Current Constructions
- MAPNYSDOT - Region 9: Roadwork on US 11 both directions between Exit 6 off ramp (Chenango) and Farrell Drive (Chenango) 1 alternate lanes of 2 lanes blocked for deck repairs, and paving to occur from 4/1 through 4/30 during the hours of 7:00 AM to 7:00 PM. This work is weather dependent with no flagger personnel present. All traffic controlled via temporary signal. Started Open Reach. IR# 4999091 D265118
NYSDOT - Region 9: Roadwork on US 11 both directions between Exit 6 off ramp (Chenango) and Farrell Drive (Chenango) 1 alternate lanes of 2 lanes blocked for deck repairs, and paving to occur from 4/1 through 4/30 during the hours of 7:00 AM to 7:00 PM. This work is weather dependent with no flagger personnel present. All traffic controlled via temporary signal. Started Open Reach. IR# 4999091 D265118
Start Time: 2024-04-01T09:02:00.000-04:00
End Time: 2024-04-23T09:01:07.463-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on US 11 both directions between Exit 6 off ramp (Chenango) and Farrell Drive (Chenango) 1 alternate lanes of 2 lanes blocked for deck repairs, and paving to occur from 4/1 through 4/30 during the hours of 7:00 AM to 7:00 PM. This work is weather dependent with no flagger personnel present. All traffic controlled via temporary signal. Started Open Reach. IR# 4999091 D265118
NYSDOT - Region 9: Roadwork on US 11 both directions between Exit 6 off ramp (Chenango) and Farrell Drive (Chenango) 1 alternate lanes of 2 lanes blocked for deck repairs, and paving to occur from 4/1 through 4/30 during the hours of 7:00 AM to 7:00 PM. This work is weather dependent with no flagger personnel present. All traffic controlled via temporary signal. Started Open Reach. IR# 4999091 D265118
Start Time: 2024-04-01T09:02:00.000-04:00
End Time: 2024-04-23T09:01:07.463-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 5/24 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
NYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 5/24 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
Start Time: 2024-04-15T10:01:00.000-04:00
End Time: 2024-04-23T09:01:07.463-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 5/24 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
NYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 5/24 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
Start Time: 2024-04-15T10:01:00.000-04:00
End Time: 2024-04-23T09:01:07.463-04:00
map local traffic