know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along I-91

Constructions near I 91 exit 13

      
       UPDATE NOW

click anywhere on map to find more Constructions

Click for Real Time Traffic
 
 

Current Constructions
  • MAP
    Roadwork on I-89 N from NH-12A/Exit 20 (I-89) to I-91 (I-89).
    Roadwork on I-89 N from NH-12A/Exit 20 (I-89) to I-91 (I-89).
    Start Time: 2025-04-26T10:59:24.000-04:00
    End Time: 2025-06-18T06:04:35.194-04:00
    maplocal traffic
  • MAP
    Roadwork on Pomfret Rd from Stimets Rd to School View Dr.
    Roadwork on Pomfret Rd from Stimets Rd to School View Dr.
    Start Time: 2025-06-17T19:23:22.000-04:00
    End Time: 2025-06-18T06:04:35.194-04:00
    maplocal traffic
  • MAP
    Pomfret Rd is closed from Barnard Rd to Stimets Rd.
    Pomfret Rd is closed from Barnard Rd to Stimets Rd.
    Start Time: 2025-06-16T13:24:42.000-04:00
    End Time: 2025-06-18T06:04:35.194-04:00
    maplocal traffic
  • MAP
    Roadwork on Pomfret Rd from School View Dr to Stimets Rd.
    Roadwork on Pomfret Rd from School View Dr to Stimets Rd.
    Start Time: 2025-06-17T17:22:39.000-04:00
    End Time: 2025-06-18T06:04:35.194-04:00
    maplocal traffic
  • MAP
    Lebanon I-89 SB Rest Area is closed until further notice.
    Lebanon I-89 SB Rest Area is closed until further notice.
    Start Time: 2025-05-01T00:00:00.000-04:00
    End Time: 2025-06-18T06:04:35.194-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: Bridge maintenance on I-91 NB & SB Approximately 1.1 miles north of Exit 12 in Wilder. Removal of the existing bridge pavement, concrete repairs to the deck, installing membrane and re-paving the deck with associated approach work. Both I-91 North and Southbound will be reduced to one-lane for the duration of the project. Flaggers will be used as needed to reduce US-5 under the bridge to one-lane during working hours only.
    TRAFFIC ALERT: Bridge maintenance on I-91 NB & SB Approximately 1.1 miles north of Exit 12 in Wilder. Removal of the existing bridge pavement, concrete repairs to the deck, installing membrane and re-paving the deck with associated approach work. Both I-91 North and Southbound will be reduced to one-lane for the duration of the project. Flaggers will be used as needed to reduce US-5 under the bridge to one-lane during working hours only.
    Start Time: 2025-06-17T21:23:30.000-04:00
    End Time: 2025-06-20T23:59:59.000-04:00
    maplocal traffic
  • MAP
    I-91 SB in Fairlee at Exit 15, bridge replacement project for Bridge 56S (over Lake Morey Road). Lane closures in the area to aid in the construction of crossovers. Traffic will be diverted to the NB side in Spring 2025. Drive with care in the area.
    I-91 SB in Fairlee at Exit 15, bridge replacement project for Bridge 56S (over Lake Morey Road). Lane closures in the area to aid in the construction of crossovers. Traffic will be diverted to the NB side in Spring 2025. Drive with care in the area.
    Start Time: 2025-04-28T17:09:04.000-04:00
    End Time: 2025-10-17T21:00:00.000-04:00
    maplocal traffic
  • MAP
    I-89 NB in Royalton at the bridge over the White River (before Exit 3), Is CLOSED to all traffic for bridge rehabilitation. I-89 northbound traffic will utilize a crossover with a single lane flow of traffic over the I-89 southbound bridge (14-foot lane width maximum) and then returning back to the I-89 northbound barrel. Until further notice. Please go slow through the work zone.
    I-89 NB in Royalton at the bridge over the White River (before Exit 3), Is CLOSED to all traffic for bridge rehabilitation. I-89 northbound traffic will utilize a crossover with a single lane flow of traffic over the I-89 southbound bridge (14-foot lane width maximum) and then returning back to the I-89 northbound barrel. Until further notice. Please go slow through the work zone.
    Start Time: 2025-03-30T20:47:30.000-04:00
    End Time: 2028-09-01T11:00:00.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: Sharon - Reconstruction and expansion of the existing Park and Ride facility, pavement overlay, new sidewalk, pavement markings, new signage, new drainage, landscaping, lighting, new bus shelter, and other incidental items. The Sharon ride will be closed for construction. Park and ride Traffic will be detoured to the Royalton Park and ride at exit 3.
    TRAFFIC ALERT: Sharon - Reconstruction and expansion of the existing Park and Ride facility, pavement overlay, new sidewalk, pavement markings, new signage, new drainage, landscaping, lighting, new bus shelter, and other incidental items. The Sharon ride will be closed for construction. Park and ride Traffic will be detoured to the Royalton Park and ride at exit 3.
    Start Time: 2025-06-16T00:00:00.000-04:00
    End Time: 2025-06-20T23:59:59.000-04:00
    maplocal traffic
  • MAP
    Roadwork on North Rd from Stack Pole Rd to Stearns Dr.
    Roadwork on North Rd from Stack Pole Rd to Stearns Dr.
    Start Time: 2025-06-12T21:12:00.000-04:00
    End Time: 2025-06-18T05:58:30.104-04:00
    maplocal traffic
  • MAP
    Roadwork on North Rd from Stearns Dr to Stack Pole Rd.
    Roadwork on North Rd from Stearns Dr to Stack Pole Rd.
    Start Time: 2025-06-09T07:45:49.000-04:00
    End Time: 2025-06-18T05:58:30.104-04:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US