    The contractor is closing a portion of the ramp leading into US-13 North. Traffic can still continue down the ramp to I-295 South. Follow detour signs.
    The contractor is closing a portion of the ramp leading into US-13 North. Traffic can still continue down the ramp to I-295 South. Follow detour signs.
    Start Time: 2025-06-20T05:53:30.000-04:00
    End Time: 2025-12-02T14:05:00.000-05:00
    maplocal traffic
  • MAP
    As part of the I-5986B widening project, motorists can expect narrowed lanes and barrier walls along the shoulder of I-95 between Exit 71 (Long Branch Road) and Exit 81 (I-40).
    As part of the I-5986B widening project, motorists can expect narrowed lanes and barrier walls along the shoulder of I-95 between Exit 71 (Long Branch Road) and Exit 81 (I-40).
    Start Time: 2025-06-17T18:24:16.000-04:00
    End Time: 2026-10-28T11:35:00.000-04:00
    maplocal traffic
  • MAP
    As part of the I-5986B widening project, motorists can expect narrowed lanes and barrier walls along the shoulder of I-95 between Exit 71 (Long Branch Road) and Exit 81 (I-40).
    As part of the I-5986B widening project, motorists can expect narrowed lanes and barrier walls along the shoulder of I-95 between Exit 71 (Long Branch Road) and Exit 81 (I-40).
    Start Time: 2025-06-17T08:22:09.000-04:00
    End Time: 2026-10-28T11:35:00.000-04:00
    maplocal traffic
  • MAP
    As part of the I-5986B widening project, motorists can expect narrowed lanes and barrier walls along the shoulder of I-95 between Exit 71 (Long Branch Road) and Exit 81 (I-40).
    As part of the I-5986B widening project, motorists can expect narrowed lanes and barrier walls along the shoulder of I-95 between Exit 71 (Long Branch Road) and Exit 81 (I-40).
    Start Time: 2025-04-30T07:41:07.000-04:00
    End Time: 2026-10-28T11:35:00.000-04:00
    maplocal traffic
  • MAP
    All ramps and access to Murphy Rd are closed due to the NB lanes being shifted  to the SB side. 
    All ramps and access to Murphy Rd are closed due to the NB lanes being shifted  to the SB side. 
    Start Time: 2025-04-16T09:06:15.000-04:00
    End Time: 2025-08-31T17:00:00.000-04:00
    maplocal traffic
  • MAP
    All ramps and access to Murphy Rd are closed due to the NB lanes being shifted  to the SB side. 
    All ramps and access to Murphy Rd are closed due to the NB lanes being shifted  to the SB side. 
    Start Time: 2022-11-04T00:00:00.000-04:00
    End Time: 2025-08-31T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Roadwork on Rosehill Rd from Tamarack Dr to Dowfield Dr.
    Roadwork on Rosehill Rd from Tamarack Dr to Dowfield Dr.
    Start Time: 2025-06-20T23:50:00.000-04:00
    End Time: 2025-06-21T08:15:51.797-04:00
    maplocal traffic
  • MAP
    Roadwork on Rosehill Rd from Dowfield Dr to Tamarack Dr.
    Roadwork on Rosehill Rd from Dowfield Dr to Tamarack Dr.
    Start Time: 2025-06-20T22:54:32.000-04:00
    End Time: 2025-06-21T08:15:51.797-04:00
    maplocal traffic
  • MAP
    The exit and entrance ramp to and from Murphy Rd is closed.
    The exit and entrance ramp to and from Murphy Rd is closed.
    Start Time: 2025-06-20T13:49:15.000-04:00
    End Time: 2025-08-31T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Roadwork on Pembroke Ln from Goldsboro Rd to I-95 N.
    Roadwork on Pembroke Ln from Goldsboro Rd to I-95 N.
    Start Time: 2025-06-19T21:24:00.000-04:00
    End Time: 2025-06-21T08:15:51.797-04:00
    maplocal traffic
  • MAP
    Roadwork on Pembroke Ln from I-95 N to Goldsboro Rd.
    Roadwork on Pembroke Ln from I-95 N to Goldsboro Rd.
    Start Time: 2025-06-17T23:54:30.000-04:00
    End Time: 2025-06-21T08:15:51.797-04:00
    maplocal traffic
  • MAP
    Bridge pipe maintenance due to pipe failure.
    Bridge pipe maintenance due to pipe failure.
    Start Time: 2025-06-09T15:21:03.000-04:00
    End Time: 2025-08-15T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Bridge pipe maintenance due to pipe failure.
    Bridge pipe maintenance due to pipe failure.
    Start Time: 2025-06-09T15:18:34.000-04:00
    End Time: 2025-08-15T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Roadwork on US-13 N / Goldsboro Rd from I-95 (US-13) to NC-82/Herb Farm Rd (US-13).
    Roadwork on US-13 N / Goldsboro Rd from I-95 (US-13) to NC-82/Herb Farm Rd (US-13).
    Start Time: 2025-05-07T09:32:01.000-04:00
    End Time: 2025-06-21T08:15:51.797-04:00
    maplocal traffic
  • MAP
    Roadwork on US-13 S / Goldsboro Rd from NC-82/Herb Farm Rd (US-13) to I-95 (US-13).
