Current Constructions
- MAPW Erie St is closed from N Chippewa Pl to N Alma School Rd.
W Erie St is closed from N Chippewa Pl to N Alma School Rd.
Start Time: 2025-05-27T09:20:30.000-06:00
End Time: 2025-06-16T05:58:01.578-06:00
map local traffic - MAPAlma School Rd - road construction - Channels & Hard Closures
Alma School Rd - road construction - Channels & Hard Closures
Start Time: 2025-06-09T17:57:00.000-06:00
End Time: 2025-06-21T18:00:00.000-06:00
map local traffic - MAPDOBSON RD - road construction - OPEN CUT - WEEKEND WORK
DOBSON RD - road construction - OPEN CUT - WEEKEND WORK
Start Time: 2025-06-11T18:02:30.000-06:00
End Time: 2025-07-13T18:00:00.000-06:00
map local traffic - MAP34TH ST - road construction - AS
34TH ST - road construction - AS
Start Time: 2025-06-09T01:00:00.000-06:00
End Time: 2025-06-20T01:00:00.000-06:00
map local traffic - MAPIVANHOE ST - road construction - ASPHALT RESTORATION ON ALLEY
IVANHOE ST - road construction - ASPHALT RESTORATION ON ALLEY
Start Time: 2025-06-08T18:00:00.000-06:00
End Time: 2025-06-19T18:00:00.000-06:00
map local traffic - MAPWarner Rd - road construction - RESTO
Warner Rd - road construction - RESTO
Start Time: 2025-06-04T18:00:00.000-06:00
End Time: 2025-06-16T18:00:00.000-06:00
map local traffic - MAPLIBERTY LN - road construction - MISCELLANEOUS CIVIL WORK
LIBERTY LN - road construction - MISCELLANEOUS CIVIL WORK
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAPEllis - road construction - Fiber pulling, resto
Ellis - road construction - Fiber pulling, resto
Start Time: 2025-05-30T08:57:00.000-06:00
End Time: 2025-06-26T18:00:00.000-06:00
map local traffic - MAPInovation - road construction - Fiber pulling, resto
Inovation - road construction - Fiber pulling, resto
Start Time: 2025-05-30T08:57:00.000-06:00
End Time: 2025-06-26T18:00:00.000-06:00
map local traffic - MAPclose eb wb left lanes
close eb wb left lanes
Start Time: 2025-06-16T03:53:30.000-06:00
End Time: 2025-06-28T01:00:00.000-06:00
map local traffic - MAPRoadwork on N 67th Ave from W Happy Valley Rd to W Deer Valley Rd.
Roadwork on N 67th Ave from W Happy Valley Rd to W Deer Valley Rd.
Start Time: 2025-06-16T03:10:30.000-06:00
End Time: 2025-06-16T05:57:48.739-06:00
map local traffic - MAP40TH ST - road construction - ADA RAMP INSTALL
40TH ST - road construction - ADA RAMP INSTALL
Start Time: 2025-06-16T03:10:30.000-06:00
End Time: 2025-06-23T17:00:00.000-06:00
map local traffic - MAPshift traffic to south
shift traffic to south
Start Time: 2025-06-16T01:45:00.000-06:00
End Time: 2025-07-05T01:00:00.000-06:00
map local traffic - MAPshift traffic to the west
shift traffic to the west
Start Time: 2025-06-16T01:29:00.000-06:00
End Time: 2025-06-28T01:00:00.000-06:00
map local traffic - MAPRight lane closed on S Rural Rd Southbound from E Hermosa Dr to E Minton Dr 5/12/2025 12:00 AM to 7/1/2025 12:00 AM
Right lane closed on S Rural Rd Southbound from E Hermosa Dr to E Minton Dr 5/12/2025 12:00 AM to 7/1/2025 12:00 AM
Start Time: 2025-06-16T01:10:00.000-06:00
End Time: 2025-06-17T00:59:00.000-06:00
map local traffic - MAPExit ramp closed on ramp from 101-LOOP Westbound to W Beardsley Rd 5/20/2025 12:00 AM to 7/20/2025 5:00 AM
Exit ramp closed on ramp from 101-LOOP Westbound to W Beardsley Rd 5/20/2025 12:00 AM to 7/20/2025 5:00 AM
Start Time: 2025-05-20T08:15:00.000-06:00
End Time: 2025-06-17T00:59:00.000-06:00
map local traffic - MAPOn ramp closed on ramp from W Beardsley Rd to 101-LOOP Eastbound 5/20/2025 12:00 AM to 7/20/2025 5:00 AM
On ramp closed on ramp from W Beardsley Rd to 101-LOOP Eastbound 5/20/2025 12:00 AM to 7/20/2025 5:00 AM
Start Time: 2025-05-20T01:21:30.000-06:00
End Time: 2025-06-17T00:59:00.000-06:00
map local traffic - MAPOn ramp closed on ramp from W Beardsley Rd to 101-LOOP Westbound 5/13/2025 12:00 AM to 7/12/2025 5:00 AM
On ramp closed on ramp from W Beardsley Rd to 101-LOOP Westbound 5/13/2025 12:00 AM to 7/12/2025 5:00 AM
Start Time: 2025-05-13T07:01:00.000-06:00
End Time: 2025-06-17T00:59:00.000-06:00
map local traffic - MAPRoadwork on N Cave Creek Rd from Dynamite Blvd to Pinnacle Peak Rd.
