Between I 270; I 270 And US 6 (North Washington) From Mile Point 7 To Mile Point 8.9. Bridge Construction. Alternating Traffic. Starting April 25, 2024 At 9:00PM MDT Until April 26, 2024 At About 5:00AM MDT. Full Schedule Below: • April 25, 9:00PM April 26, 5:00AM Traffic
2024-05-06
Roadnow