    W Erie St is closed from N Chippewa Pl to N Alma School Rd.
    W Erie St is closed from N Chippewa Pl to N Alma School Rd.
    Start Time: 2025-05-27T09:20:30.000-06:00
    End Time: 2025-06-16T05:58:01.578-06:00
    maplocal traffic
  • MAP
    Alma School Rd - road construction - Channels & Hard Closures
    Alma School Rd - road construction - Channels & Hard Closures
    Start Time: 2025-06-09T17:57:00.000-06:00
    End Time: 2025-06-21T18:00:00.000-06:00
    maplocal traffic
  • MAP
    DOBSON RD - road construction - OPEN CUT - WEEKEND WORK
    DOBSON RD - road construction - OPEN CUT - WEEKEND WORK
    Start Time: 2025-06-11T18:02:30.000-06:00
    End Time: 2025-07-13T18:00:00.000-06:00
    maplocal traffic
  • MAP
    34TH ST - road construction - AS
    34TH ST - road construction - AS
    Start Time: 2025-06-09T01:00:00.000-06:00
    End Time: 2025-06-20T01:00:00.000-06:00
    maplocal traffic
  • MAP
    IVANHOE ST - road construction - ASPHALT RESTORATION ON ALLEY
    IVANHOE ST - road construction - ASPHALT RESTORATION ON ALLEY
    Start Time: 2025-06-08T18:00:00.000-06:00
    End Time: 2025-06-19T18:00:00.000-06:00
    maplocal traffic
  • MAP
    Warner Rd - road construction - RESTO
    Warner Rd - road construction - RESTO
    Start Time: 2025-06-04T18:00:00.000-06:00
    End Time: 2025-06-16T18:00:00.000-06:00
    maplocal traffic
  • MAP
    LIBERTY LN - road construction - MISCELLANEOUS CIVIL WORK
    LIBERTY LN - road construction - MISCELLANEOUS CIVIL WORK
    Start Time: 2025-05-31T13:12:00.000-06:00
    End Time: 2025-06-27T01:00:00.000-06:00
    maplocal traffic
  • MAP
    Ellis - road construction - Fiber pulling, resto
    Ellis - road construction - Fiber pulling, resto
    Start Time: 2025-05-30T08:57:00.000-06:00
    End Time: 2025-06-26T18:00:00.000-06:00
    maplocal traffic
  • MAP
    Inovation - road construction - Fiber pulling, resto
    Inovation - road construction - Fiber pulling, resto
    Start Time: 2025-05-30T08:57:00.000-06:00
    End Time: 2025-06-26T18:00:00.000-06:00
    maplocal traffic
  • MAP
    close eb wb left lanes
    close eb wb left lanes
    Start Time: 2025-06-16T03:53:30.000-06:00
    End Time: 2025-06-28T01:00:00.000-06:00
    maplocal traffic
  • MAP
    Roadwork on N 67th Ave from W Happy Valley Rd to W Deer Valley Rd.
    Roadwork on N 67th Ave from W Happy Valley Rd to W Deer Valley Rd.
    Start Time: 2025-06-16T03:10:30.000-06:00
    End Time: 2025-06-16T05:57:48.739-06:00
    maplocal traffic
  • MAP
    40TH ST - road construction - ADA RAMP INSTALL
    40TH ST - road construction - ADA RAMP INSTALL
    Start Time: 2025-06-16T03:10:30.000-06:00
    End Time: 2025-06-23T17:00:00.000-06:00
    maplocal traffic
  • MAP
    shift traffic to south
    shift traffic to south
    Start Time: 2025-06-16T01:45:00.000-06:00
    End Time: 2025-07-05T01:00:00.000-06:00
    maplocal traffic
  • MAP
    shift traffic to the west
    shift traffic to the west
    Start Time: 2025-06-16T01:29:00.000-06:00
    End Time: 2025-06-28T01:00:00.000-06:00
    maplocal traffic
  • MAP
    Right lane closed on S Rural Rd Southbound from E Hermosa Dr to E Minton Dr 5/12/2025 12:00 AM to 7/1/2025 12:00 AM
    Right lane closed on S Rural Rd Southbound from E Hermosa Dr to E Minton Dr 5/12/2025 12:00 AM to 7/1/2025 12:00 AM
    Start Time: 2025-06-16T01:10:00.000-06:00
    End Time: 2025-06-17T00:59:00.000-06:00
    maplocal traffic
  • MAP
    Exit ramp closed on ramp from 101-LOOP Westbound to W Beardsley Rd 5/20/2025 12:00 AM to 7/20/2025 5:00 AM
    Exit ramp closed on ramp from 101-LOOP Westbound to W Beardsley Rd 5/20/2025 12:00 AM to 7/20/2025 5:00 AM
    Start Time: 2025-05-20T08:15:00.000-06:00
    End Time: 2025-06-17T00:59:00.000-06:00
    maplocal traffic
  • MAP
    On ramp closed on ramp from W Beardsley Rd to 101-LOOP Eastbound 5/20/2025 12:00 AM to 7/20/2025 5:00 AM
    On ramp closed on ramp from W Beardsley Rd to 101-LOOP Eastbound 5/20/2025 12:00 AM to 7/20/2025 5:00 AM
    Start Time: 2025-05-20T01:21:30.000-06:00
    End Time: 2025-06-17T00:59:00.000-06:00
    maplocal traffic
  • MAP
    On ramp closed on ramp from W Beardsley Rd to 101-LOOP Westbound 5/13/2025 12:00 AM to 7/12/2025 5:00 AM
    On ramp closed on ramp from W Beardsley Rd to 101-LOOP Westbound 5/13/2025 12:00 AM to 7/12/2025 5:00 AM
    Start Time: 2025-05-13T07:01:00.000-06:00
    End Time: 2025-06-17T00:59:00.000-06:00
    maplocal traffic
  • MAP
    Roadwork on N Cave Creek Rd from Dynamite Blvd to Pinnacle Peak Rd.
