Constructions near I 77 exit 146
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPBolivar Rd is closed from E 9th St to Prospect Ave E.
Bolivar Rd is closed from E 9th St to Prospect Ave E.
Start Time: 2024-06-19T00:40:20.000-04:00
End Time: 2024-06-21T23:59:00.000-04:00
map local traffic - MAPBolivar Rd is closed from Cleveland to E 9th St.
Bolivar Rd is closed from Cleveland to E 9th St.
Start Time: 2024-06-19T00:40:20.000-04:00
End Time: 2024-06-21T23:59:00.000-04:00
map local traffic - MAPShelburne Rd is closed from Chesterton Rd to Courtland Blvd.
Shelburne Rd is closed from Chesterton Rd to Courtland Blvd.
Start Time: 2024-06-18T12:30:20.000-04:00
End Time: 2024-06-26T23:59:00.000-04:00
map local traffic - MAPRoadwork on I-80 W from OH-44/Exit 193 (I-80) to I-480/OH-14/Exit 187 (I-80).
Roadwork on I-80 W from OH-44/Exit 193 (I-80) to I-480/OH-14/Exit 187 (I-80).
Start Time: 2024-06-03T18:54:00.000-04:00
End Time: 2024-06-19T07:58:50.674-04:00
map local traffic - MAPRoadwork from 3rd Ave / Fuller St to I-76 W.
Roadwork from 3rd Ave / Fuller St to I-76 W.
Start Time: 2024-05-11T08:13:30.000-04:00
End Time: 2024-06-20T23:59:00.000-04:00
map local traffic - MAPI-76 E is closed from OH-619/Wooster Rd/Exit 17 (I-76) to I-277/US-224 (I-76).
I-76 E is closed from OH-619/Wooster Rd/Exit 17 (I-76) to I-277/US-224 (I-76).
Start Time: 2023-09-04T01:15:00.000-04:00
End Time: 2024-06-25T23:59:00.000-04:00
map local traffic - MAPI-77 south ramp to I-277/US 224 westbound The ramp from I-77 southbound to I-277/U.S. 224 westbound is closed through fall 2024. The detour is U.S. 224 eastbound to Kelly Ave. to U.S. 224 westbound. Detour: From 2023-08-28 to 2024-11-22, between 05:00 PM and 06:00 AM, I-76WB to I-277WB
I-77 south ramp to I-277/US 224 westbound The ramp from I-77 southbound to I-277/U.S. 224 westbound is closed through fall 2024. The detour is U.S. 224 eastbound to Kelly Ave. to U.S. 224 westbound. Detour: From 2023-08-28 to 2024-11-22, between 05:00 PM and 06:00 AM, I-76WB to I-277WB
Start Time: 2023-08-28T18:00:00.000-04:00
End Time: 2024-11-22T06:00:00.000-05:00
map local traffic - MAPRoadwork on Bellaire Rd from I-71/W 120th St to W 130th St.
Roadwork on Bellaire Rd from I-71/W 120th St to W 130th St.
Start Time: 2024-06-18T19:46:00.000-04:00
End Time: 2024-06-19T07:58:50.674-04:00
map local traffic - MAPRoadwork on OH-21 / Great Lakes Blvd from OH-585/Wooster Rd (OH-21) to Manchester Ave NW/OH-93 (OH-21).
Roadwork on OH-21 / Great Lakes Blvd from OH-585/Wooster Rd (OH-21) to Manchester Ave NW/OH-93 (OH-21).
Start Time: 2024-06-18T17:46:00.000-04:00
End Time: 2024-06-19T07:58:50.674-04:00
map local traffic - MAPMontrose West Ave is closed from Hollythorn Dr to Copley.
Montrose West Ave is closed from Hollythorn Dr to Copley.
Start Time: 2024-06-18T10:24:44.000-04:00
End Time: 2024-06-25T23:59:00.000-04:00
map local traffic - MAPMontrose West Ave is closed from Copley to Hollythorn Dr.
Montrose West Ave is closed from Copley to Hollythorn Dr.
Start Time: 2024-06-18T10:24:44.000-04:00
End Time: 2024-06-25T23:59:00.000-04:00
map local traffic - MAPFrench St is closed from Columbus Rd / Conrail Railroad to Fall St.
French St is closed from Columbus Rd / Conrail Railroad to Fall St.
Start Time: 2024-06-17T13:24:24.000-04:00
End Time: 2024-06-19T23:59:00.000-04:00
map local traffic - MAPFrench St is closed from Fall St to Columbus Rd / Conrail Railroad.
French St is closed from Fall St to Columbus Rd / Conrail Railroad.
