Current Constructions
- MAPEntrance Ramp only. Entrance ramp from SH 356 to SH 183 WB will be closed starting at 9:00pm until 5:00am.
Entrance Ramp only. Entrance ramp from SH 356 to SH 183 WB will be closed starting at 9:00pm until 5:00am.
Start Time: 2025-06-17T04:15:30.000-05:00
End Time: 2025-06-17T05:00:00.000-05:00
map local traffic - MAPLane closure scheduled 06/16/2025 - 06/21/2025
Lane closure scheduled 06/16/2025 - 06/21/2025
Start Time: 2025-06-17T04:15:30.000-05:00
End Time: 2025-06-21T15:30:00.000-05:00
map local traffic - MAPRoadwork on I-30 W / US-67 S from 2nd Ave/Exit 47 (I-30) to I-45/US-75/Exit 46 (I-30).
Roadwork on I-30 W / US-67 S from 2nd Ave/Exit 47 (I-30) to I-45/US-75/Exit 46 (I-30).
Start Time: 2025-06-17T01:15:30.000-05:00
End Time: 2025-06-17T06:30:33.072-05:00
map local traffic - MAPEntrance Ramp closed. MAIN LANES not affected. The entrance ramp to the westbound SH 121/183 TEXpress Lanes from southbound SH 121 will be closed. Traffic will be maintained using the general purpose lanes.
Entrance Ramp closed. MAIN LANES not affected. The entrance ramp to the westbound SH 121/183 TEXpress Lanes from southbound SH 121 will be closed. Traffic will be maintained using the general purpose lanes.
Start Time: 2025-06-16T21:12:30.000-05:00
End Time: 2025-06-17T05:00:00.000-05:00
map local traffic - MAPRoadwork on LBJ Express from T I Blvd (I-635 HOV) to I-635/LBJ Fwy Local Lane Access (I-635 HOV).
Roadwork on LBJ Express from T I Blvd (I-635 HOV) to I-635/LBJ Fwy Local Lane Access (I-635 HOV).
Start Time: 2025-06-16T12:13:07.000-05:00
End Time: 2025-06-17T06:30:33.072-05:00
map local traffic - MAPFollow the marked detourFlyover connector ramp onlyWestbound IH-30 the direct connector ramp to Southbound IH-45 will be closed completely for bridge maintenance from June 3 to July 3, to open for July 4th holiday weekend.
Follow the marked detourFlyover connector ramp onlyWestbound IH-30 the direct connector ramp to Southbound IH-45 will be closed completely for bridge maintenance from June 3 to July 3, to open for July 4th holiday weekend.
Start Time: 2025-06-15T08:16:30.000-05:00
End Time: 2025-07-03T05:00:00.000-05:00
map local traffic - MAPRoadwork on TX-12 N Loop from TX-183 W to Loop 12 S.
Roadwork on TX-12 N Loop from TX-183 W to Loop 12 S.
Start Time: 2025-06-08T12:34:26.000-05:00
End Time: 2025-06-17T06:30:33.072-05:00
map local traffic - MAPRoadwork on Main St / FM-720 from TX-289/Preston Rd (W Main St/FM-720) to Frisco St (W Main St/FM-720).
Roadwork on Main St / FM-720 from TX-289/Preston Rd (W Main St/FM-720) to Frisco St (W Main St/FM-720).
Start Time: 2025-06-17T01:15:30.000-05:00
End Time: 2025-06-17T06:30:33.072-05:00
map local traffic - MAPRoadwork on Walnut Hill Ln from Plano Rd (Robin Hill Ln/Kingsley Rd/Walnut Hill Ln) to I-635/Lyndon B Johnson Fwy (Robin Hill Ln/Kingsley Rd/Walnut Hill Ln).
Roadwork on Walnut Hill Ln from Plano Rd (Robin Hill Ln/Kingsley Rd/Walnut Hill Ln) to I-635/Lyndon B Johnson Fwy (Robin Hill Ln/Kingsley Rd/Walnut Hill Ln).
Start Time: 2025-06-16T22:15:30.000-05:00
End Time: 2025-06-17T06:30:33.072-05:00
map local traffic - MAPRoadwork from S 2nd Ave to I-30 W.