    Roadwork on N Cave Creek Rd from Dynamite Blvd to Pinnacle Peak Rd.
    Start Time: 2025-06-16T01:10:00.000-06:00
    End Time: 2025-06-16T05:57:48.739-06:00
    maplocal traffic
  • MAP
    MADISON ST - road construction - sewer work
    MADISON ST - road construction - sewer work
    Start Time: 2025-06-16T01:00:00.000-06:00
    End Time: 2025-07-01T01:00:00.000-06:00
    maplocal traffic
  • MAP
    ELLIOT RD - road construction - GM
    ELLIOT RD - road construction - GM
    Start Time: 2025-06-16T01:00:00.000-06:00
    End Time: 2025-06-28T01:00:00.000-06:00
    maplocal traffic
  • MAP
    ROOSEVELT ST - road construction - AB
    ROOSEVELT ST - road construction - AB
    Start Time: 2025-06-16T01:00:00.000-06:00
    End Time: 2025-06-30T01:00:00.000-06:00
    maplocal traffic
  • MAP
    MADISON ST - road construction - NS
    MADISON ST - road construction - NS
    Start Time: 2025-06-16T01:00:00.000-06:00
    End Time: 2025-06-30T01:00:00.000-06:00
    maplocal traffic
  • MAP
    16TH ST - road construction - MH, DE, SE
    16TH ST - road construction - MH, DE, SE
    Start Time: 2025-06-16T01:00:00.000-06:00
    End Time: 2025-06-18T01:00:00.000-06:00
    maplocal traffic
  • MAP
    2ND ST - road construction - NS
    2ND ST - road construction - NS
    Start Time: 2025-06-16T01:00:00.000-06:00
    End Time: 2025-06-30T01:00:00.000-06:00
    maplocal traffic
  • MAP
    44TH ST - road construction - SE
    44TH ST - road construction - SE
    Start Time: 2025-06-16T01:00:00.000-06:00
    End Time: 2025-06-30T01:00:00.000-06:00
    maplocal traffic
  • MAP
    47TH DR - road construction - CP
    47TH DR - road construction - CP
    Start Time: 2025-06-16T01:00:00.000-06:00
    End Time: 2025-06-20T01:00:00.000-06:00
    maplocal traffic
  • MAP
    WASHINGTON ST - road construction - SE
    WASHINGTON ST - road construction - SE
    Start Time: 2025-06-15T23:10:00.000-06:00
    End Time: 2025-07-01T01:00:00.000-06:00
    maplocal traffic
  • MAP
    W Madison St is closed from S 7th Ave to S 9th Ave.
    W Madison St is closed from S 7th Ave to S 9th Ave.
    Start Time: 2025-06-11T15:34:30.000-06:00
    End Time: 2025-06-16T05:57:48.739-06:00
    maplocal traffic
  • MAP
    various traffic control
    various traffic control
    Start Time: 2025-06-11T15:18:00.000-06:00
    End Time: 2025-06-26T01:00:00.000-06:00
    maplocal traffic
  • MAP
    various traffic control
    various traffic control
    Start Time: 2025-06-11T14:57:30.000-06:00
    End Time: 2025-07-11T01:00:00.000-06:00
    maplocal traffic
  • MAP
    shift traffic
    shift traffic
    Start Time: 2025-06-11T01:00:00.000-06:00
    End Time: 2025-06-19T01:00:00.000-06:00
    maplocal traffic
  • MAP
    various
    various
    Start Time: 2025-06-10T01:00:00.000-06:00
    End Time: 2025-07-05T01:00:00.000-06:00
    maplocal traffic
  • MAP
    Close SB
    Close SB
    Start Time: 2025-06-09T11:51:00.000-06:00
    End Time: 2025-07-13T01:00:00.000-06:00
    maplocal traffic
  • MAP
    various traffic control
    various traffic control
    Start Time: 2025-06-04T09:41:00.000-06:00
    End Time: 2025-08-01T01:00:00.000-06:00
    maplocal traffic
  • MAP
    various traffic control
    various traffic control
    Start Time: 2025-06-03T12:26:00.000-06:00
    End Time: 2025-06-21T01:00:00.000-06:00
    maplocal traffic
  • MAP
    N Cotton Ln is closed from W Waddell Rd to W Peoria Ave.
    N Cotton Ln is closed from W Waddell Rd to W Peoria Ave.
