know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along I-5

Constructions along I-5 in Washington

Click for Real Time Traffic
 
 
type a number or name to filter
  • MAP
    Roadwork on I-5 S from 41st Division Dr/Exit 120 (I-5) to Clark Rd/Exit 119 (I-5).
    Roadwork on I-5 S from 41st Division Dr/Exit 120 (I-5) to Clark Rd/Exit 119 (I-5).
    Start Time: 2025-06-04T14:03:25.000-07:00
    End Time: 2025-06-17T05:52:30.916-07:00
    maplocal trafficlocal services
  • MAP
    The left lane of northbound Interstate 5 between 236th Street Northeast (milepost 210) and 300th Street Northwest (milepost 214) in Stanwood is closed for I-5 Secret Creek Fish Passage work. Southbound I-5 traffic is on a two-lane bypass road, west of the mainline. Oversized loads are advised of 26-ft lane width limitations on the southbound bypass. Travelers should expect speed and lane reductions during construction.
    The left lane of northbound Interstate 5 between 236th Street Northeast (milepost 210) and 300th Street Northwest (milepost 214) in Stanwood is closed for I-5 Secret Creek Fish Passage work. Southbound I-5 traffic is on a two-lane bypass road, west of the mainline. Oversized loads are advised of 26-ft lane width limitations on the southbound bypass. Travelers should expect speed and lane reductions during construction.
    Start Time: 2025-05-31T20:23:30.000-07:00
    End Time: 2025-06-17T05:52:30.916-07:00
    maplocal trafficlocal services
  • MAP
    Roadwork on WA-501 / Pioneer St from Main Ave (Pioneer St/WA-501) to I-5 (Pioneer St/WA-501).
    Roadwork on WA-501 / Pioneer St from Main Ave (Pioneer St/WA-501) to I-5 (Pioneer St/WA-501).
    Start Time: 2025-05-28T02:41:00.000-07:00
    End Time: 2025-06-17T05:52:30.916-07:00
    maplocal trafficlocal services
  • MAP
    Roadwork on WA-501 / Pioneer St from I-5 (Pioneer St/WA-501) to Main Ave (Pioneer St/WA-501).
    Roadwork on WA-501 / Pioneer St from I-5 (Pioneer St/WA-501) to Main Ave (Pioneer St/WA-501).
    Start Time: 2025-05-28T02:41:00.000-07:00
    End Time: 2025-06-17T05:52:30.916-07:00
    maplocal trafficlocal services
  • MAP
    Roadwork on 54th Ave E from Taylor Way (54th Ave) to I-5 (54th Ave).
    Roadwork on 54th Ave E from Taylor Way (54th Ave) to I-5 (54th Ave).
    Start Time: 2025-05-07T09:23:41.000-07:00
    End Time: 2025-06-17T05:52:30.916-07:00
    maplocal trafficlocal services


I-5 Washington constructions near exit

South
~ mi ~ mi 0 mi 0.6 mi 0.54 mi 0.74 mi 0.66 mi 1.35 mi 1.01 mi 1.96 mi 2.11 mi ~ mi 4.68 mi 2.58 mi 4.18 mi 1.63 mi 4.92 mi 2.89 mi 1.63 mi 4.64 mi 2.73 mi 0.89 mi 1.88 mi 3.48 mi 1.81 mi 1.85 mi 2.73 mi ~ mi 4.64 mi 1.99 mi 1.48 mi 2.51 mi 4.96 mi 2.57 mi 1.76 mi 3.72 mi 1.35 mi 1.05 mi 2.5 mi 1.08 mi 5.39 mi ~ mi 6.86 mi 4.03 mi 2 mi 1.47 mi 0.13 mi 1.51 mi 1.23 mi 1.69 mi 0.91 mi 0.75 mi 2.69 mi 2.19 mi 2.52 mi 1.25 mi 1.05 mi 1.84 mi 1.78 mi 0.91 mi 1.03 mi 1.22 mi 1.6 mi 1.39 mi 0.71 mi 1.1 mi 1.63 mi 1.48 mi 1.23 mi 0.92 mi 1.34 mi ~ mi 4.12 mi 1.81 mi 2.95 mi 2.34 mi 2.12 mi 0.94 mi 1.85 mi 0.36 mi 0 mi 1.43 mi 1.08 mi 0.75 mi 3.16 mi 1.45 mi 1.39 mi 0.84 mi 0.37 mi 0.44 mi 0.21 mi 0.99 mi 1.55 mi 0.68 mi 0.47 mi 0.72 mi 1.25 mi 1.04 mi 0.74 mi 1.53 mi 1.59 mi 0.49 mi 1.03 mi 1.42 mi 1.88 mi 1.25 mi 2.49 mi ~ mi 2.81 mi 3.18 mi 0.92 mi 0.43 mi 0.69 mi ~ mi 3.52 mi 0.69 mi 1.63 mi 1.69 mi 3.62 mi ~ mi 2.53 mi 1.63 mi 2.32 mi 2.37 mi 3.5 mi 2.47 mi 1.19 mi 1.26 mi 1.32 mi ~ mi 1.1 mi 1.28 mi 1.03 mi 1.57 mi ~ mi

Nearby city: Bow, WA

3.48 mi ~ mi

Nearby city: Bow, WA

4.4 mi 1.93 mi 3.16 mi 3.85 mi 1.26 mi 0.9 mi 0.72 mi 1.09 mi 1.32 mi 0.58 mi 0.21 mi 0.64 mi 2.47 mi 2.4 mi 0.91 mi 2.39 mi ~ mi 4.21 mi 1.08 mi ~ mi
North







Thank you for using Roadnow

Roadnow US