Start Time: 2024-06-17T13:24:24.000-04:00
End Time: 2024-06-19T23:59:00.000-04:00
map local traffic - MAPRoadwork on US-6 E / US-20 E / Euclid Ave from Noble Rd (US-6/Euclid Ave/US-20) to Green Rd (US-6/Euclid Ave/US-20).
Roadwork on US-6 E / US-20 E / Euclid Ave from Noble Rd (US-6/Euclid Ave/US-20) to Green Rd (US-6/Euclid Ave/US-20).
Start Time: 2024-06-11T09:58:30.000-04:00
End Time: 2024-06-19T07:58:50.674-04:00
map local traffic - MAPRoadwork from Chillicothe Rd to Bainbridge.
Roadwork from Chillicothe Rd to Bainbridge.
Start Time: 2024-05-28T01:11:32.000-04:00
End Time: 2024-06-30T23:59:00.000-04:00
map local traffic - MAPRoadwork from Bainbridge to Chillicothe Rd.
Roadwork from Bainbridge to Chillicothe Rd.
Start Time: 2024-05-28T01:11:32.000-04:00
End Time: 2024-06-30T23:59:00.000-04:00
map local traffic - MAPE Pleasant Valley Rd is closed from Canal Rd to OH-21/Brecksville Rd.
E Pleasant Valley Rd is closed from Canal Rd to OH-21/Brecksville Rd.
Start Time: 2024-01-08T10:27:00.000-05:00
End Time: 2024-06-20T23:59:00.000-04:00
map local traffic - MAPRoadwork on Brecksville Rd from OH-176/Wheatley Rd to Everett Rd.
Roadwork on Brecksville Rd from OH-176/Wheatley Rd to Everett Rd.
Start Time: 2024-06-18T18:46:00.000-04:00
End Time: 2024-06-19T07:58:50.674-04:00
map local traffic - MAPRoadwork on Hilliard Blvd from I-90/Westway Dr/Northwest Fwy to Wagar Rd.
Roadwork on Hilliard Blvd from I-90/Westway Dr/Northwest Fwy to Wagar Rd.
Start Time: 2024-06-18T17:46:00.000-04:00
End Time: 2024-06-19T07:58:50.674-04:00
map local traffic - MAPRoadwork on Leatherman Rd / County Hwy-260 from Great Oaks Trl to Blake Rd.
Roadwork on Leatherman Rd / County Hwy-260 from Great Oaks Trl to Blake Rd.
Start Time: 2024-06-17T11:43:30.000-04:00
End Time: 2024-06-19T07:58:50.674-04:00
map local traffic - MAPRoadwork on OH-43 / Aurora Rd from Solon Rd (Aurora Rd/OH-43) to Liberty Rd (Aurora Rd/OH-43).
Roadwork on OH-43 / Aurora Rd from Solon Rd (Aurora Rd/OH-43) to Liberty Rd (Aurora Rd/OH-43).
Start Time: 2024-06-10T17:08:00.000-04:00
End Time: 2024-06-19T07:58:50.674-04:00
map local traffic - MAPNorthboundfield Rd. over Broadway Ave.. Northfield Rd. over Broadway Ave. will be reduced to one lane in each direction beginning Monday, March 25, through mid-November.
Northboundfield Rd. over Broadway Ave.. Northfield Rd. over Broadway Ave. will be reduced to one lane in each direction beginning Monday, March 25, through mid-November.
Start Time: 2024-03-25T01:00:00.000-04:00
End Time: 2024-11-15T23:59:00.000-05:00
map local traffic - MAPSR 10 over Rocky River in both directions. SR 10 (Lorain Ave.) over the Rocky River will be reduced to one lane in each direction beginning Monday, March 18, through mid-November.
SR 10 over Rocky River in both directions. SR 10 (Lorain Ave.) over the Rocky River will be reduced to one lane in each direction beginning Monday, March 18, through mid-November.
Start Time: 2024-03-18T01:00:00.000-04:00
End Time: 2024-11-15T23:59:00.000-05:00
map local traffic - MAPE.140th St. between St. Clair Ave. and Aspenwall Ave. northbound. E.140th St. southbound between St. Clair Ave. and Aspenwall Ave. will be closed beginning on Monday, May 8, through November for resurfacing. Northbound traffic will remain open. •Detour for southbound traffic will utilize E. 152nd St.
E.140th St. between St. Clair Ave. and Aspenwall Ave. northbound. E.140th St. southbound between St. Clair Ave. and Aspenwall Ave. will be closed beginning on Monday, May 8, through November for resurfacing. Northbound traffic will remain open. •Detour for southbound traffic will utilize E. 152nd St.
Start Time: 2023-05-08T01:00:00.000-04:00
End Time: 2024-09-20T00:59:00.000-04:00
map local traffic