Constructions near I 89 exit 4
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPI-89 NB in Royalton at the bridge over the White River (before Exit 3), Is CLOSED to all traffic for bridge rehabilitation. I-89 northbound traffic will utilize a crossover with a single lane flow of traffic over the I-89 southbound bridge (14-foot lane width maximum) and then returning back to the I-89 northbound barrel. Until further notice. Please go slow through the work zone.
I-89 NB in Royalton at the bridge over the White River (before Exit 3), Is CLOSED to all traffic for bridge rehabilitation. I-89 northbound traffic will utilize a crossover with a single lane flow of traffic over the I-89 southbound bridge (14-foot lane width maximum) and then returning back to the I-89 northbound barrel. Until further notice. Please go slow through the work zone.
Start Time: 2025-03-30T20:47:30.000-04:00
End Time: 2028-09-01T11:00:00.000-04:00
map local traffic - MAPVT-110 from Beacon Hill in Chelsea to Carrier Rd in Washington, paving project. Daily lane closures with alternating one-way traffic. Monday-Saturday 6:00 AM-8:00 PM. Drive with care in the work zone.
VT-110 from Beacon Hill in Chelsea to Carrier Rd in Washington, paving project. Daily lane closures with alternating one-way traffic. Monday-Saturday 6:00 AM-8:00 PM. Drive with care in the work zone.
Start Time: 2025-06-16T11:14:00.000-04:00
End Time: 2025-06-21T23:59:59.000-04:00
map local traffic