Roadwork from S 2nd Ave to I-30 W.
Start Time: 2025-06-16T22:15:30.000-05:00
End Time: 2025-06-17T06:30:33.072-05:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. EB/WB US380 and cross street intersections will have Alternating Daily AND Nightly lane closures, as Zachry Construction crews conduct roadwork improvements along the highway. Motorists are to follow all Detour signage and watch out safely for construction crew members in the work zone.
Alternating lanes closed. Motorists should expect delays. EB/WB US380 and cross street intersections will have Alternating Daily AND Nightly lane closures, as Zachry Construction crews conduct roadwork improvements along the highway. Motorists are to follow all Detour signage and watch out safely for construction crew members in the work zone.
Start Time: 2025-06-16T22:15:30.000-05:00
End Time: 2026-01-31T00:00:00.000-06:00
map local traffic - MAPRoadwork on Saturn Rd from W Miller Rd to W Kingsley Rd.
Roadwork on Saturn Rd from W Miller Rd to W Kingsley Rd.
Start Time: 2025-06-16T19:22:00.000-05:00
End Time: 2025-06-17T06:30:33.072-05:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. EB/WB SH114/IH35W-US377: Lanes will have Alternating closures, as Sinacola crews conduct roadwork. Motorists are to follow all detour signage, and watch out safely for construction crew members within the work zone.
Alternating lanes closed. Motorists should expect delays. EB/WB SH114/IH35W-US377: Lanes will have Alternating closures, as Sinacola crews conduct roadwork. Motorists are to follow all detour signage, and watch out safely for construction crew members within the work zone.
Start Time: 2025-06-16T15:14:01.000-05:00
End Time: 2025-12-31T00:00:00.000-06:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. EB/WB US380 and cross street intersections will have Alternating Daily AND Nightly lane closures, as Zachry Construction crews conduct roadwork improvements along the highway. Motorists are to follow all Detour signage and watch out safely for construction crew members in the work zone.
Alternating lanes closed. Motorists should expect delays. EB/WB US380 and cross street intersections will have Alternating Daily AND Nightly lane closures, as Zachry Construction crews conduct roadwork improvements along the highway. Motorists are to follow all Detour signage and watch out safely for construction crew members in the work zone.
Start Time: 2025-05-24T03:02:30.000-05:00
End Time: 2026-01-31T00:00:00.000-06:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. EB/WB US380 and cross street intersections will have Alternating Daily AND Nightly lane closures, as Zachry Construction crews conduct roadwork improvements along the highway. Motorists are to follow all Detour signage and watch out safely for construction crew members in the work zone.
Alternating lanes closed. Motorists should expect delays. EB/WB US380 and cross street intersections will have Alternating Daily AND Nightly lane closures, as Zachry Construction crews conduct roadwork improvements along the highway. Motorists are to follow all Detour signage and watch out safely for construction crew members in the work zone.
Start Time: 2025-01-02T00:00:00.000-06:00
End Time: 2026-01-31T00:00:00.000-06:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. EB/WB US380 and cross street intersections will have Alternating Daily AND Nightly lane closures, as Zachry Construction crews conduct roadwork improvements along the highway. Motorists are to follow all Detour signage and watch out safely for construction crew members in the work zone.
Alternating lanes closed. Motorists should expect delays. EB/WB US380 and cross street intersections will have Alternating Daily AND Nightly lane closures, as Zachry Construction crews conduct roadwork improvements along the highway. Motorists are to follow all Detour signage and watch out safely for construction crew members in the work zone.
Start Time: 2025-01-02T00:00:00.000-06:00
End Time: 2026-01-31T00:00:00.000-06:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. EB/WB US380 and cross street intersections will have Alternating Daily AND Nightly lane closures, as Zachry Construction crews conduct roadwork improvements along the highway. Motorists are to follow all Detour signage and watch out safely for construction crew members in the work zone.
Alternating lanes closed. Motorists should expect delays. EB/WB US380 and cross street intersections will have Alternating Daily AND Nightly lane closures, as Zachry Construction crews conduct roadwork improvements along the highway. Motorists are to follow all Detour signage and watch out safely for construction crew members in the work zone.
