Constructions near I 89 exit 57mm
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPRoadwork on I-89 N from NH-12A/Exit 20 (I-89) to I-91 (I-89).
Roadwork on I-89 N from NH-12A/Exit 20 (I-89) to I-91 (I-89).
Start Time: 2025-04-26T10:59:24.000-04:00
End Time: 2025-06-21T08:23:44.940-04:00
map local traffic - MAPTRAFFIC ALERT: US-4 In Hartford (Quechee Gorge Bridge) alternating one-way traffic for bridge repair controlled with a temporary signal. Construction hours Monday-Friday 6AM-6PM. Pedestrian access under bridge is closed until November 2025. Lane width 13'.
TRAFFIC ALERT: US-4 In Hartford (Quechee Gorge Bridge) alternating one-way traffic for bridge repair controlled with a temporary signal. Construction hours Monday-Friday 6AM-6PM. Pedestrian access under bridge is closed until November 2025. Lane width 13'.
Start Time: 2025-06-18T09:25:49.000-04:00
End Time: 2026-06-26T21:00:00.000-04:00
map local traffic - MAPPomfret Rd is closed from Barnard Rd to Stimets Rd.
Pomfret Rd is closed from Barnard Rd to Stimets Rd.
Start Time: 2025-06-16T13:24:42.000-04:00
End Time: 2025-06-21T08:23:44.941-04:00
map local traffic - MAPRoadwork on Pomfret Rd from School View Dr to Stimets Rd.
Roadwork on Pomfret Rd from School View Dr to Stimets Rd.
Start Time: 2025-06-17T17:22:39.000-04:00
End Time: 2025-06-21T08:23:44.944-04:00
map local traffic - MAPLebanon I-89 SB Rest Area is closed until further notice.
Lebanon I-89 SB Rest Area is closed until further notice.
Start Time: 2025-05-01T00:00:00.000-04:00
End Time: 2025-06-21T08:23:44.944-04:00
map local traffic - MAPI-91 SB in Fairlee at Exit 15, bridge replacement project for Bridge 56S (over Lake Morey Road). Lane closures in the area to aid in the construction of crossovers. Traffic will be diverted to the NB side in Spring 2025. Drive with care in the area.
I-91 SB in Fairlee at Exit 15, bridge replacement project for Bridge 56S (over Lake Morey Road). Lane closures in the area to aid in the construction of crossovers. Traffic will be diverted to the NB side in Spring 2025. Drive with care in the area.
Start Time: 2025-04-28T17:09:04.000-04:00
End Time: 2025-10-17T21:00:00.000-04:00
map local traffic - MAPI-89 NB in Royalton at the bridge over the White River (before Exit 3), Is CLOSED to all traffic for bridge rehabilitation. I-89 northbound traffic will utilize a crossover with a single lane flow of traffic over the I-89 southbound bridge (14-foot lane width maximum) and then returning back to the I-89 northbound barrel. Until further notice. Please go slow through the work zone.
I-89 NB in Royalton at the bridge over the White River (before Exit 3), Is CLOSED to all traffic for bridge rehabilitation. I-89 northbound traffic will utilize a crossover with a single lane flow of traffic over the I-89 southbound bridge (14-foot lane width maximum) and then returning back to the I-89 northbound barrel. Until further notice. Please go slow through the work zone.
Start Time: 2025-03-30T20:47:30.000-04:00
End Time: 2028-09-01T11:00:00.000-04:00
map local traffic