    Start Time: 2025-05-27T07:58:30.000-06:00
    End Time: 2025-06-16T05:57:48.739-06:00
    maplocal traffic
  • MAP
    Olive Ave - road construction - Road work, road closed. Use detour route
    Olive Ave - road construction - Road work, road closed. Use detour route
    Start Time: 2025-05-19T01:04:30.000-06:00
    End Time: 2025-06-20T01:00:00.000-06:00
    maplocal traffic
  • MAP
    Shift traffic to the east
    Shift traffic to the east
    Start Time: 2025-05-19T01:00:00.000-06:00
    End Time: 2025-06-28T01:00:00.000-06:00
    maplocal traffic
  • MAP
    W Myrtle Ave is closed from N 59th Ave to N 58th Ave.
    W Myrtle Ave is closed from N 59th Ave to N 58th Ave.
    Start Time: 2025-05-13T15:54:30.000-06:00
    End Time: 2025-06-28T01:00:00.000-06:00
    maplocal traffic
  • MAP
    flagger station
    flagger station
    Start Time: 2025-05-12T01:00:00.000-06:00
    End Time: 2025-07-05T01:00:00.000-06:00
    maplocal traffic
  • MAP
    McKellips Rd - road construction - Road work, road closed. Follow detour route
    McKellips Rd - road construction - Road work, road closed. Follow detour route
    Start Time: 2025-03-24T04:09:45.000-06:00
    End Time: 2025-07-07T06:00:00.000-06:00
    maplocal traffic
  • MAP
    S 99th Ave is closed from W Lower Buckeye Rd to AZ-85/W Buckeye Rd.
    S 99th Ave is closed from W Lower Buckeye Rd to AZ-85/W Buckeye Rd.
    Start Time: 2025-03-11T07:53:00.000-06:00
    End Time: 2025-06-16T05:57:48.739-06:00
    maplocal traffic
  • MAP
    Roadwork on N Cave Creek Rd from Dynamite Blvd to Pinnacle Peak Rd.
    Roadwork on N Cave Creek Rd from Dynamite Blvd to Pinnacle Peak Rd.
    Start Time: 2025-06-15T10:17:30.000-06:00
    End Time: 2025-06-16T05:57:48.739-06:00
    maplocal traffic
  • MAP
    3RD AVE - road construction - R&R ASPHALT
    3RD AVE - road construction - R&R ASPHALT
    Start Time: 2025-06-14T11:06:30.000-06:00
    End Time: 2025-06-27T16:30:00.000-06:00
    maplocal traffic
  • MAP
    POLK ST - road construction - Storm Drain Installation
    POLK ST - road construction - Storm Drain Installation
    Start Time: 2025-06-14T09:30:00.000-06:00
    End Time: 2025-06-28T17:00:00.000-06:00
    maplocal traffic
  • MAP
    BELL RD - road construction - Sewer Rehabilitation MH 45 EAST
    BELL RD - road construction - Sewer Rehabilitation MH 45 EAST
    Start Time: 2025-06-14T09:30:00.000-06:00
    End Time: 2025-06-28T17:00:00.000-06:00
    maplocal traffic
  • MAP
    BUCKEYE RD - road construction - SE
    BUCKEYE RD - road construction - SE
    Start Time: 2025-06-12T01:00:00.000-06:00
    End Time: 2025-06-27T01:00:00.000-06:00
    maplocal traffic
  • MAP
    GREENWAY RD - road construction - Micro Seal / Edge Millings
    GREENWAY RD - road construction - Micro Seal / Edge Millings
    Start Time: 2025-06-11T08:02:00.000-06:00
    End Time: 2025-06-27T17:00:00.000-06:00
    maplocal traffic
  • MAP
    32ND ST - road construction - UG, EM
    32ND ST - road construction - UG, EM
    Start Time: 2025-06-11T01:00:00.000-06:00
    End Time: 2025-06-18T01:00:00.000-06:00
    maplocal traffic
  • MAP
    Roadwork on W Indian School Rd from AZ-303/Estrella Fwy to N Citrus Rd (Indian School Rd).
    Roadwork on W Indian School Rd from AZ-303/Estrella Fwy to N Citrus Rd (Indian School Rd).
    Start Time: 2025-06-09T20:55:30.000-06:00
    End Time: 2025-06-16T05:57:48.739-06:00
    maplocal traffic
  • MAP
    BASELINE RD - road construction - GM
    BASELINE RD - road construction - GM
    Start Time: 2025-06-09T01:00:00.000-06:00
    End Time: 2025-06-28T01:00:00.000-06:00
    maplocal traffic
  • MAP
    Roadwork on S Cotton Ln from S Estrella Pkwy (Cotton Ln) to AZ-85.
    Roadwork on S Cotton Ln from S Estrella Pkwy (Cotton Ln) to AZ-85.
    Start Time: 2025-06-06T16:47:30.000-06:00
    End Time: 2025-06-16T05:57:48.739-06:00
    maplocal traffic
  • MAP
    PINNACLE PEAK RD - road construction - offsite improvements
    PINNACLE PEAK RD - road construction - offsite improvements
    Start Time: 2025-06-06T01:00:00.000-06:00
    End Time: 2025-06-20T01:00:00.000-06:00
    maplocal traffic
  • MAP
    Roadwork on N 67th Ave from W Deer Valley Rd to W Happy Valley Rd.