Start Time: 2024-01-09T07:00:00.000-06:00
End Time: 2026-01-31T00:00:00.000-06:00
map local traffic - MAPRoadwork on E Main St from TX-5/Greenville Ave (8th St/Belt Line Rd) to Grove Rd (8th St/Belt Line Rd).
Roadwork on E Main St from TX-5/Greenville Ave (8th St/Belt Line Rd) to Grove Rd (8th St/Belt Line Rd).
Start Time: 2025-06-14T22:15:30.000-05:00
End Time: 2025-06-17T06:30:33.073-05:00
map local traffic - MAPRoadwork on Custer Pkwy from W Campbell Rd (Custer Rd/FM-2478) to W Renner Rd (Custer Rd/FM-2478).
Roadwork on Custer Pkwy from W Campbell Rd (Custer Rd/FM-2478) to W Renner Rd (Custer Rd/FM-2478).
Start Time: 2025-06-13T17:10:59.000-05:00
End Time: 2025-06-17T06:30:33.073-05:00
map local traffic - MAPRoadwork on 2e 2w Ramp from International Pkwy N to International Pkwy S.
Roadwork on 2e 2w Ramp from International Pkwy N to International Pkwy S.
Start Time: 2025-06-13T10:01:30.000-05:00
End Time: 2025-06-17T06:30:33.073-05:00
map local traffic - MAPRoadwork on W Lovers Ln from Dallas North Tollway (Lovers Ln) to TX-289/Preston Rd (Lovers Ln).
Roadwork on W Lovers Ln from Dallas North Tollway (Lovers Ln) to TX-289/Preston Rd (Lovers Ln).
Start Time: 2025-06-03T13:13:48.000-05:00
End Time: 2025-06-17T06:30:33.073-05:00
map local traffic - MAPRoadwork on Abrams Rd from Forest Ln to I-635/Lyndon B Johnson Fwy.
Roadwork on Abrams Rd from Forest Ln to I-635/Lyndon B Johnson Fwy.
Start Time: 2025-06-01T23:05:00.000-05:00
End Time: 2025-06-17T06:30:33.073-05:00
map local traffic - MAPRoadwork on Esters Rd from Airport Fwy to Rainier St.
Roadwork on Esters Rd from Airport Fwy to Rainier St.
Start Time: 2025-05-29T23:51:00.000-05:00
End Time: 2025-06-17T06:30:33.073-05:00
map local traffic - MAPRoadwork on Main St / FM-720 from TX-289/Preston Rd (W Main St/FM-720) to Frisco St (W Main St/FM-720).
Roadwork on Main St / FM-720 from TX-289/Preston Rd (W Main St/FM-720) to Frisco St (W Main St/FM-720).
Start Time: 2025-05-18T03:20:30.000-05:00
End Time: 2025-06-17T06:30:33.073-05:00
map local traffic - MAPRoadwork on W 1st St from Village Park Ln to S Legacy Dr.
Roadwork on W 1st St from Village Park Ln to S Legacy Dr.
Start Time: 2025-05-17T11:16:31.000-05:00
End Time: 2025-06-17T06:30:33.073-05:00
map local traffic - MAPRoadwork on W Lovers Ln from TX-289/Preston Rd (Lovers Ln) to Dallas North Tollway (Lovers Ln).
Roadwork on W Lovers Ln from TX-289/Preston Rd (Lovers Ln) to Dallas North Tollway (Lovers Ln).
Start Time: 2025-05-13T09:58:00.000-05:00
End Time: 2025-06-17T06:30:33.073-05:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. EB/WB SH114/IH35W-US377: Lanes will have Alternating closures, as Sinacola crews conduct roadwork. Motorists are to follow all detour signage, and watch out safely for construction crew members within the work zone.
Alternating lanes closed. Motorists should expect delays. EB/WB SH114/IH35W-US377: Lanes will have Alternating closures, as Sinacola crews conduct roadwork. Motorists are to follow all detour signage, and watch out safely for construction crew members within the work zone.
