Constructions near Search Center
2025-06-20
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPCT DOT-Newington-HWY-Oper Ctr: bridge replacement on CT-68 both directions between LAKE GROVE AT DURHAM (Durham) and OZICK DR (Durham), Continuous Monday November 4th, 2024 12:00 AM thru Friday September 19th, 2025 11:59 PM All lanes open
CT DOT-Newington-HWY-Oper Ctr: bridge replacement on CT-68 both directions between LAKE GROVE AT DURHAM (Durham) and OZICK DR (Durham), Continuous Monday November 4th, 2024 12:00 AM thru Friday September 19th, 2025 11:59 PM All lanes open
Start Time: 2025-06-17T08:19:11.000-04:00
End Time: 2025-09-19T23:59:00.000-04:00
map • local traffic