    Roadwork on N 67th Ave from W Deer Valley Rd to W Happy Valley Rd.
    Start Time: 2025-06-04T16:33:00.000-06:00
    End Time: 2025-06-16T05:57:48.739-06:00
    maplocal traffic
  • MAP
    7TH AVE - road construction - UG, PC, DIG, PD
    7TH AVE - road construction - UG, PC, DIG, PD
    Start Time: 2025-06-03T14:03:00.000-06:00
    End Time: 2025-06-23T01:00:00.000-06:00
    maplocal traffic
  • MAP
    BROADWAY RD - road construction - PAVING
    BROADWAY RD - road construction - PAVING
    Start Time: 2025-06-02T01:00:00.000-06:00
    End Time: 2025-07-01T01:00:00.000-06:00
    maplocal traffic
  • MAP
    99th Ave - road construction - Road work, northbound right lane closed. Slow down in work zones
    99th Ave - road construction - Road work, northbound right lane closed. Slow down in work zones
    Start Time: 2025-05-30T08:57:00.000-06:00
    End Time: 2025-06-30T17:00:00.000-06:00
    maplocal traffic
  • MAP
    E DOUBLETREE RANCH RD / N GAINEY CENTER DR - road construction - EB Doubletree Ranch Rd. median lane, left turn lane restricted at Gainey Center Dr. to Gainey Ranch Rd.; WB Doubletree Ranch Rd. thru traffic shifted to the EB Doubletree Ranch Rd. median lane at Gainey; Ranch Rd. to Gainey Center Dr.; TCP#2: EB Doubletree Ranch Rd. thru traffic shifted to the WB Doubletree Ranch Rd median lane at Gainey; Center Dr.; WB Doubletree Ranch Rd. median lane, left turn lane restricted at Gainey Ranch Rd. to Gainey Center Dr.
    E DOUBLETREE RANCH RD / N GAINEY CENTER DR - road construction - EB Doubletree Ranch Rd. median lane, left turn lane restricted at Gainey Center Dr. to Gainey Ranch Rd.; WB Doubletree Ranch Rd. thru traffic shifted to the EB Doubletree Ranch Rd. median lane at Gainey; Ranch Rd. to Gainey Center Dr.; TCP#2: EB Doubletree Ranch Rd. thru traffic shifted to the WB Doubletree Ranch Rd median lane at Gainey; Center Dr.; WB Doubletree Ranch Rd. median lane, left turn lane restricted at Gainey Ranch Rd. to Gainey Center Dr.
    Start Time: 2025-05-29T17:08:00.000-06:00
    End Time: 2025-10-24T01:00:00.000-06:00
    maplocal traffic
  • MAP
    THOMAS RD - road construction - Installation of new traffic signal foundations/poles/conduit
    THOMAS RD - road construction - Installation of new traffic signal foundations/poles/conduit
    Start Time: 2025-05-23T16:04:00.000-06:00
    End Time: 2025-06-30T17:00:00.000-06:00
    maplocal traffic
  • MAP
    E THOMAS RD / N PIMA RD - road construction - NB Pima Rd thru lane, shoulder restricted through Thomas Rd.; WB Thomas Rd right turn lane, shoulder restricted at Pima Rd.; SB Pima Rd right turn lane, shoulder restricted at Thomas Rd onto Westbound Merge Lane.
    E THOMAS RD / N PIMA RD - road construction - NB Pima Rd thru lane, shoulder restricted through Thomas Rd.; WB Thomas Rd right turn lane, shoulder restricted at Pima Rd.; SB Pima Rd right turn lane, shoulder restricted at Thomas Rd onto Westbound Merge Lane.
    Start Time: 2025-05-05T18:52:00.000-06:00
    End Time: 2025-07-31T17:00:00.000-06:00
    maplocal traffic
  • MAP
    MC 85 - road construction - Road work, left lane closed. Slow down in work zones
    MC 85 - road construction - Road work, left lane closed. Slow down in work zones
    Start Time: 2025-04-21T10:36:00.000-06:00
    End Time: 2025-07-29T13:00:00.000-06:00
    maplocal traffic
  • MAP
    Roadwork on S Central Ave from Baseline Rd to Broadway Rd.
    Roadwork on S Central Ave from Baseline Rd to Broadway Rd.
    Start Time: 2025-03-30T20:23:30.000-06:00
    End Time: 2025-06-16T05:57:48.739-06:00
    maplocal traffic
  • MAP
    Roadwork on S Central Ave from Broadway Rd to Baseline Rd.
    Roadwork on S Central Ave from Broadway Rd to Baseline Rd.
