Current Constructions
- MAPRoadwork on NH-135 / Monroe Rd from Central St / S Court St to Abbot Ave.
Roadwork on NH-135 / Monroe Rd from Central St / S Court St to Abbot Ave.
Start Time: 2025-05-29T07:19:20.000-04:00
End Time: 2025-06-15T08:26:09.164-04:00
map local traffic - MAPLong Term Construction Project: Haverhill - Bath, NH-135 bridge over the Ammonoosuc River, one lane alternating traffic with Signals at each end of bridge. (Br. No. 071/063). Proj #43445 https://maps.dot.nh.gov/reports/plan-inventory/
Long Term Construction Project: Haverhill - Bath, NH-135 bridge over the Ammonoosuc River, one lane alternating traffic with Signals at each end of bridge. (Br. No. 071/063). Proj #43445 https://maps.dot.nh.gov/reports/plan-inventory/
Start Time: 2025-04-24T09:38:36.000-04:00
End Time: 2025-10-10T10:30:00.000-04:00
map local traffic - MAPLong Term Construction Project: Benton NH-25 at Learned Farm Rd. One Lane Alternating controlled by traffic lights with a 14 foot width lane restriction.
Long Term Construction Project: Benton NH-25 at Learned Farm Rd. One Lane Alternating controlled by traffic lights with a 14 foot width lane restriction.
Start Time: 2024-12-09T15:46:11.000-05:00
End Time: 2025-08-29T15:00:00.000-04:00
map local traffic - MAPLong Term Construction Project: Benton NH-25 at Learned Farm Rd. One Lane Alternating controlled by traffic lights with a 14 foot width lane restriction.
Long Term Construction Project: Benton NH-25 at Learned Farm Rd. One Lane Alternating controlled by traffic lights with a 14 foot width lane restriction.
Start Time: 2024-12-09T15:46:11.000-05:00
End Time: 2025-08-29T15:00:00.000-04:00
map local traffic - MAPWaterford IM 093-1(43) - Work to be performed under this project includes resurfacing existing lane and parking areas with bituminous concrete pavement, curbing, new signs and other related items
Waterford IM 093-1(43) - Work to be performed under this project includes resurfacing existing lane and parking areas with bituminous concrete pavement, curbing, new signs and other related items
Start Time: 2025-04-21T07:00:00.000-04:00
End Time: 2025-06-27T16:00:00.000-04:00
map local traffic