Roadwork on N Cave Creek Rd from Dynamite Blvd to Pinnacle Peak Rd.
Start Time: 2025-06-16T01:10:00.000-06:00
End Time: 2025-06-16T05:57:48.739-06:00
map local traffic - MAPMADISON ST - road construction - sewer work
MADISON ST - road construction - sewer work
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-07-01T01:00:00.000-06:00
map local traffic - MAPELLIOT RD - road construction - GM
ELLIOT RD - road construction - GM
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-06-28T01:00:00.000-06:00
map local traffic - MAPROOSEVELT ST - road construction - AB
ROOSEVELT ST - road construction - AB
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-06-30T01:00:00.000-06:00
map local traffic - MAPMADISON ST - road construction - NS
MADISON ST - road construction - NS
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-06-30T01:00:00.000-06:00
map local traffic - MAP16TH ST - road construction - MH, DE, SE
16TH ST - road construction - MH, DE, SE
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-06-18T01:00:00.000-06:00
map local traffic - MAP2ND ST - road construction - NS
2ND ST - road construction - NS
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-06-30T01:00:00.000-06:00
map local traffic - MAP44TH ST - road construction - SE
44TH ST - road construction - SE
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-06-30T01:00:00.000-06:00
map local traffic - MAP47TH DR - road construction - CP
47TH DR - road construction - CP
Start Time: 2025-06-16T01:00:00.000-06:00
End Time: 2025-06-20T01:00:00.000-06:00
map local traffic - MAPWASHINGTON ST - road construction - SE
WASHINGTON ST - road construction - SE
Start Time: 2025-06-15T23:10:00.000-06:00
End Time: 2025-07-01T01:00:00.000-06:00
map local traffic - MAPW Madison St is closed from S 7th Ave to S 9th Ave.
W Madison St is closed from S 7th Ave to S 9th Ave.
Start Time: 2025-06-11T15:34:30.000-06:00
End Time: 2025-06-16T05:57:48.739-06:00
map local traffic - MAPvarious traffic control
various traffic control
Start Time: 2025-06-11T15:18:00.000-06:00
End Time: 2025-06-26T01:00:00.000-06:00
map local traffic - MAPvarious traffic control
various traffic control
Start Time: 2025-06-11T14:57:30.000-06:00
End Time: 2025-07-11T01:00:00.000-06:00
map local traffic - MAPshift traffic
shift traffic
Start Time: 2025-06-11T01:00:00.000-06:00
End Time: 2025-06-19T01:00:00.000-06:00
map local traffic - MAPvarious
various
Start Time: 2025-06-10T01:00:00.000-06:00
End Time: 2025-07-05T01:00:00.000-06:00
map local traffic - MAPClose SB
Close SB
Start Time: 2025-06-09T11:51:00.000-06:00
End Time: 2025-07-13T01:00:00.000-06:00
map local traffic - MAPvarious traffic control
various traffic control
Start Time: 2025-06-04T09:41:00.000-06:00
End Time: 2025-08-01T01:00:00.000-06:00
map local traffic - MAPvarious traffic control
various traffic control
Start Time: 2025-06-03T12:26:00.000-06:00
End Time: 2025-06-21T01:00:00.000-06:00
map local traffic - MAPN Cotton Ln is closed from W Waddell Rd to W Peoria Ave.
N Cotton Ln is closed from W Waddell Rd to W Peoria Ave.
