - MAPLong term road construction on W Elliot Rd Both from N Ski Ct to N Summerfield Dr. Starting 2023-11-16 3:13 PM.
Long term road construction on W Elliot Rd Both from N Ski Ct to N Summerfield Dr. Starting 2023-11-16 3:13 PM.
Start Time: 2023-11-16T15:13:00.000-07:00
End Time: 2024-05-07T06:15:40.030-06:00
map local traffic - MAPLong term road construction on W Elliot Rd Both from N Ski Ct to N Summerfield Dr. Starting 2023-11-16 3:13 PM.
Long term road construction on W Elliot Rd Both from N Ski Ct to N Summerfield Dr. Starting 2023-11-16 3:13 PM.
Start Time: 2023-11-16T15:13:00.000-07:00
End Time: 2024-05-07T06:15:40.030-06:00
map local traffic - MAPLong term road construction on S Cooper Rd Both from W Smoke Tree Rd to N Cooper Rd. Starting 2023-11-16 3:10 PM.
Long term road construction on S Cooper Rd Both from W Smoke Tree Rd to N Cooper Rd. Starting 2023-11-16 3:10 PM.
Start Time: 2023-11-16T15:10:00.000-07:00
End Time: 2024-05-07T06:15:40.030-06:00
map local traffic - MAPContractor will use a westbound directional closure on Glenn west of 59av, they will close the southbound left turn lane on 59av at Glenn and close the parking on Glenn 58dr-58av and on 58av from Glenn - Myrtle from 9pm-5am
Contractor will use a westbound directional closure on Glenn west of 59av, they will close the southbound left turn lane on 59av at Glenn and close the parking on Glenn 58dr-58av and on 58av from Glenn - Myrtle from 9pm-5am
Start Time: 2024-04-30T01:00:00.000-06:00
End Time: 2024-05-11T22:00:00.000-06:00
map local traffic - MAPContractor will shift traffic around work area and use directional closures on 55av Bethany Hm - Claremont for slurry sealing
Contractor will shift traffic around work area and use directional closures on 55av Bethany Hm - Claremont for slurry sealing
Start Time: 2024-04-30T01:00:00.000-06:00
End Time: 2024-05-07T09:30:00.000-06:00
map local traffic - MAPContractor will close the shoulder and alley on 65av north of Glendale Ave. 0830-1600
Contractor will close the shoulder and alley on 65av north of Glendale Ave. 0830-1600
Start Time: 2024-04-26T01:00:00.000-06:00
End Time: 2024-05-18T09:30:00.000-06:00
map local traffic - MAPContractor will close southbound 53av at Myrtle 0830-1600
Contractor will close southbound 53av at Myrtle 0830-1600
Start Time: 2024-04-25T01:00:00.000-06:00
End Time: 2024-05-10T09:30:00.000-06:00
map local traffic - MAPContractor will shift traffic around work area on weekends on 47av at Frier and on Frier and 49av during the week 0900-1400.
Contractor will shift traffic around work area on weekends on 47av at Frier and on Frier and 49av during the week 0900-1400.
Start Time: 2024-04-25T01:00:00.000-06:00
End Time: 2024-05-18T01:00:00.000-06:00
map local traffic - MAPROESER RD - ROMLEY RD - Construction - Asphalt Repair LanesRestricted: SB ALL ROESER RD - ROMLEY RD Comments: 10TH ST AND ROESER RD
ROESER RD - ROMLEY RD - Construction - Asphalt Repair LanesRestricted: SB ALL ROESER RD - ROMLEY RD Comments: 10TH ST AND ROESER RD
Start Time: 2024-04-22T07:00:00.000-06:00
End Time: 2024-05-10T02:00:00.000-06:00
map local traffic - MAPVAN BUREN ST - POLK ST - Construction - Installing a line stop approx. 300 feet north of Van Buren on 24th street LanesRestricted: NB=2;SB=ALL; EB ALL;WB ALL VAN BUREN ST - POLK ST
VAN BUREN ST - POLK ST - Construction - Installing a line stop approx. 300 feet north of Van Buren on 24th street LanesRestricted: NB=2;SB=ALL; EB ALL;WB ALL VAN BUREN ST - POLK ST
Start Time: 2024-04-22T01:00:00.000-06:00
End Time: 2024-05-22T01:00:00.000-06:00
map local traffic - MAPJESSE OWENS PKWY - BASELINE RD - Construction - Demo/Grade LanesRestricted: NB =1, SB =1 JESSE OWENS PKWY - BASELINE RD
JESSE OWENS PKWY - BASELINE RD - Construction - Demo/Grade LanesRestricted: NB =1, SB =1 JESSE OWENS PKWY - BASELINE RD
Start Time: 2024-04-17T07:00:00.000-06:00
End Time: 2024-05-17T05:00:00.000-06:00
map local traffic - MAPWILLIAMS DR - Construction - concrete LanesRestricted: NB NONE SB NONE EB NONE WB NONE WILLIAMS DR at 15TH AVE Comments: WILLIAMS DR & 15TH AVE
WILLIAMS DR - Construction - concrete LanesRestricted: NB NONE SB NONE EB NONE WB NONE WILLIAMS DR at 15TH AVE Comments: WILLIAMS DR & 15TH AVE
Start Time: 2024-04-15T06:00:00.000-06:00