Start Time: 2025-05-13T02:56:08.000-05:00
End Time: 2025-12-31T00:00:00.000-06:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. EB/WB SH114/IH35W-US377: Lanes will have Alternating closures, as Sinacola crews conduct roadwork. Motorists are to follow all detour signage, and watch out safely for construction crew members within the work zone.
Alternating lanes closed. Motorists should expect delays. EB/WB SH114/IH35W-US377: Lanes will have Alternating closures, as Sinacola crews conduct roadwork. Motorists are to follow all detour signage, and watch out safely for construction crew members within the work zone.
Start Time: 2025-05-13T02:56:08.000-05:00
End Time: 2025-12-31T00:00:00.000-06:00
map local traffic - MAPRoadwork on TX-354 / N Field St from N Field St/Cedar Springs Rd (TX-354) to Woodall Rodgers Fwy/McKinney Ave (N Field St/TX-354).
Roadwork on TX-354 / N Field St from N Field St/Cedar Springs Rd (TX-354) to Woodall Rodgers Fwy/McKinney Ave (N Field St/TX-354).
Start Time: 2025-05-03T10:00:00.000-05:00
End Time: 2025-09-30T22:00:00.000-05:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. EB/WB US380 and cross street intersections will have Alternating Daily AND Nightly lane closures, as Zachry Construction crews conduct roadwork improvements along the highway. Motorists are to follow all Detour signage and watch out safely for construction crew members in the work zone.
Alternating lanes closed. Motorists should expect delays. EB/WB US380 and cross street intersections will have Alternating Daily AND Nightly lane closures, as Zachry Construction crews conduct roadwork improvements along the highway. Motorists are to follow all Detour signage and watch out safely for construction crew members in the work zone.
Start Time: 2025-04-30T22:45:30.000-05:00
End Time: 2026-01-31T00:00:00.000-06:00
map local traffic - MAPRoadwork on Greenville Ave from Walnut St (S Greenville Ave/TX-5) to Forest Ln (Greenville Ave/TX-5).
Roadwork on Greenville Ave from Walnut St (S Greenville Ave/TX-5) to Forest Ln (Greenville Ave/TX-5).
Start Time: 2025-04-08T10:22:00.000-05:00
End Time: 2025-07-31T09:34:00.000-05:00
map local traffic - MAPRoadwork on Greenville Ave from Forest Ln (Greenville Ave/TX-5) to Walnut St (S Greenville Ave/TX-5).
Roadwork on Greenville Ave from Forest Ln (Greenville Ave/TX-5) to Walnut St (S Greenville Ave/TX-5).
Start Time: 2025-04-08T10:22:00.000-05:00
End Time: 2025-07-31T09:34:00.000-05:00
map local traffic - MAPRoadwork on Legacy Dr from FM-2478/Custer Rd to Independence Pkwy.
Roadwork on Legacy Dr from FM-2478/Custer Rd to Independence Pkwy.
Start Time: 2025-04-07T06:48:00.000-05:00
End Time: 2025-10-16T00:00:00.000-05:00
map local traffic - MAPRoadwork on Legacy Dr from Coit Rd to FM-2478/Custer Rd.
Roadwork on Legacy Dr from Coit Rd to FM-2478/Custer Rd.
Start Time: 2025-04-07T06:46:06.000-05:00
End Time: 2025-10-16T00:00:00.000-05:00
map local traffic - MAPRoadwork on N Field St from TX-354/Harry Hines Blvd (Moody St) to Caroline St (Moody St).
Roadwork on N Field St from TX-354/Harry Hines Blvd (Moody St) to Caroline St (Moody St).
Start Time: 2025-03-25T05:22:10.000-05:00
End Time: 2025-09-30T22:00:00.000-05:00
map local traffic - MAPRoadwork on N Field St from Harry Hines Blvd / Payne St to Woodall Rodgers Fwy S.
Roadwork on N Field St from Harry Hines Blvd / Payne St to Woodall Rodgers Fwy S.
Start Time: 2025-03-25T05:22:10.000-05:00
End Time: 2025-09-30T22:00:00.000-05:00
map local traffic - MAPRoadwork on N Field St from Caroline St to Woodall Rodgers Fwy.
Roadwork on N Field St from Caroline St to Woodall Rodgers Fwy.