Start Time: 2025-05-27T07:58:30.000-06:00
End Time: 2025-06-16T05:57:48.739-06:00
map local traffic - MAPOlive Ave - road construction - Road work, road closed. Use detour route
Olive Ave - road construction - Road work, road closed. Use detour route
Start Time: 2025-05-19T01:04:30.000-06:00
End Time: 2025-06-20T01:00:00.000-06:00
map local traffic - MAPShift traffic to the east
Shift traffic to the east
Start Time: 2025-05-19T01:00:00.000-06:00
End Time: 2025-06-28T01:00:00.000-06:00
map local traffic - MAPW Myrtle Ave is closed from N 59th Ave to N 58th Ave.
W Myrtle Ave is closed from N 59th Ave to N 58th Ave.
Start Time: 2025-05-13T15:54:30.000-06:00
End Time: 2025-06-28T01:00:00.000-06:00
map local traffic - MAPflagger station
flagger station
Start Time: 2025-05-12T01:00:00.000-06:00
End Time: 2025-07-05T01:00:00.000-06:00
map local traffic - MAPMcKellips Rd - road construction - Road work, road closed. Follow detour route
McKellips Rd - road construction - Road work, road closed. Follow detour route
Start Time: 2025-03-24T04:09:45.000-06:00
End Time: 2025-07-07T06:00:00.000-06:00
map local traffic - MAPS 99th Ave is closed from W Lower Buckeye Rd to AZ-85/W Buckeye Rd.
S 99th Ave is closed from W Lower Buckeye Rd to AZ-85/W Buckeye Rd.
Start Time: 2025-03-11T07:53:00.000-06:00
End Time: 2025-06-16T05:57:48.739-06:00
map local traffic - MAPRoadwork on N Cave Creek Rd from Dynamite Blvd to Pinnacle Peak Rd.
Roadwork on N Cave Creek Rd from Dynamite Blvd to Pinnacle Peak Rd.
Start Time: 2025-06-15T10:17:30.000-06:00
End Time: 2025-06-16T05:57:48.739-06:00
map local traffic - MAP3RD AVE - road construction - R&R ASPHALT
3RD AVE - road construction - R&R ASPHALT
Start Time: 2025-06-14T11:06:30.000-06:00
End Time: 2025-06-27T16:30:00.000-06:00
map local traffic - MAPPOLK ST - road construction - Storm Drain Installation
POLK ST - road construction - Storm Drain Installation
Start Time: 2025-06-14T09:30:00.000-06:00
End Time: 2025-06-28T17:00:00.000-06:00
map local traffic - MAPBELL RD - road construction - Sewer Rehabilitation MH 45 EAST
BELL RD - road construction - Sewer Rehabilitation MH 45 EAST
Start Time: 2025-06-14T09:30:00.000-06:00
End Time: 2025-06-28T17:00:00.000-06:00
map local traffic - MAPBUCKEYE RD - road construction - SE
BUCKEYE RD - road construction - SE
Start Time: 2025-06-12T01:00:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAPGREENWAY RD - road construction - Micro Seal / Edge Millings
GREENWAY RD - road construction - Micro Seal / Edge Millings
Start Time: 2025-06-11T08:02:00.000-06:00
End Time: 2025-06-27T17:00:00.000-06:00
map local traffic - MAP32ND ST - road construction - UG, EM
32ND ST - road construction - UG, EM
Start Time: 2025-06-11T01:00:00.000-06:00
End Time: 2025-06-18T01:00:00.000-06:00
map local traffic - MAPRoadwork on W Indian School Rd from AZ-303/Estrella Fwy to N Citrus Rd (Indian School Rd).
Roadwork on W Indian School Rd from AZ-303/Estrella Fwy to N Citrus Rd (Indian School Rd).
Start Time: 2025-06-09T20:55:30.000-06:00
End Time: 2025-06-16T05:57:48.739-06:00
map local traffic - MAPBASELINE RD - road construction - GM
BASELINE RD - road construction - GM
Start Time: 2025-06-09T01:00:00.000-06:00
End Time: 2025-06-28T01:00:00.000-06:00
map local traffic - MAPRoadwork on S Cotton Ln from S Estrella Pkwy (Cotton Ln) to AZ-85.
Roadwork on S Cotton Ln from S Estrella Pkwy (Cotton Ln) to AZ-85.
Start Time: 2025-06-06T16:47:30.000-06:00
End Time: 2025-06-16T05:57:48.739-06:00
map local traffic - MAPPINNACLE PEAK RD - road construction - offsite improvements
PINNACLE PEAK RD - road construction - offsite improvements
Start Time: 2025-06-06T01:00:00.000-06:00
End Time: 2025-06-20T01:00:00.000-06:00
map local traffic - MAPRoadwork on N 67th Ave from W Deer Valley Rd to W Happy Valley Rd.
Roadwork on N 67th Ave from W Deer Valley Rd to W Happy Valley Rd.
