Constructions near Junction at Burton Rd NW
2024-06-17
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAP3rd St NE is closed from Juniper St NE to Peachtree St NE.
3rd St NE is closed from Juniper St NE to Peachtree St NE.
Start Time: 2024-06-17T04:09:25.000-05:00
End Time: 2024-06-19T22:59:00.000-05:00
map local traffic - MAPWashita Ave NE is closed at N Highland Ave NE.
Washita Ave NE is closed at N Highland Ave NE.
Start Time: 2024-06-17T03:51:23.000-05:00
End Time: 2024-06-19T22:59:00.000-05:00
map local traffic - MAPAlbion Ave NE is closed at N Highland Ave NE.
Albion Ave NE is closed at N Highland Ave NE.
Start Time: 2024-06-17T03:51:23.000-05:00
End Time: 2024-06-19T22:59:00.000-05:00
map local traffic - MAPBuckhead Loop NE is closed at Tower Place Dr NE.
Buckhead Loop NE is closed at Tower Place Dr NE.
Start Time: 2024-06-17T03:31:50.000-05:00
End Time: 2024-06-19T22:59:00.000-05:00
map local traffic - MAPRhodes St NW is closed from Electric Ave NW to Northside Dr NW.
Rhodes St NW is closed from Electric Ave NW to Northside Dr NW.
Start Time: 2024-06-17T02:54:12.000-05:00
End Time: 2024-06-19T22:59:00.000-05:00
map local traffic - MAPNelson St SW is closed from Ted Turner Dr SW to Forsyth St SW.
Nelson St SW is closed from Ted Turner Dr SW to Forsyth St SW.
Start Time: 2024-06-17T01:59:47.000-05:00
End Time: 2024-06-19T22:59:00.000-05:00
map local traffic - MAPRoadwork from Atlanta to Bellemeade Ave NW.
Roadwork from Atlanta to Bellemeade Ave NW.
Start Time: 2024-06-16T22:56:49.000-05:00
End Time: 2024-06-18T22:59:00.000-05:00
map local traffic - MAPRoadwork from Bellemeade Ave NW to Atlanta.
Roadwork from Bellemeade Ave NW to Atlanta.
Start Time: 2024-06-16T22:56:49.000-05:00
End Time: 2024-06-18T22:59:00.000-05:00
map local traffic - MAPRoad construction on SR 42 both directions at W DRUID HILLS DR. All lanes closed.
Road construction on SR 42 both directions at W DRUID HILLS DR. All lanes closed.
Start Time: 2024-04-26T20:00:00.000-05:00
End Time: 2024-07-25T20:30:00.000-05:00
map local traffic - MAPRoad construction on SR 42 both directions at W DRUID HILLS DR. All lanes closed.
Road construction on SR 42 both directions at W DRUID HILLS DR. All lanes closed.
Start Time: 2024-04-26T18:00:00.000-05:00
End Time: 2024-07-25T20:30:00.000-05:00
map local traffic - MAP6th St NE is closed from W Peachtree St NW / Biltmore Pl NW to Juniper St NE.
6th St NE is closed from W Peachtree St NW / Biltmore Pl NW to Juniper St NE.
Start Time: 2024-06-16T22:33:50.000-05:00
End Time: 2024-06-19T22:59:00.000-05:00
map local traffic - MAP6th St NE is closed from Juniper St NE to Peachtree St NE.
6th St NE is closed from Juniper St NE to Peachtree St NE.
Start Time: 2024-06-16T21:44:09.000-05:00
End Time: 2024-06-23T22:59:00.000-05:00
map local traffic - MAPCityview Dr SW is closed from I-20/Riverside Pkwy SW (Six Flags Dr SW) to Six Flags Pkwy SW (Six Flags Dr SW).
Cityview Dr SW is closed from I-20/Riverside Pkwy SW (Six Flags Dr SW) to Six Flags Pkwy SW (Six Flags Dr SW).
Start Time: 2024-05-27T08:00:00.000-05:00
End Time: 2024-08-01T15:00:00.000-05:00
map local traffic - MAPCityview Dr SW is closed from Six Flags Pkwy SW (Six Flags Dr SW) to I-20/Riverside Pkwy SW (Six Flags Dr SW).
Cityview Dr SW is closed from Six Flags Pkwy SW (Six Flags Dr SW) to I-20/Riverside Pkwy SW (Six Flags Dr SW).
Start Time: 2024-05-27T08:00:00.000-05:00
End Time: 2024-08-01T15:00:00.000-05:00
map local traffic - MAPRoadwork on GA-154 / Memorial Dr SE from Maynard Ter (GA-154) to 2nd Ave (GA-154).
Roadwork on GA-154 / Memorial Dr SE from Maynard Ter (GA-154) to 2nd Ave (GA-154).
Start Time: 2024-06-11T08:00:00.000-05:00
End Time: 2024-06-17T07:50:33.122-05:00
map local traffic - MAPRoadwork on GA-42 / N Druid Hills Rd NE from I-85 (N Druid Hills Rd NE) to GA-13/Buford Hwy (N Druid Hills Rd NE).
Roadwork on GA-42 / N Druid Hills Rd NE from I-85 (N Druid Hills Rd NE) to GA-13/Buford Hwy (N Druid Hills Rd NE).
Start Time: 2024-05-16T13:00:44.000-05:00
End Time: 2024-06-17T07:50:33.122-05:00
map local traffic - MAPRoadwork on Riverside Pkwy from I-20/Riverside Pkwy SW (Six Flags Dr SW) to Factory Shoals Rd SW (Six Flags Dr SW).
Roadwork on Riverside Pkwy from I-20/Riverside Pkwy SW (Six Flags Dr SW) to Factory Shoals Rd SW (Six Flags Dr SW).
Start Time: 2024-04-17T14:39:14.000-05:00
End Time: 2024-06-17T07:50:33.122-05:00
map local traffic - MAPRoadwork at Moreland Ave SE.
Roadwork at Moreland Ave SE.
Start Time: 2024-06-16T05:58:13.000-05:00
End Time: 2024-06-18T22:59:00.000-05:00
map local traffic - MAPRoadwork at Moreland Ave SE.
Roadwork at Moreland Ave SE.
Start Time: 2024-06-16T05:58:13.000-05:00
End Time: 2024-06-18T22:59:00.000-05:00
map local traffic - MAPBuckhead Loop NE is closed at Tower Place Dr NE.
Buckhead Loop NE is closed at Tower Place Dr NE.
Start Time: 2024-06-17T04:31:50.000-04:00
End Time: 2024-06-19T23:59:00.000-04:00
map local traffic