    Start Time: 2025-03-29T15:08:30.000-06:00
    End Time: 2025-06-16T05:57:48.739-06:00
    maplocal traffic
  • MAP
    SONORAN DESERT DR - road construction - Concrete & Paving
    SONORAN DESERT DR - road construction - Concrete & Paving
    Start Time: 2025-06-13T16:04:00.000-06:00
    End Time: 2025-07-01T01:00:00.000-06:00
    maplocal traffic
  • MAP
    WILLIAMS DR - road construction - Concrete/Paving
    WILLIAMS DR - road construction - Concrete/Paving
    Start Time: 2025-06-13T14:02:30.000-06:00
    End Time: 2025-06-28T01:00:00.000-06:00
    maplocal traffic
  • MAP
    GREENWAY RD - road construction - SE
    GREENWAY RD - road construction - SE
    Start Time: 2025-06-13T14:02:30.000-06:00
    End Time: 2025-07-03T01:00:00.000-06:00
    maplocal traffic
  • MAP
    30TH DR - road construction - Concrete/Paving
    30TH DR - road construction - Concrete/Paving
    Start Time: 2025-06-13T14:02:30.000-06:00
    End Time: 2025-06-28T01:00:00.000-06:00
    maplocal traffic
  • MAP
    44TH ST - road construction - Asphalt/Concrete Restoration
    44TH ST - road construction - Asphalt/Concrete Restoration
    Start Time: 2025-06-13T09:30:00.000-06:00
    End Time: 2025-06-27T17:00:00.000-06:00
    maplocal traffic
  • MAP
    35TH AVE - road construction - PAVING
    35TH AVE - road construction - PAVING
    Start Time: 2025-06-13T09:30:00.000-06:00
    End Time: 2025-06-27T17:00:00.000-06:00
    maplocal traffic
  • MAP
    25TH ST - road construction - SIDEWALK WORK /DRIVEWAY
    25TH ST - road construction - SIDEWALK WORK /DRIVEWAY
    Start Time: 2025-06-13T01:00:00.000-06:00
    End Time: 2025-06-27T01:00:00.000-06:00
    maplocal traffic
  • MAP
    35TH AVE - road construction - Concrete Panel
    35TH AVE - road construction - Concrete Panel
    Start Time: 2025-06-12T09:30:00.000-06:00
    End Time: 2025-06-20T17:00:00.000-06:00
    maplocal traffic
  • MAP
    ARCADIA DR - road construction - Installing Speed Cushions
    ARCADIA DR - road construction - Installing Speed Cushions
    Start Time: 2025-06-12T09:30:00.000-06:00
    End Time: 2025-07-12T17:00:00.000-06:00
    maplocal traffic
  • MAP
    48TH ST - road construction - Replace Water Service Line
    48TH ST - road construction - Replace Water Service Line
    Start Time: 2025-06-12T09:30:00.000-06:00
    End Time: 2025-06-20T17:30:00.000-06:00
    maplocal traffic
  • MAP
    ARCADIA DR - road construction - Installing Speed Cushions
    ARCADIA DR - road construction - Installing Speed Cushions
    Start Time: 2025-06-12T09:30:00.000-06:00
    End Time: 2025-07-12T17:00:00.000-06:00
    maplocal traffic
  • MAP
    MARSHALL AVE - road construction - MANHOLE REHAB (20-22-125)
    MARSHALL AVE - road construction - MANHOLE REHAB (20-22-125)
    Start Time: 2025-06-12T08:00:00.000-06:00
    End Time: 2025-06-19T16:00:00.000-06:00
    maplocal traffic
  • MAP
    Williams Rd - road construction - Road work, flagging operations, be prepared to stop
    Williams Rd - road construction - Road work, flagging operations, be prepared to stop
    Start Time: 2025-06-12T07:00:00.000-06:00
    End Time: 2025-06-24T19:00:00.000-06:00
    maplocal traffic
  • MAP
    APACHE ST - road construction - Sign Placement
    APACHE ST - road construction - Sign Placement
    Start Time: 2025-06-12T07:00:00.000-06:00
    End Time: 2025-06-23T17:00:00.000-06:00
    maplocal traffic
  • MAP
    10TH ST - road construction - SE
    10TH ST - road construction - SE
    Start Time: 2025-06-12T01:00:00.000-06:00
    End Time: 2025-06-20T01:00:00.000-06:00
    maplocal traffic
  • MAP
    87TH AVE - road construction - SC
    87TH AVE - road construction - SC
    Start Time: 2025-06-12T01:00:00.000-06:00
    End Time: 2025-06-26T01:00:00.000-06:00
    maplocal traffic
  • MAP
    SOUTH MOUNTAIN AVE - road construction - Asphalt/Concrete Restoration
    SOUTH MOUNTAIN AVE - road construction - Asphalt/Concrete Restoration
    Start Time: 2025-06-11T09:30:00.000-06:00
    End Time: 2025-06-27T17:00:00.000-06:00
    maplocal traffic
  • MAP
    WINDSOR AVE - road construction - Install speed hump
    WINDSOR AVE - road construction - Install speed hump
    Start Time: 2025-06-11T09:30:00.000-06:00
    End Time: 2025-06-17T17:00:00.000-06:00
    maplocal traffic
  • MAP
    WAHALLA LN - road construction - COOL SEAL
    WAHALLA LN - road construction - COOL SEAL
    Start Time: 2025-06-10T16:03:30.000-06:00
    End Time: 2025-06-21T17:00:00.000-06:00
    maplocal traffic
  • MAP