Start Time: 2025-06-04T16:33:00.000-06:00
End Time: 2025-06-16T05:57:48.739-06:00
map local traffic - MAP7TH AVE - road construction - UG, PC, DIG, PD
7TH AVE - road construction - UG, PC, DIG, PD
Start Time: 2025-06-03T14:03:00.000-06:00
End Time: 2025-06-23T01:00:00.000-06:00
map local traffic - MAPBROADWAY RD - road construction - PAVING
BROADWAY RD - road construction - PAVING
Start Time: 2025-06-02T01:00:00.000-06:00
End Time: 2025-07-01T01:00:00.000-06:00
map local traffic - MAP99th Ave - road construction - Road work, northbound right lane closed. Slow down in work zones
99th Ave - road construction - Road work, northbound right lane closed. Slow down in work zones
Start Time: 2025-05-30T08:57:00.000-06:00
End Time: 2025-06-30T17:00:00.000-06:00
map local traffic - MAPE DOUBLETREE RANCH RD / N GAINEY CENTER DR - road construction - EB Doubletree Ranch Rd. median lane, left turn lane restricted at Gainey Center Dr. to Gainey Ranch Rd.; WB Doubletree Ranch Rd. thru traffic shifted to the EB Doubletree Ranch Rd. median lane at Gainey; Ranch Rd. to Gainey Center Dr.; TCP#2: EB Doubletree Ranch Rd. thru traffic shifted to the WB Doubletree Ranch Rd median lane at Gainey; Center Dr.; WB Doubletree Ranch Rd. median lane, left turn lane restricted at Gainey Ranch Rd. to Gainey Center Dr.
E DOUBLETREE RANCH RD / N GAINEY CENTER DR - road construction - EB Doubletree Ranch Rd. median lane, left turn lane restricted at Gainey Center Dr. to Gainey Ranch Rd.; WB Doubletree Ranch Rd. thru traffic shifted to the EB Doubletree Ranch Rd. median lane at Gainey; Ranch Rd. to Gainey Center Dr.; TCP#2: EB Doubletree Ranch Rd. thru traffic shifted to the WB Doubletree Ranch Rd median lane at Gainey; Center Dr.; WB Doubletree Ranch Rd. median lane, left turn lane restricted at Gainey Ranch Rd. to Gainey Center Dr.
Start Time: 2025-05-29T17:08:00.000-06:00
End Time: 2025-10-24T01:00:00.000-06:00
map local traffic - MAPTHOMAS RD - road construction - Installation of new traffic signal foundations/poles/conduit
THOMAS RD - road construction - Installation of new traffic signal foundations/poles/conduit
Start Time: 2025-05-23T16:04:00.000-06:00
End Time: 2025-06-30T17:00:00.000-06:00
map local traffic - MAPE THOMAS RD / N PIMA RD - road construction - NB Pima Rd thru lane, shoulder restricted through Thomas Rd.; WB Thomas Rd right turn lane, shoulder restricted at Pima Rd.; SB Pima Rd right turn lane, shoulder restricted at Thomas Rd onto Westbound Merge Lane.
E THOMAS RD / N PIMA RD - road construction - NB Pima Rd thru lane, shoulder restricted through Thomas Rd.; WB Thomas Rd right turn lane, shoulder restricted at Pima Rd.; SB Pima Rd right turn lane, shoulder restricted at Thomas Rd onto Westbound Merge Lane.
Start Time: 2025-05-05T18:52:00.000-06:00
End Time: 2025-07-31T17:00:00.000-06:00
map local traffic - MAPMC 85 - road construction - Road work, left lane closed. Slow down in work zones
MC 85 - road construction - Road work, left lane closed. Slow down in work zones
Start Time: 2025-04-21T10:36:00.000-06:00
End Time: 2025-07-29T13:00:00.000-06:00
map local traffic - MAPRoadwork on S Central Ave from Baseline Rd to Broadway Rd.
Roadwork on S Central Ave from Baseline Rd to Broadway Rd.
Start Time: 2025-03-30T20:23:30.000-06:00
End Time: 2025-06-16T05:57:48.739-06:00
map local traffic - MAPRoadwork on S Central Ave from Broadway Rd to Baseline Rd.
Roadwork on S Central Ave from Broadway Rd to Baseline Rd.
