The Following Road Construction Project Is In Progress: Road Construction With Delays, Reduced Speed Limit, Two Way Traffic, And Width Limit 15 Ft Until Further Notice. Two Way Traffic Configuration In The Eastbound Lanes Using Crossovers, Reduced Speed Limit, And 15 Foot Width Restriction Due To Road Work On I 94 From Mile Post 14 To 21, East Of Billings. Vehicles Affected By These Restrictions Must Use An Alternate Route. Traffic
2024-05-07
Roadnow