    MULBERRY ST - road construction - BO/TR/AS/CC
    MULBERRY ST - road construction - BO/TR/AS/CC
    Start Time: 2025-06-10T16:03:30.000-06:00
    End Time: 2025-06-27T01:00:00.000-06:00
    maplocal traffic
  • MAP
    MCKINLEY ST - road construction - CC/AS RT
    MCKINLEY ST - road construction - CC/AS RT
    Start Time: 2025-06-10T01:00:00.000-06:00
    End Time: 2025-06-27T01:00:00.000-06:00
    maplocal traffic
  • MAP
    MARSHALL AVE - road construction - MANHOLE REHAB (20-21-419)
    MARSHALL AVE - road construction - MANHOLE REHAB (20-21-419)
    Start Time: 2025-06-09T08:00:00.000-06:00
    End Time: 2025-06-19T16:00:00.000-06:00
    maplocal traffic
  • MAP
    43RD PL - road construction - REMOVE AND REPLACE SIDEWALK
    43RD PL - road construction - REMOVE AND REPLACE SIDEWALK
    Start Time: 2025-06-09T07:00:00.000-06:00
    End Time: 2025-06-27T15:00:00.000-06:00
    maplocal traffic
  • MAP
    COOLIDGE ST - road construction - BO, CC, AS, PH, PC, RT, TR, UG
    COOLIDGE ST - road construction - BO, CC, AS, PH, PC, RT, TR, UG
    Start Time: 2025-06-09T01:00:00.000-06:00
    End Time: 2025-06-27T01:00:00.000-06:00
    maplocal traffic
  • MAP
    3RD AVE - road construction - SE
    3RD AVE - road construction - SE
    Start Time: 2025-06-09T01:00:00.000-06:00
    End Time: 2025-06-23T01:00:00.000-06:00
    maplocal traffic
  • MAP
    NORTH VALLEY PKWY - road construction - BO, TR, RT, PC
    NORTH VALLEY PKWY - road construction - BO, TR, RT, PC
    Start Time: 2025-06-07T23:43:00.000-06:00
    End Time: 2025-06-30T01:00:00.000-06:00
    maplocal traffic
  • MAP
    16TH PL - road construction - Catch Basin / Storm Drain Installation
    16TH PL - road construction - Catch Basin / Storm Drain Installation
    Start Time: 2025-06-07T18:50:00.000-06:00
    End Time: 2025-06-27T01:00:00.000-06:00
    maplocal traffic
  • MAP
    ROOSEVELT ST - road construction - Leaky Water Services
    ROOSEVELT ST - road construction - Leaky Water Services
    Start Time: 2025-06-06T09:30:00.000-06:00
    End Time: 2025-06-20T17:00:00.000-06:00
    maplocal traffic
  • MAP
    36TH ST - road construction - PC
    36TH ST - road construction - PC
    Start Time: 2025-06-06T01:00:00.000-06:00
    End Time: 2025-06-20T01:00:00.000-06:00
    maplocal traffic
  • MAP
    BELL RD - road construction - BO, TR
    BELL RD - road construction - BO, TR
    Start Time: 2025-06-06T01:00:00.000-06:00
    End Time: 2025-06-20T01:00:00.000-06:00
    maplocal traffic
  • MAP
    BELL RD - road construction - AS
    BELL RD - road construction - AS
    Start Time: 2025-06-06T01:00:00.000-06:00
    End Time: 2025-06-20T01:00:00.000-06:00
    maplocal traffic
  • MAP
    BROADWAY RD - road construction - GM, AS, CC
    BROADWAY RD - road construction - GM, AS, CC
    Start Time: 2025-06-05T16:02:30.000-06:00
    End Time: 2025-06-21T01:00:00.000-06:00
    maplocal traffic
  • MAP
    29TH AVE - road construction - DRAINAGE WORK
    29TH AVE - road construction - DRAINAGE WORK
    Start Time: 2025-06-05T16:02:30.000-06:00
    End Time: 2025-06-20T17:00:00.000-06:00
    maplocal traffic
  • MAP
    52ND ST - road construction - BO
    52ND ST - road construction - BO
    Start Time: 2025-06-04T16:02:30.000-06:00
    End Time: 2025-06-23T01:00:00.000-06:00
    maplocal traffic
  • MAP
    16TH ST - road construction - REPLACE FH
    16TH ST - road construction - REPLACE FH
    Start Time: 2025-06-04T09:30:00.000-06:00
    End Time: 2025-06-18T16:30:00.000-06:00
    maplocal traffic
  • MAP
    71ST DR - road construction - RT
    71ST DR - road construction - RT
    Start Time: 2025-06-04T01:00:00.000-06:00
    End Time: 2025-06-18T01:00:00.000-06:00
    maplocal traffic
  • MAP
    GRANT ST - road construction - TR BO
    GRANT ST - road construction - TR BO
    Start Time: 2025-06-04T01:00:00.000-06:00
    End Time: 2025-06-18T01:00:00.000-06:00
    maplocal traffic
  • MAP
    430 N DOBSON - road construction - B & F to do sewer and water work for the City of Mesa CP0834Q017. with multiple restrictions in the intersection of N Dobson Rd and W University Dr
    430 N DOBSON - road construction - B & F to do sewer and water work for the City of Mesa CP0834Q017. with multiple restrictions in the intersection of N Dobson Rd and W University Dr
    Start Time: 2025-06-03T18:00:00.000-06:00
    End Time: 2025-07-10T18:00:00.000-06:00
    maplocal traffic
  • MAP
    Charter Oak Rd - road construction - Micro Trench project. Expect lane and parking restrictions.