Start Time: 2025-03-29T15:08:30.000-06:00
End Time: 2025-06-16T05:57:48.739-06:00
map local traffic - MAPSONORAN DESERT DR - road construction - Concrete & Paving
SONORAN DESERT DR - road construction - Concrete & Paving
Start Time: 2025-06-13T16:04:00.000-06:00
End Time: 2025-07-01T01:00:00.000-06:00
map local traffic - MAPWILLIAMS DR - road construction - Concrete/Paving
WILLIAMS DR - road construction - Concrete/Paving
Start Time: 2025-06-13T14:02:30.000-06:00
End Time: 2025-06-28T01:00:00.000-06:00
map local traffic - MAPGREENWAY RD - road construction - SE
GREENWAY RD - road construction - SE
Start Time: 2025-06-13T14:02:30.000-06:00
End Time: 2025-07-03T01:00:00.000-06:00
map local traffic - MAP30TH DR - road construction - Concrete/Paving
30TH DR - road construction - Concrete/Paving
Start Time: 2025-06-13T14:02:30.000-06:00
End Time: 2025-06-28T01:00:00.000-06:00
map local traffic - MAP44TH ST - road construction - Asphalt/Concrete Restoration
44TH ST - road construction - Asphalt/Concrete Restoration
Start Time: 2025-06-13T09:30:00.000-06:00
End Time: 2025-06-27T17:00:00.000-06:00
map local traffic - MAP35TH AVE - road construction - PAVING
35TH AVE - road construction - PAVING
Start Time: 2025-06-13T09:30:00.000-06:00
End Time: 2025-06-27T17:00:00.000-06:00
map local traffic - MAP25TH ST - road construction - SIDEWALK WORK /DRIVEWAY
25TH ST - road construction - SIDEWALK WORK /DRIVEWAY
Start Time: 2025-06-13T01:00:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAP35TH AVE - road construction - Concrete Panel
35TH AVE - road construction - Concrete Panel
Start Time: 2025-06-12T09:30:00.000-06:00
End Time: 2025-06-20T17:00:00.000-06:00
map local traffic - MAPARCADIA DR - road construction - Installing Speed Cushions
ARCADIA DR - road construction - Installing Speed Cushions
Start Time: 2025-06-12T09:30:00.000-06:00
End Time: 2025-07-12T17:00:00.000-06:00
map local traffic - MAP48TH ST - road construction - Replace Water Service Line
48TH ST - road construction - Replace Water Service Line
Start Time: 2025-06-12T09:30:00.000-06:00
End Time: 2025-06-20T17:30:00.000-06:00
map local traffic - MAPARCADIA DR - road construction - Installing Speed Cushions
ARCADIA DR - road construction - Installing Speed Cushions
Start Time: 2025-06-12T09:30:00.000-06:00
End Time: 2025-07-12T17:00:00.000-06:00
map local traffic - MAPMARSHALL AVE - road construction - MANHOLE REHAB (20-22-125)
MARSHALL AVE - road construction - MANHOLE REHAB (20-22-125)
Start Time: 2025-06-12T08:00:00.000-06:00
End Time: 2025-06-19T16:00:00.000-06:00
map local traffic - MAPWilliams Rd - road construction - Road work, flagging operations, be prepared to stop
Williams Rd - road construction - Road work, flagging operations, be prepared to stop
Start Time: 2025-06-12T07:00:00.000-06:00
End Time: 2025-06-24T19:00:00.000-06:00
map local traffic - MAPAPACHE ST - road construction - Sign Placement
APACHE ST - road construction - Sign Placement
Start Time: 2025-06-12T07:00:00.000-06:00
End Time: 2025-06-23T17:00:00.000-06:00
map local traffic - MAP10TH ST - road construction - SE
10TH ST - road construction - SE
Start Time: 2025-06-12T01:00:00.000-06:00
End Time: 2025-06-20T01:00:00.000-06:00
map local traffic - MAP87TH AVE - road construction - SC
87TH AVE - road construction - SC
Start Time: 2025-06-12T01:00:00.000-06:00
End Time: 2025-06-26T01:00:00.000-06:00
map local traffic - MAPSOUTH MOUNTAIN AVE - road construction - Asphalt/Concrete Restoration
SOUTH MOUNTAIN AVE - road construction - Asphalt/Concrete Restoration
Start Time: 2025-06-11T09:30:00.000-06:00
End Time: 2025-06-27T17:00:00.000-06:00
map local traffic - MAPWINDSOR AVE - road construction - Install speed hump
WINDSOR AVE - road construction - Install speed hump
Start Time: 2025-06-11T09:30:00.000-06:00
End Time: 2025-06-17T17:00:00.000-06:00
map local traffic - MAPWAHALLA LN - road construction - COOL SEAL
WAHALLA LN - road construction - COOL SEAL
Start Time: 2025-06-10T16:03:30.000-06:00
End Time: 2025-06-21T17:00:00.000-06:00
