- MAPCT DOT-Newington-HWY-Oper Ctr: bridge replacement on CT-68 both directions between LAKE GROVE AT DURHAM (Durham) and OZICK DR (Durham), Continuous Monday November 4th, 2024 12:00 AM thru Friday September 19th, 2025 11:59 PM All lanes open
CT DOT-Newington-HWY-Oper Ctr: bridge replacement on CT-68 both directions between LAKE GROVE AT DURHAM (Durham) and OZICK DR (Durham), Continuous Monday November 4th, 2024 12:00 AM thru Friday September 19th, 2025 11:59 PM All lanes open
Start Time: 2025-06-16T04:29:30.000-04:00
End Time: 2025-09-19T23:59:00.000-04:00
map local traffic - MAPRoadwork on CT-72 W from CT-372/New Britain Ave (CT-72) to End of Freeway (CT-72).
Roadwork on CT-72 W from CT-372/New Britain Ave (CT-72) to End of Freeway (CT-72).
Start Time: 2025-05-02T13:16:20.000-04:00
End Time: 2025-06-16T08:06:55.278-04:00
map local traffic - MAPRoadwork on CT-140 / Crystal Lake Rd from CT-83/Somers Rd (Maple St/Crystal Lake Rd/CT-140) to Burbank Rd (Crystal Lake Rd/CT-140).
Roadwork on CT-140 / Crystal Lake Rd from CT-83/Somers Rd (Maple St/Crystal Lake Rd/CT-140) to Burbank Rd (Crystal Lake Rd/CT-140).
Start Time: 2025-06-11T23:10:00.000-04:00
End Time: 2025-06-16T08:06:55.278-04:00
map local traffic - MAPRoad rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed
Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed
Start Time: 2025-06-11T08:06:05.000-04:00
End Time: 2025-06-16T22:00:00.000-04:00
map local traffic - MAPPaving operations and signal repair on WATERSIDE DR both directions between US-6 (Farmington) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone., Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open
Paving operations and signal repair on WATERSIDE DR both directions between US-6 (Farmington) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone., Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open
Start Time: 2025-04-21T09:00:03.000-04:00
End Time: 2026-08-05T03:59:00.000-04:00
map local traffic - MAPPaving operations on CT-66 eastbound between CAMP ST (Middletown) and westbound WASHINGTON ST at CT-17 (Middletown) There will be various lane closures. Traffic control signing patterns, cones and truck mounted attenuators will be utilized to guide motorists through the work zone. No work will be performed the day before or day after all State recognized holidays., Continuous Sunday April 6th, 2025 08:00 PM thru Friday November 7th, 2025 06:00 AM All lanes open
Paving operations on CT-66 eastbound between CAMP ST (Middletown) and westbound WASHINGTON ST at CT-17 (Middletown) There will be various lane closures. Traffic control signing patterns, cones and truck mounted attenuators will be utilized to guide motorists through the work zone. No work will be performed the day before or day after all State recognized holidays., Continuous Sunday April 6th, 2025 08:00 PM thru Friday November 7th, 2025 06:00 AM All lanes open
Start Time: 2025-04-06T20:00:00.000-04:00
End Time: 2025-11-08T04:59:00.000-05:00
map local traffic - MAPPaving operations on CT-17 both directions between RANDOLPH RD (Middletown) and LOVELAND ST (Middletown) There will be various lane closures. Traffic control signing patterns, cones and truck mounted attenuators will be utilized to guide motorists through the work zone. No work will be performed the day before or day after all State recognized holidays., Continuous Sunday April 6th, 2025 08:00 PM thru Friday November 7th, 2025 06:00 AM All lanes open
Paving operations on CT-17 both directions between RANDOLPH RD (Middletown) and LOVELAND ST (Middletown) There will be various lane closures. Traffic control signing patterns, cones and truck mounted attenuators will be utilized to guide motorists through the work zone. No work will be performed the day before or day after all State recognized holidays., Continuous Sunday April 6th, 2025 08:00 PM thru Friday November 7th, 2025 06:00 AM All lanes open
Start Time: 2025-04-06T20:00:00.000-04:00
End Time: 2025-11-08T04:59:00.000-05:00
map local traffic - MAPTraffic shift on CT-82 both directions between CT-154 (Haddam) and CT-82 (Haddam) shift traffic on the Route 82 connector to the southeast and reduce the roadway to 1 lane in each direction at the intersection of Route 154., Continuous Friday June 21st, 2024 12:00 AM thru Sunday November 2nd, 2025 11:59 PM All lanes open
Traffic shift on CT-82 both directions between CT-154 (Haddam) and CT-82 (Haddam) shift traffic on the Route 82 connector to the southeast and reduce the roadway to 1 lane in each direction at the intersection of Route 154., Continuous Friday June 21st, 2024 12:00 AM thru Sunday November 2nd, 2025 11:59 PM All lanes open
Start Time: 2024-06-21T00:00:00.000-04:00
End Time: 2025-11-03T04:59:00.000-05:00
map local traffic - MAPCT DOT-Newington-HWY-Oper Ctr: construction on CT-154 both directions between CT-82 (Haddam) and CT-82 at CT-82 (Haddam) motorists should expect to travel on a gravel roadway during this time, Continuous Monday September 9th, 2024 12:00 AM thru Sunday November 2nd, 2025 11:59 PM All lanes open
CT DOT-Newington-HWY-Oper Ctr: construction on CT-154 both directions between CT-82 (Haddam) and CT-82 at CT-82 (Haddam) motorists should expect to travel on a gravel roadway during this time, Continuous Monday September 9th, 2024 12:00 AM thru Sunday November 2nd, 2025 11:59 PM All lanes open
Start Time: 2024-06-21T00:00:00.000-04:00
End Time: 2025-11-02T23:59:00.000-05:00