    Roadwork on US-13 S / Goldsboro Rd from NC-82/Herb Farm Rd (US-13) to I-95 (US-13).
    Start Time: 2025-05-07T07:31:34.000-04:00
    End Time: 2025-06-21T08:15:51.797-04:00
    maplocal traffic
  • MAP
    Due to the I-95 widening project, this portion of Interstate Drive will be permanently closed as the SB on-ramp will be realigned.
    Due to the I-95 widening project, this portion of Interstate Drive will be permanently closed as the SB on-ramp will be realigned.
    Start Time: 2025-04-30T22:40:00.000-04:00
    End Time: 2025-12-04T13:44:00.000-05:00
    maplocal traffic
  • MAP
    As part of the I-5986B widening project, motorists can expect narrowed lanes and barrier walls along the shoulder of I-95 between Exit 71 (Long Branch Road) and Exit 81 (I-40).
    As part of the I-5986B widening project, motorists can expect narrowed lanes and barrier walls along the shoulder of I-95 between Exit 71 (Long Branch Road) and Exit 81 (I-40).
    Start Time: 2025-04-29T05:36:37.000-04:00
    End Time: 2026-10-28T11:35:00.000-04:00
    maplocal traffic
  • MAP
    As part of the I-5986B widening project, motorists can expect narrowed lanes and barrier walls along the shoulder of I-95 between Exit 71 (Long Branch Road) and Exit 81 (I-40).
    As part of the I-5986B widening project, motorists can expect narrowed lanes and barrier walls along the shoulder of I-95 between Exit 71 (Long Branch Road) and Exit 81 (I-40).
    Start Time: 2025-04-29T05:36:37.000-04:00
    End Time: 2026-10-28T11:35:00.000-04:00
    maplocal traffic
  • MAP
    Road closed permanently. The future NC-55 bypass will eventually intersect Ennis Rd. 
    Road closed permanently. The future NC-55 bypass will eventually intersect Ennis Rd. 
    Start Time: 2024-12-30T08:22:00.000-05:00
    End Time: 2025-12-30T08:22:00.000-05:00
    maplocal traffic
  • MAP
    Road closed permanently. The future NC-55 bypass will eventually intersect Ennis Rd. 
    Road closed permanently. The future NC-55 bypass will eventually intersect Ennis Rd. 
    Start Time: 2024-12-30T08:22:00.000-05:00
    End Time: 2025-12-30T08:22:00.000-05:00
    maplocal traffic
  • MAP
    Road closed permanently to through traffic.
    Road closed permanently to through traffic.
    Start Time: 2024-11-27T08:04:00.000-05:00
    End Time: 2028-06-01T09:04:00.000-04:00
    maplocal traffic
  • MAP
    Road closed permanently to through traffic.
    Road closed permanently to through traffic.
    Start Time: 2024-11-27T08:04:00.000-05:00
    End Time: 2028-06-01T09:04:00.000-04:00
    maplocal traffic
  • MAP
    DR13 will be closed for realignment construction.
    DR13 will be closed for realignment construction.
    Start Time: 2024-06-12T12:01:43.000-04:00
    End Time: 2027-08-14T16:44:00.000-04:00
    maplocal traffic
  • MAP
    DR13 will be closed for realignment construction.
    DR13 will be closed for realignment construction.
    Start Time: 2024-06-12T07:00:00.000-04:00
    End Time: 2027-08-14T16:44:00.000-04:00
    maplocal traffic
  • MAP
    As part of the I-5986B widening project, motorists can expect narrowed lanes and barrier walls along the shoulder of I-95 between Exit 71 (Long Branch Road) and Exit 81 (I-40).
    As part of the I-5986B widening project, motorists can expect narrowed lanes and barrier walls along the shoulder of I-95 between Exit 71 (Long Branch Road) and Exit 81 (I-40).
    Start Time: 2022-12-09T10:35:00.000-05:00
    End Time: 2026-10-28T11:35:00.000-04:00
    maplocal traffic
  • MAP
    As part of the I-5986B widening project, motorists can expect narrowed lanes and barrier walls along the shoulder of I-95 between Exit 71 (Long Branch Road) and Exit 81 (I-40).
    As part of the I-5986B widening project, motorists can expect narrowed lanes and barrier walls along the shoulder of I-95 between Exit 71 (Long Branch Road) and Exit 81 (I-40).
    Start Time: 2025-04-29T05:36:37.000-04:00
    End Time: 2026-10-28T11:35:00.000-04:00
    maplocal traffic
  • MAP
    As part of the I-5986B widening project, motorists can expect narrowed lanes and barrier walls along the shoulder of I-95 between Exit 71 (Long Branch Road) and Exit 81 (I-40).
    As part of the I-5986B widening project, motorists can expect narrowed lanes and barrier walls along the shoulder of I-95 between Exit 71 (Long Branch Road) and Exit 81 (I-40).
    Start Time: 2022-12-09T10:35:00.000-05:00
    End Time: 2026-10-28T11:35:00.000-04:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US