map local traffic - MAPMULBERRY ST - road construction - BO/TR/AS/CC
MULBERRY ST - road construction - BO/TR/AS/CC
Start Time: 2025-06-10T16:03:30.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAPMCKINLEY ST - road construction - CC/AS RT
MCKINLEY ST - road construction - CC/AS RT
Start Time: 2025-06-10T01:00:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAPMARSHALL AVE - road construction - MANHOLE REHAB (20-21-419)
MARSHALL AVE - road construction - MANHOLE REHAB (20-21-419)
Start Time: 2025-06-09T08:00:00.000-06:00
End Time: 2025-06-19T16:00:00.000-06:00
map local traffic - MAP43RD PL - road construction - REMOVE AND REPLACE SIDEWALK
43RD PL - road construction - REMOVE AND REPLACE SIDEWALK
Start Time: 2025-06-09T07:00:00.000-06:00
End Time: 2025-06-27T15:00:00.000-06:00
map local traffic - MAPCOOLIDGE ST - road construction - BO, CC, AS, PH, PC, RT, TR, UG
COOLIDGE ST - road construction - BO, CC, AS, PH, PC, RT, TR, UG
Start Time: 2025-06-09T01:00:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAP3RD AVE - road construction - SE
3RD AVE - road construction - SE
Start Time: 2025-06-09T01:00:00.000-06:00
End Time: 2025-06-23T01:00:00.000-06:00
map local traffic - MAPNORTH VALLEY PKWY - road construction - BO, TR, RT, PC
NORTH VALLEY PKWY - road construction - BO, TR, RT, PC
Start Time: 2025-06-07T23:43:00.000-06:00
End Time: 2025-06-30T01:00:00.000-06:00
map local traffic - MAP16TH PL - road construction - Catch Basin / Storm Drain Installation
16TH PL - road construction - Catch Basin / Storm Drain Installation
Start Time: 2025-06-07T18:50:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAPROOSEVELT ST - road construction - Leaky Water Services
ROOSEVELT ST - road construction - Leaky Water Services
Start Time: 2025-06-06T09:30:00.000-06:00
End Time: 2025-06-20T17:00:00.000-06:00
map local traffic - MAP36TH ST - road construction - PC
36TH ST - road construction - PC
Start Time: 2025-06-06T01:00:00.000-06:00
End Time: 2025-06-20T01:00:00.000-06:00
map local traffic - MAPBELL RD - road construction - BO, TR
BELL RD - road construction - BO, TR
Start Time: 2025-06-06T01:00:00.000-06:00
End Time: 2025-06-20T01:00:00.000-06:00
map local traffic - MAPBELL RD - road construction - AS
BELL RD - road construction - AS
Start Time: 2025-06-06T01:00:00.000-06:00
End Time: 2025-06-20T01:00:00.000-06:00
map local traffic - MAPBROADWAY RD - road construction - GM, AS, CC
BROADWAY RD - road construction - GM, AS, CC
Start Time: 2025-06-05T16:02:30.000-06:00
End Time: 2025-06-21T01:00:00.000-06:00
map local traffic - MAP29TH AVE - road construction - DRAINAGE WORK
29TH AVE - road construction - DRAINAGE WORK
Start Time: 2025-06-05T16:02:30.000-06:00
End Time: 2025-06-20T17:00:00.000-06:00
map local traffic - MAP52ND ST - road construction - BO
52ND ST - road construction - BO
Start Time: 2025-06-04T16:02:30.000-06:00
End Time: 2025-06-23T01:00:00.000-06:00
map local traffic - MAP16TH ST - road construction - REPLACE FH
16TH ST - road construction - REPLACE FH
Start Time: 2025-06-04T09:30:00.000-06:00
End Time: 2025-06-18T16:30:00.000-06:00
map local traffic - MAP71ST DR - road construction - RT
71ST DR - road construction - RT
Start Time: 2025-06-04T01:00:00.000-06:00
End Time: 2025-06-18T01:00:00.000-06:00
map local traffic - MAPGRANT ST - road construction - TR BO
GRANT ST - road construction - TR BO
Start Time: 2025-06-04T01:00:00.000-06:00
End Time: 2025-06-18T01:00:00.000-06:00
map local traffic - MAP430 N DOBSON - road construction - B & F to do sewer and water work for the City of Mesa CP0834Q017. with multiple restrictions in the intersection of N Dobson Rd and W University Dr
430 N DOBSON - road construction - B & F to do sewer and water work for the City of Mesa CP0834Q017. with multiple restrictions in the intersection of N Dobson Rd and W University Dr
Start Time: 2025-06-03T18:00:00.000-06:00
End Time: 2025-07-10T18:00:00.000-06:00
map local traffic - MAPCharter Oak Rd - road construction - Micro Trench project. Expect lane and parking restrictions.
