know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along I-94

The following road construction project is in progress: road construction with reduced speed limit, two way traffic, and width limit 16 ft until further notice. Two way traffic configuration in the westbound lanes using crossovers, reduced speed limit, and varying width restrictions due to road work on I 94 from mile post 177.9 to 184.7, between Terry and Fallon. Eastbound width restriction is 16 feet, and the westbound width restriction is 22 feet. Vehicles affected by these restrictions must use an alternate route. Oversized load piloting is not available due to construction location.

 

Cities close to The Following Road Construction Project Is In Progress: Road Construction With Reduced Speed Limit, Two Way Traffic, And Width Limit 16 Ft Until Further Notice. Two-way Traffic Configuration In The Westbound Lanes Using Crossovers, Reduced Speed Limit, And Varying Width Restrictions Due To Road Work On I-94 From Mile Post 177.9 To 184.7, Between Terry And Fallon. Eastbound Width Restriction Is 16 Feet, And The Westbound Width Restriction Is 22 Feet. Vehicles Affected By These Restrictions Must Use An Alternate Route. Oversized Load Piloting Is Not Available Due To Construction Location.


Interstate highway exits close to The Following Road Construction Project Is In Progress: Road Construction With Reduced Speed Limit, Two Way Traffic, And Width Limit 16 Ft Until Further Notice. Two-way Traffic Configuration In The Westbound Lanes Using Crossovers, Reduced Speed Limit, And Varying Width Restrictions Due To Road Work On I-94 From Mile Post 177.9 To 184.7, Between Terry And Fallon. Eastbound Width Restriction Is 16 Feet, And The Westbound Width Restriction Is 22 Feet. Vehicles Affected By These Restrictions Must Use An Alternate Route. Oversized Load Piloting Is Not Available Due To Construction Location.


Interstate highways close to The Following Road Construction Project Is In Progress: Road Construction With Reduced Speed Limit, Two Way Traffic, And Width Limit 16 Ft Until Further Notice. Two-way Traffic Configuration In The Westbound Lanes Using Crossovers, Reduced Speed Limit, And Varying Width Restrictions Due To Road Work On I-94 From Mile Post 177.9 To 184.7, Between Terry And Fallon. Eastbound Width Restriction Is 16 Feet, And The Westbound Width Restriction Is 22 Feet. Vehicles Affected By These Restrictions Must Use An Alternate Route. Oversized Load Piloting Is Not Available Due To Construction Location.


State roads close to The Following Road Construction Project Is In Progress: Road Construction With Reduced Speed Limit, Two Way Traffic, And Width Limit 16 Ft Until Further Notice. Two-way Traffic Configuration In The Westbound Lanes Using Crossovers, Reduced Speed Limit, And Varying Width Restrictions Due To Road Work On I-94 From Mile Post 177.9 To 184.7, Between Terry And Fallon. Eastbound Width Restriction Is 16 Feet, And The Westbound Width Restriction Is 22 Feet. Vehicles Affected By These Restrictions Must Use An Alternate Route. Oversized Load Piloting Is Not Available Due To Construction Location.






Thank you for using Roadnow

Roadnow US