End Time: 2024-05-15T06:00:00.000-06:00
map local traffic - MAP19TH AVE - 7TH AVE - Construction - PMRE Fog Seal LanesRestricted: EB=1 WB=1 19TH AVE - 7TH AVE
19TH AVE - 7TH AVE - Construction - PMRE Fog Seal LanesRestricted: EB=1 WB=1 19TH AVE - 7TH AVE
Start Time: 2024-04-10T09:30:00.000-06:00
End Time: 2024-05-10T05:00:00.000-06:00
map local traffic - MAPNB right lane WB shift
NB right lane WB shift
Start Time: 2024-04-08T01:00:00.000-06:00
End Time: 2024-06-01T01:00:00.000-06:00
map local traffic - MAPEVA ST - VOGEL AVE - Construction - Water Pipeline Inspection LanesRestricted: NB =2, SB ALL EVA ST - VOGEL AVE Comments: 35TH AVE & VOGEL AVE
EVA ST - VOGEL AVE - Construction - Water Pipeline Inspection LanesRestricted: NB =2, SB ALL EVA ST - VOGEL AVE Comments: 35TH AVE & VOGEL AVE
Start Time: 2024-03-14T09:30:00.000-06:00
End Time: 2024-05-24T05:00:00.000-06:00
map local traffic - MAP53RD AVE - 51ST AVE - Construction - Hawk installation, Concrete, Asphalt, Electrical traffic light crossing LanesRestricted: EB =1, WB =1 53RD AVE - 51ST AVE Comments: CAMELBACK RD & 53RD AVE; FROM 53RD AVE TO 52ND AVE
53RD AVE - 51ST AVE - Construction - Hawk installation, Concrete, Asphalt, Electrical traffic light crossing LanesRestricted: EB =1, WB =1 53RD AVE - 51ST AVE Comments: CAMELBACK RD & 53RD AVE; FROM 53RD AVE TO 52ND AVE
Start Time: 2024-02-19T08:30:00.000-07:00
End Time: 2024-06-21T05:00:00.000-06:00
map local traffic - MAPVINEYARD RD - BASELINE RD - Construction - Trenching, Potholing, Asphalt and concrete LanesRestricted: NB=1 SB=1 VINEYARD RD - BASELINE RD
VINEYARD RD - BASELINE RD - Construction - Trenching, Potholing, Asphalt and concrete LanesRestricted: NB=1 SB=1 VINEYARD RD - BASELINE RD
Start Time: 2024-02-05T07:00:00.000-07:00
End Time: 2024-05-22T05:00:00.000-06:00
map local traffic - MAPBUCHANAN ST - GRANT ST - Construction - Track / OCS Wire Runs LanesRestricted: NB=1 BUCHANAN ST - GRANT ST
BUCHANAN ST - GRANT ST - Construction - Track / OCS Wire Runs LanesRestricted: NB=1 BUCHANAN ST - GRANT ST
Start Time: 2024-01-15T06:00:00.000-07:00
End Time: 2024-06-01T05:00:00.000-06:00
map local traffic - MAPCENTRAL AVE - 1ST AVE - Construction - Flash-Butt Welding LanesRestricted: EB ALL; WB ALL CENTRAL AVE - 1ST AVE
CENTRAL AVE - 1ST AVE - Construction - Flash-Butt Welding LanesRestricted: EB ALL; WB ALL CENTRAL AVE - 1ST AVE
Start Time: 2024-01-15T05:00:00.000-07:00
End Time: 2024-06-01T06:00:00.000-06:00
map local traffic - MAPCENTRAL AVE - 3RD ST - Construction - Flash-Butt Welding LanesRestricted: EB ALL; WB ALL CENTRAL AVE - 3RD ST
CENTRAL AVE - 3RD ST - Construction - Flash-Butt Welding LanesRestricted: EB ALL; WB ALL CENTRAL AVE - 3RD ST
Start Time: 2024-01-15T05:00:00.000-07:00
End Time: 2024-06-01T06:00:00.000-06:00
map local traffic - MAPROOSEVELT ST - MORELAND ST - Construction - 13th Street Improvements LanesRestricted: SB=0, NB=1 ROOSEVELT ST - MORELAND ST Comments: 13th St & Roosevelt St.- PREV TRAC permit C-23-012075
ROOSEVELT ST - MORELAND ST - Construction - 13th Street Improvements LanesRestricted: SB=0, NB=1 ROOSEVELT ST - MORELAND ST Comments: 13th St & Roosevelt St.- PREV TRAC permit C-23-012075
Start Time: 2024-01-15T00:00:00.000-07:00
End Time: 2024-05-15T01:00:00.000-06:00
map local traffic - MAPGilbert Rd, FROM: Thomas Rd, TO: SR 87 - road construction - CLOSED: Gilbert Rd Northbound & Southbound between Thomas Rd and SR 87 (Beeline Hwy) due to bridge work. Please avoid the area.
Gilbert Rd, FROM: Thomas Rd, TO: SR 87 - road construction - CLOSED: Gilbert Rd Northbound & Southbound between Thomas Rd and SR 87 (Beeline Hwy) due to bridge work. Please avoid the area.
Start Time: 2023-03-14T18:50:00.000-06:00
End Time: 2024-07-31T13:00:00.000-06:00
map local traffic - MAPGilbert Rd, FROM: Thomas Rd, TO: SR 87 - road construction - CLOSED: Gilbert Rd Northbound & Southbound between Thomas Rd and SR 87 (Beeline Hwy) due to bridge work. Please avoid the area.
Gilbert Rd, FROM: Thomas Rd, TO: SR 87 - road construction - CLOSED: Gilbert Rd Northbound & Southbound between Thomas Rd and SR 87 (Beeline Hwy) due to bridge work. Please avoid the area.
Start Time: 2023-03-14T18:50:00.000-06:00
End Time: 2024-07-31T13:00:00.000-06:00
map local traffic