Charter Oak Rd - road construction - Micro Trench project. Expect lane and parking restrictions.
Start Time: 2025-06-03T13:01:30.000-06:00
End Time: 2025-07-03T16:00:00.000-06:00
map local traffic - MAPCharter Oak Rd - road construction - Micro trench project. Expect lane and parking restrictions
Charter Oak Rd - road construction - Micro trench project. Expect lane and parking restrictions
Start Time: 2025-06-03T12:17:30.000-06:00
End Time: 2025-07-03T16:00:00.000-06:00
map local traffic - MAPColumbine Dr - road construction - Micro trench project. Expect lane and parking restrictions.
Columbine Dr - road construction - Micro trench project. Expect lane and parking restrictions.
Start Time: 2025-06-03T12:13:30.000-06:00
End Time: 2025-07-03T16:00:00.000-06:00
map local traffic - MAP35TH AVE - road construction - Asphalt - Concrete Restoration
35TH AVE - road construction - Asphalt - Concrete Restoration
Start Time: 2025-06-03T09:30:00.000-06:00
End Time: 2025-06-20T17:00:00.000-06:00
map local traffic - MAP16TH ST - road construction - REMOVE AND REPLACE SIDEWALK
16TH ST - road construction - REMOVE AND REPLACE SIDEWALK
Start Time: 2025-06-03T07:00:00.000-06:00
End Time: 2025-06-20T14:00:00.000-06:00
map local traffic - MAPPALM LN - road construction - REMOVE AND REPLACE SIDEWALK
PALM LN - road construction - REMOVE AND REPLACE SIDEWALK
Start Time: 2025-06-03T07:00:00.000-06:00
End Time: 2025-06-27T15:00:00.000-06:00
map local traffic - MAP29TH AVE - road construction - PH, BO
29TH AVE - road construction - PH, BO
Start Time: 2025-06-03T01:00:00.000-06:00
End Time: 2025-06-20T01:00:00.000-06:00
map local traffic - MAP7TH AVE - road construction - PC, SE
7TH AVE - road construction - PC, SE
Start Time: 2025-06-02T16:02:30.000-06:00
End Time: 2025-06-20T01:00:00.000-06:00
map local traffic - MAP91ST AVE - road construction - INSTALL 1" SERVICE
91ST AVE - road construction - INSTALL 1" SERVICE
Start Time: 2025-06-02T09:30:00.000-06:00
End Time: 2025-06-22T16:00:00.000-06:00
map local traffic - MAPINDIAN SCHOOL RD - road construction - TRAFFIC SIGNALS
INDIAN SCHOOL RD - road construction - TRAFFIC SIGNALS
Start Time: 2025-06-02T09:30:00.000-06:00
End Time: 2025-07-07T17:00:00.000-06:00
map local traffic - MAP7TH ST - road construction - Asphalt - Concrete Restoration
7TH ST - road construction - Asphalt - Concrete Restoration
Start Time: 2025-06-02T01:00:00.000-06:00
End Time: 2025-06-20T17:00:00.000-06:00
map local traffic - MAP51ST ST - road construction - PH, BO, RT, CC, AS
51ST ST - road construction - PH, BO, RT, CC, AS
Start Time: 2025-06-02T01:00:00.000-06:00
End Time: 2025-06-30T01:00:00.000-06:00
map local traffic - MAP19TH AVE - road construction - REPLACE FIRE HYDRANT
19TH AVE - road construction - REPLACE FIRE HYDRANT
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-20T16:30:00.000-06:00
map local traffic - MAP17TH ST - road construction - Sewer Adjustments
17TH ST - road construction - Sewer Adjustments
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-24T01:00:00.000-06:00
map local traffic - MAPWARNER ELLIOT LOOP - road construction - ADA RAMP/Patch Back
WARNER ELLIOT LOOP - road construction - ADA RAMP/Patch Back
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-27T17:00:00.000-06:00
map local traffic - MAP47TH AVE - road construction - BF, BO,PI, PH, PC, RT, UG
47TH AVE - road construction - BF, BO,PI, PH, PC, RT, UG
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-24T01:00:00.000-06:00
map local traffic - MAPPOLK ST - road construction - MH SE
POLK ST - road construction - MH SE
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-18T01:00:00.000-06:00
map local traffic - MAP2ND AVE - road construction - Construction on new build/Utility in Alley
2ND AVE - road construction - Construction on new build/Utility in Alley
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-07-16T01:00:00.000-06:00