Start Time: 2025-03-25T05:22:10.000-05:00
End Time: 2025-09-30T22:00:00.000-05:00
map local traffic - MAPRoadwork on N Field St from Caroline St (Moody St) to TX-354/Harry Hines Blvd (Moody St).
Roadwork on N Field St from Caroline St (Moody St) to TX-354/Harry Hines Blvd (Moody St).
Start Time: 2025-03-25T05:21:57.000-05:00
End Time: 2025-09-30T22:00:00.000-05:00
map local traffic - MAPRoadwork on N Field St from Caroline St to Harry Hines Blvd / Moody St.
Roadwork on N Field St from Caroline St to Harry Hines Blvd / Moody St.
Start Time: 2025-03-25T05:21:57.000-05:00
End Time: 2025-09-30T22:00:00.000-05:00
map local traffic - MAPRoadwork on TX-354 / N Field St from Woodall Rodgers Fwy/McKinney Ave (N Field St/TX-354) to N Field St/Cedar Springs Rd (TX-354).
Roadwork on TX-354 / N Field St from Woodall Rodgers Fwy/McKinney Ave (N Field St/TX-354) to N Field St/Cedar Springs Rd (TX-354).
Start Time: 2025-03-25T05:21:57.000-05:00
End Time: 2025-09-30T22:00:00.000-05:00
map local traffic - MAPRoadwork on N Field St from Woodall Rodgers Fwy to Caroline St.
Roadwork on N Field St from Woodall Rodgers Fwy to Caroline St.
Start Time: 2025-03-25T05:21:57.000-05:00
End Time: 2025-09-30T22:00:00.000-05:00
map local traffic - MAPRoadwork on Skillman St from Royal Ln to I-635.
Roadwork on Skillman St from Royal Ln to I-635.
Start Time: 2024-12-16T03:35:21.000-06:00
End Time: 2025-06-17T06:30:33.073-05:00
map local traffic - MAPRoadwork on W Miller Rd from S 1st St (Miller Rd) to TX-78/S Garland Ave (Miller Rd).
Roadwork on W Miller Rd from S 1st St (Miller Rd) to TX-78/S Garland Ave (Miller Rd).
Start Time: 2024-05-15T13:10:30.000-05:00
End Time: 2025-06-17T06:30:33.073-05:00
map local traffic - MAPRoadwork on Skillman St from I-635 to Royal Ln.
Roadwork on Skillman St from I-635 to Royal Ln.
Start Time: 2024-05-15T12:43:30.000-05:00
End Time: 2025-06-17T06:30:33.073-05:00
map local traffic - MAPRoadwork on Santa Fe Ave from S Beacon St / Graham Ave to S Henderson Ave.
Roadwork on Santa Fe Ave from S Beacon St / Graham Ave to S Henderson Ave.
Start Time: 2025-06-13T23:12:00.000-05:00
End Time: 2025-06-17T06:30:33.073-05:00
map local traffic - MAPRoadwork on Dale Earnhardt Way from Highway 114 to Cleveland Gibbs Rd.
Roadwork on Dale Earnhardt Way from Highway 114 to Cleveland Gibbs Rd.
Start Time: 2025-06-09T19:16:00.000-05:00
End Time: 2025-06-17T06:30:33.073-05:00
map local traffic - MAPRoadwork on Navo Rd from E University Dr to Union Park Blvd E.
Roadwork on Navo Rd from E University Dr to Union Park Blvd E.
Start Time: 2025-05-28T22:44:00.000-05:00
End Time: 2025-06-17T06:30:33.073-05:00
map local traffic - MAPRoadwork on Union Park Blvd E from E University Dr / Navo Rd to Field Xing.
Roadwork on Union Park Blvd E from E University Dr / Navo Rd to Field Xing.
Start Time: 2025-05-28T15:42:11.000-05:00
End Time: 2025-06-17T06:30:33.073-05:00
map local traffic - MAPRoadwork on N Teel Pkwy from Bridges Dr to Avocet Ln.
Roadwork on N Teel Pkwy from Bridges Dr to Avocet Ln.
Start Time: 2025-05-23T14:59:44.000-05:00
End Time: 2025-06-17T06:30:33.073-05:00
map local traffic