Constructions near Search Center
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPThe left lane of northbound Interstate 5 between 236th Street Northeast (milepost 210) and 300th Street Northwest (milepost 214) in Stanwood is closed for I-5 Secret Creek Fish Passage work. Southbound I-5 traffic is on a two-lane bypass road, west of the mainline. Oversized loads are advised of 26-ft lane width limitations on the southbound bypass. Travelers should expect speed and lane reductions during construction.
The left lane of northbound Interstate 5 between 236th Street Northeast (milepost 210) and 300th Street Northwest (milepost 214) in Stanwood is closed for I-5 Secret Creek Fish Passage work. Southbound I-5 traffic is on a two-lane bypass road, west of the mainline. Oversized loads are advised of 26-ft lane width limitations on the southbound bypass. Travelers should expect speed and lane reductions during construction.
Start Time: 2025-06-04T20:24:30.000-07:00
End Time: 2025-06-16T05:06:23.283-07:00
map local traffic