map local traffic - MAP3RD AVE - road construction - UTILITY ADJUSTMENT
3RD AVE - road construction - UTILITY ADJUSTMENT
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-23T15:00:00.000-06:00
map local traffic - MAPWILLETTA ST - road construction - APS power run
WILLETTA ST - road construction - APS power run
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-23T17:00:00.000-06:00
map local traffic - MAP11TH AVE - road construction - sewer work
11TH AVE - road construction - sewer work
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-07-01T01:00:00.000-06:00
map local traffic - MAP15TH ST - road construction - BO/TR/AS/CC
15TH ST - road construction - BO/TR/AS/CC
Start Time: 2025-05-31T13:12:00.000-06:00
End Time: 2025-06-27T01:00:00.000-06:00
map local traffic - MAP24TH ST - road construction - NEW INTERSECTION INSTALL
24TH ST - road construction - NEW INTERSECTION INSTALL
Start Time: 2025-05-28T09:30:00.000-06:00
End Time: 2025-06-23T17:00:00.000-06:00
map local traffic - MAPRAYMOND ST - road construction - trench, asphalt, concrete
RAYMOND ST - road construction - trench, asphalt, concrete
Start Time: 2025-05-20T08:00:00.000-06:00
End Time: 2025-06-20T17:00:00.000-06:00
map local traffic - MAPBELL RD - road construction - Sewer Rehabilitation MH 46 & 47
BELL RD - road construction - Sewer Rehabilitation MH 46 & 47
Start Time: 2025-05-17T07:16:00.000-06:00
End Time: 2025-06-23T01:00:00.000-06:00
map local traffic - MAPGranite Vista Loop S - road construction - Road work, flagging operations, be prepared to stop
Granite Vista Loop S - road construction - Road work, flagging operations, be prepared to stop
Start Time: 2025-05-15T09:27:00.000-06:00
End Time: 2025-06-27T17:00:00.000-06:00
map local traffic - MAP76th Dr - road construction - Microtrench project. Expect lane restrictions and on street parking restrictions.
76th Dr - road construction - Microtrench project. Expect lane restrictions and on street parking restrictions.
Start Time: 2025-05-13T17:54:30.000-06:00
End Time: 2025-06-20T17:00:00.000-06:00
map local traffic - MAPComet Ave - road construction - Micro trench project by CAN-EZ. Expect lane/parking restrictions.
Comet Ave - road construction - Micro trench project by CAN-EZ. Expect lane/parking restrictions.
Start Time: 2025-05-12T08:31:00.000-06:00
End Time: 2025-06-20T17:00:00.000-06:00
map local traffic - MAPCinnabar Ave - road construction - Micro Trench project by CAN-EZ. Expect lane/parking restrictions.
Cinnabar Ave - road construction - Micro Trench project by CAN-EZ. Expect lane/parking restrictions.
Start Time: 2025-05-12T08:30:00.000-06:00
End Time: 2025-06-20T17:00:00.000-06:00
map local traffic - MAPBrown St - road construction - Micro trench project. Expect lane and parking restrictions.
Brown St - road construction - Micro trench project. Expect lane and parking restrictions.
Start Time: 2025-05-12T08:27:00.000-06:00
End Time: 2025-07-11T18:00:00.000-06:00
map local traffic - MAPCheryl Dr - road construction - Micro trench project by CAN-EZ. Expect lane/parking restriction.
Cheryl Dr - road construction - Micro trench project by CAN-EZ. Expect lane/parking restriction.
Start Time: 2025-05-12T08:24:30.000-06:00
End Time: 2025-06-20T17:00:00.000-06:00
map local traffic - MAPBeryl Ave - road construction - Micro trench project by CAN-EZ. Expect lane/street parking restrictions.
Beryl Ave - road construction - Micro trench project by CAN-EZ. Expect lane/street parking restrictions.
Start Time: 2025-05-12T08:22:30.000-06:00
End Time: 2025-06-20T17:00:00.000-06:00
map local traffic - MAPvarious traffic control
various traffic control
Start Time: 2025-06-04T17:20:00.000-06:00
End Time: 2025-07-04T01:00:00.000-06:00
map local traffic - MAPPOLK ST - road construction - Storm Drain Installation
POLK ST - road construction - Storm Drain Installation
Start Time: 2025-06-14T09:30:00.000-06:00
End Time: 2025-06-28T17:00:00.000-06:00