    Charter Oak Rd - road construction - Micro Trench project. Expect lane and parking restrictions.
    Start Time: 2025-06-03T13:01:30.000-06:00
    End Time: 2025-07-03T16:00:00.000-06:00
    maplocal traffic
  • MAP
    Charter Oak Rd - road construction - Micro trench project. Expect lane and parking restrictions
    Charter Oak Rd - road construction - Micro trench project. Expect lane and parking restrictions
    Start Time: 2025-06-03T12:17:30.000-06:00
    End Time: 2025-07-03T16:00:00.000-06:00
    maplocal traffic
  • MAP
    Columbine Dr - road construction - Micro trench project. Expect lane and parking restrictions.
    Columbine Dr - road construction - Micro trench project. Expect lane and parking restrictions.
    Start Time: 2025-06-03T12:13:30.000-06:00
    End Time: 2025-07-03T16:00:00.000-06:00
    maplocal traffic
  • MAP
    35TH AVE - road construction - Asphalt - Concrete Restoration
    35TH AVE - road construction - Asphalt - Concrete Restoration
    Start Time: 2025-06-03T09:30:00.000-06:00
    End Time: 2025-06-20T17:00:00.000-06:00
    maplocal traffic
  • MAP
    16TH ST - road construction - REMOVE AND REPLACE SIDEWALK
    16TH ST - road construction - REMOVE AND REPLACE SIDEWALK
    Start Time: 2025-06-03T07:00:00.000-06:00
    End Time: 2025-06-20T14:00:00.000-06:00
    maplocal traffic
  • MAP
    PALM LN - road construction - REMOVE AND REPLACE SIDEWALK
    PALM LN - road construction - REMOVE AND REPLACE SIDEWALK
    Start Time: 2025-06-03T07:00:00.000-06:00
    End Time: 2025-06-27T15:00:00.000-06:00
    maplocal traffic
  • MAP
    29TH AVE - road construction - PH, BO
    29TH AVE - road construction - PH, BO
    Start Time: 2025-06-03T01:00:00.000-06:00
    End Time: 2025-06-20T01:00:00.000-06:00
    maplocal traffic
  • MAP
    7TH AVE - road construction - PC, SE
    7TH AVE - road construction - PC, SE
    Start Time: 2025-06-02T16:02:30.000-06:00
    End Time: 2025-06-20T01:00:00.000-06:00
    maplocal traffic
  • MAP
    91ST AVE - road construction - INSTALL 1" SERVICE
    91ST AVE - road construction - INSTALL 1" SERVICE
    Start Time: 2025-06-02T09:30:00.000-06:00
    End Time: 2025-06-22T16:00:00.000-06:00
    maplocal traffic
  • MAP
    INDIAN SCHOOL RD - road construction - TRAFFIC SIGNALS
    INDIAN SCHOOL RD - road construction - TRAFFIC SIGNALS
    Start Time: 2025-06-02T09:30:00.000-06:00
    End Time: 2025-07-07T17:00:00.000-06:00
    maplocal traffic
  • MAP
    7TH ST - road construction - Asphalt - Concrete Restoration
    7TH ST - road construction - Asphalt - Concrete Restoration
    Start Time: 2025-06-02T01:00:00.000-06:00
    End Time: 2025-06-20T17:00:00.000-06:00
    maplocal traffic
  • MAP
    51ST ST - road construction - PH, BO, RT, CC, AS
    51ST ST - road construction - PH, BO, RT, CC, AS
    Start Time: 2025-06-02T01:00:00.000-06:00
    End Time: 2025-06-30T01:00:00.000-06:00
    maplocal traffic
  • MAP
    19TH AVE - road construction - REPLACE FIRE HYDRANT
    19TH AVE - road construction - REPLACE FIRE HYDRANT
    Start Time: 2025-05-31T13:12:00.000-06:00
    End Time: 2025-06-20T16:30:00.000-06:00
    maplocal traffic
  • MAP
    17TH ST - road construction - Sewer Adjustments
    17TH ST - road construction - Sewer Adjustments
    Start Time: 2025-05-31T13:12:00.000-06:00
    End Time: 2025-06-24T01:00:00.000-06:00
    maplocal traffic
  • MAP
    WARNER ELLIOT LOOP - road construction - ADA RAMP/Patch Back
    WARNER ELLIOT LOOP - road construction - ADA RAMP/Patch Back
    Start Time: 2025-05-31T13:12:00.000-06:00
    End Time: 2025-06-27T17:00:00.000-06:00
    maplocal traffic
  • MAP
    47TH AVE - road construction - BF, BO,PI, PH, PC, RT, UG
    47TH AVE - road construction - BF, BO,PI, PH, PC, RT, UG
    Start Time: 2025-05-31T13:12:00.000-06:00
    End Time: 2025-06-24T01:00:00.000-06:00
    maplocal traffic
  • MAP
    POLK ST - road construction - MH SE
    POLK ST - road construction - MH SE
    Start Time: 2025-05-31T13:12:00.000-06:00
    End Time: 2025-06-18T01:00:00.000-06:00
    maplocal traffic
  • MAP
    2ND AVE - road construction - Construction on new build/Utility in Alley
    2ND AVE - road construction - Construction on new build/Utility in Alley
    Start Time: 2025-05-31T13:12:00.000-06:00
    End Time: 2025-07-16T01:00:00.000-06:00
    maplocal traffic
