Constructions near I 5 WA exit 232
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPThe left lane of northbound Interstate 5 between 236th Street Northeast (milepost 210) and 300th Street Northwest (milepost 214) in Stanwood is closed for I-5 Secret Creek Fish Passage work. Southbound I-5 traffic is on a two-lane bypass road, west of the mainline. Oversized loads are advised of 26-ft lane width limitations on the southbound bypass. Travelers should expect speed and lane reductions during construction.
The left lane of northbound Interstate 5 between 236th Street Northeast (milepost 210) and 300th Street Northwest (milepost 214) in Stanwood is closed for I-5 Secret Creek Fish Passage work. Southbound I-5 traffic is on a two-lane bypass road, west of the mainline. Oversized loads are advised of 26-ft lane width limitations on the southbound bypass. Travelers should expect speed and lane reductions during construction.
Start Time: 2025-05-31T20:23:30.000-07:00
End Time: 2025-06-18T05:27:06.015-07:00
map local traffic - MAPRoadwork on Cascade Mall Dr from S Burlington Blvd / Gilkey Rd to S Burlington Blvd / Cascade Pl.
Roadwork on Cascade Mall Dr from S Burlington Blvd / Gilkey Rd to S Burlington Blvd / Cascade Pl.
Start Time: 2025-06-17T15:22:14.000-07:00
End Time: 2025-06-18T05:27:06.015-07:00
map local traffic