- MAPThe following road construction project is in progress: road construction with reduced speed limit, two way traffic, and width limit 16 ft until further notice. Two-way traffic configuration in the westbound lanes using crossovers, reduced speed limit, and varying width restrictions due to road work on I-94 from mile post 177.9 to 184.7, between Terry and Fallon. Eastbound width restriction is 16 feet, and the westbound width restriction is 22 feet. Vehicles affected by these restrictions must use an alternate route. Oversized load piloting is not available due to construction location.
The following road construction project is in progress: road construction with reduced speed limit, two way traffic, and width limit 16 ft until further notice. Two-way traffic configuration in the westbound lanes using crossovers, reduced speed limit, and varying width restrictions due to road work on I-94 from mile post 177.9 to 184.7, between Terry and Fallon. Eastbound width restriction is 16 feet, and the westbound width restriction is 22 feet. Vehicles affected by these restrictions must use an alternate route. Oversized load piloting is not available due to construction location.
Start Time: 2024-04-05T19:02:00.000-06:00
End Time: 2024-04-23T07:00:35.009-06:00
map local traffic - MAPThe following road construction project is in progress: road construction with reduced speed limit, two way traffic, and width limit 16 ft until further notice. Two-way traffic configuration in the westbound lanes using crossovers, reduced speed limit, and varying width restrictions due to road work on I-94 from mile post 177.9 to 184.7, between Terry and Fallon. Eastbound width restriction is 16 feet, and the westbound width restriction is 22 feet. Vehicles affected by these restrictions must use an alternate route. Oversized load piloting is not available due to construction location.
The following road construction project is in progress: road construction with reduced speed limit, two way traffic, and width limit 16 ft until further notice. Two-way traffic configuration in the westbound lanes using crossovers, reduced speed limit, and varying width restrictions due to road work on I-94 from mile post 177.9 to 184.7, between Terry and Fallon. Eastbound width restriction is 16 feet, and the westbound width restriction is 22 feet. Vehicles affected by these restrictions must use an alternate route. Oversized load piloting is not available due to construction location.
Start Time: 2024-04-03T23:57:00.000-06:00
End Time: 2024-04-23T07:00:35.009-06:00