  • MAP
    3RD AVE - road construction - UTILITY ADJUSTMENT
    3RD AVE - road construction - UTILITY ADJUSTMENT
    Start Time: 2025-05-31T13:12:00.000-06:00
    End Time: 2025-06-23T15:00:00.000-06:00
    maplocal traffic
  • MAP
    WILLETTA ST - road construction - APS power run
    WILLETTA ST - road construction - APS power run
    Start Time: 2025-05-31T13:12:00.000-06:00
    End Time: 2025-06-23T17:00:00.000-06:00
    maplocal traffic
  • MAP
    11TH AVE - road construction - sewer work
    11TH AVE - road construction - sewer work
    Start Time: 2025-05-31T13:12:00.000-06:00
    End Time: 2025-07-01T01:00:00.000-06:00
    maplocal traffic
  • MAP
    15TH ST - road construction - BO/TR/AS/CC
    15TH ST - road construction - BO/TR/AS/CC
    Start Time: 2025-05-31T13:12:00.000-06:00
    End Time: 2025-06-27T01:00:00.000-06:00
    maplocal traffic
  • MAP
    24TH ST - road construction - NEW INTERSECTION INSTALL
    24TH ST - road construction - NEW INTERSECTION INSTALL
    Start Time: 2025-05-28T09:30:00.000-06:00
    End Time: 2025-06-23T17:00:00.000-06:00
    maplocal traffic
  • MAP
    RAYMOND ST - road construction - trench, asphalt, concrete
    RAYMOND ST - road construction - trench, asphalt, concrete
    Start Time: 2025-05-20T08:00:00.000-06:00
    End Time: 2025-06-20T17:00:00.000-06:00
    maplocal traffic
  • MAP
    BELL RD - road construction - Sewer Rehabilitation MH 46 & 47
    BELL RD - road construction - Sewer Rehabilitation MH 46 & 47
    Start Time: 2025-05-17T07:16:00.000-06:00
    End Time: 2025-06-23T01:00:00.000-06:00
    maplocal traffic
  • MAP
    Granite Vista Loop S - road construction - Road work, flagging operations, be prepared to stop
    Granite Vista Loop S - road construction - Road work, flagging operations, be prepared to stop
    Start Time: 2025-05-15T09:27:00.000-06:00
    End Time: 2025-06-27T17:00:00.000-06:00
    maplocal traffic
  • MAP
    76th Dr - road construction - Microtrench project. Expect lane restrictions and on street parking restrictions.
    76th Dr - road construction - Microtrench project. Expect lane restrictions and on street parking restrictions.
    Start Time: 2025-05-13T17:54:30.000-06:00
    End Time: 2025-06-20T17:00:00.000-06:00
    maplocal traffic
  • MAP
    Comet Ave - road construction - Micro trench project by CAN-EZ. Expect lane/parking restrictions.
    Comet Ave - road construction - Micro trench project by CAN-EZ. Expect lane/parking restrictions.
    Start Time: 2025-05-12T08:31:00.000-06:00
    End Time: 2025-06-20T17:00:00.000-06:00
    maplocal traffic
  • MAP
    Cinnabar Ave - road construction - Micro Trench project by CAN-EZ. Expect lane/parking restrictions.
    Cinnabar Ave - road construction - Micro Trench project by CAN-EZ. Expect lane/parking restrictions.
    Start Time: 2025-05-12T08:30:00.000-06:00
    End Time: 2025-06-20T17:00:00.000-06:00
    maplocal traffic
  • MAP
    Brown St - road construction - Micro trench project. Expect lane and parking restrictions.
    Brown St - road construction - Micro trench project. Expect lane and parking restrictions.
    Start Time: 2025-05-12T08:27:00.000-06:00
    End Time: 2025-07-11T18:00:00.000-06:00
    maplocal traffic
  • MAP
    Cheryl Dr - road construction - Micro trench project by CAN-EZ. Expect lane/parking restriction.
    Cheryl Dr - road construction - Micro trench project by CAN-EZ. Expect lane/parking restriction.
    Start Time: 2025-05-12T08:24:30.000-06:00
    End Time: 2025-06-20T17:00:00.000-06:00
    maplocal traffic
  • MAP
    Beryl Ave - road construction - Micro trench project by CAN-EZ. Expect lane/street parking restrictions.
    Beryl Ave - road construction - Micro trench project by CAN-EZ. Expect lane/street parking restrictions.
    Start Time: 2025-05-12T08:22:30.000-06:00
    End Time: 2025-06-20T17:00:00.000-06:00
    maplocal traffic
  • MAP
    various traffic control
    various traffic control
    Start Time: 2025-06-04T17:20:00.000-06:00
    End Time: 2025-07-04T01:00:00.000-06:00
    maplocal traffic
  • MAP
    POLK ST - road construction - Storm Drain Installation
    POLK ST - road construction - Storm Drain Installation
    Start Time: 2025-06-14T09:30:00.000-06:00
    End Time: 2025-06-28T17:00:00.000-06:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow