Current Constructions
  • MAP
    Stowe St is closed from I-89 N to Waterbury Stowe Rd / Blush Hill Rd.
    Stowe St is closed from I-89 N to Waterbury Stowe Rd / Blush Hill Rd.
    Start Time: 2025-06-19T12:23:17.000-04:00
    End Time: 2025-06-21T08:17:38.718-04:00
    maplocal traffic
  • MAP
    VT-110 from Beacon Hill in Chelsea to Carrier Rd in Washington, paving project. Daily lane closures with alternating one-way traffic. Monday-Saturday 6:00 AM-8:00 PM. Drive with care in the work zone.
    VT-110 from Beacon Hill in Chelsea to Carrier Rd in Washington, paving project. Daily lane closures with alternating one-way traffic. Monday-Saturday 6:00 AM-8:00 PM. Drive with care in the work zone.
    Start Time: 2025-06-16T11:14:00.000-04:00
    End Time: 2025-06-21T23:59:59.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: Small bridge/culvert replacement in four different locations on VT 12 Worcester and Elmore. Existing culvert replacement with a four-sided precast concrete box culvert with associated roadway improvements. Each location will have a temporary single lane bridge with alternating one-way traffic controlled by temporary traffic signals. Flaggers will be used as needed. Lane width restriction 16' at narrowest point.
    TRAFFIC ALERT: Small bridge/culvert replacement in four different locations on VT 12 Worcester and Elmore. Existing culvert replacement with a four-sided precast concrete box culvert with associated roadway improvements. Each location will have a temporary single lane bridge with alternating one-way traffic controlled by temporary traffic signals. Flaggers will be used as needed. Lane width restriction 16' at narrowest point.
    Start Time: 2025-06-16T00:00:00.000-04:00
    End Time: 2025-06-21T23:59:59.000-04:00
    maplocal traffic
  • MAP
    Roadwork on VT-12 / Elmore Rd from VT Route 12 to Worcester.
    Roadwork on VT-12 / Elmore Rd from VT Route 12 to Worcester.
    Start Time: 2025-04-11T21:09:30.000-04:00
    End Time: 2025-06-21T08:17:38.718-04:00
    maplocal traffic