    Saint Andrews Rd: road closed intermittently in New Dorp
    Road closed intermittently due to construction work on Saint Andrews Rd both ways in New Dorp.
    Start Time: 2018-10-23T15:43:00
    End Time: 2019-01-02T04:58:00
    mapdirectionslocal traffic
  • MAP
    Surf Ave: road closed from 12th St to 19th St
    Road closed due to construction work on Surf Ave both ways from 12th St to 19th St.
    Start Time: 2018-11-14T04:53:31
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    Surf Ave: road closed from 16th St to 17th St
    Road closed due to construction work on Surf Ave both ways from 16th St to 17th St.
    Start Time: 2018-11-14T04:53:31
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    17th St: road closed between Surf Ave and Mermaid Ave
    Road closed due to construction work on 17th St both ways between Surf Ave and Mermaid Ave.
    Start Time: 2018-11-14T04:53:31
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    London Rd: road closed intermittently between Meisner Ave and Terrace Ct
    Road closed intermittently due to construction work on London Rd both ways between Meisner Ave and Terrace Ct.
    Start Time: 2018-10-23T15:43:00
    End Time: 2019-01-02T04:58:00
    mapdirectionslocal traffic
  • MAP
    Tonking Rd: road closed intermittently between Tonking Rd and Rockland Ave
    Road closed intermittently due to construction work on Tonking Rd both ways between Tonking Rd and Rockland Ave.
    Start Time: 2018-09-25T12:12:00
    End Time: 2019-10-27T04:58:00
    mapdirectionslocal traffic
  • MAP
    Esther Depew St: road closed intermittently between Kent St and Scheffelin Ave
    Road closed intermittently due to construction work on Esther Depew St both ways between Kent St and Scheffelin Ave.
    Start Time: 2018-10-23T15:43:00
    End Time: 2019-01-02T04:58:00
    mapdirectionslocal traffic
  • MAP
    Meisner Ave: road closed intermittently between London Rd and Rockland Ave
    Road closed intermittently due to construction work on Meisner Ave both ways between London Rd and Rockland Ave.
    Start Time: 2018-10-23T15:43:00
    End Time: 2019-01-02T04:58:00
    mapdirectionslocal traffic
  • MAP
    12th St: road closed intermittently from Guider Ave to Lawn Ct
    Road closed intermittently due to construction work on 12th St both ways from Guider Ave to Lawn Ct.
    Start Time: 2018-10-26T04:31:05
    End Time: 2019-01-02T04:58:00
    mapdirectionslocal traffic
  • MAP
    Jefferson St: road closed intermittently between Alter Ave and Dongan Hills Ave
    Road closed intermittently due to construction work on Jefferson St both ways between Alter Ave and Dongan Hills Ave.
    Start Time: 2018-10-23T03:44:00
    End Time: 2019-01-02T04:58:00
    mapdirectionslocal traffic
  • MAP
    Garretson Ave: road closed intermittently between Hylan Blvd and Richmond Rd
    Road closed intermittently due to construction work on Garretson Ave both ways between Hylan Blvd and Richmond Rd.
    Start Time: 2018-10-23T03:44:00
    End Time: 2019-01-02T04:58:00
    mapdirectionslocal traffic
  • MAP
    Railroad Ave: road closed intermittently between Burgher Ave and Reid Ave
    Road closed intermittently due to construction work on Railroad Ave both ways between Burgher Ave and Reid Ave.
    Start Time: 2018-10-23T03:44:00
    End Time: 2019-01-02T04:58:00
    mapdirectionslocal traffic
  • MAP
    Durges St: road closed intermittently between Urbana St and Old Town Rd
    Road closed intermittently due to construction work on Durges St both ways between Urbana St and Old Town Rd.
    Start Time: 2018-10-23T03:44:00
    End Time: 2019-01-02T04:58:00
    mapdirectionslocal traffic
  • MAP
    I-278 Verrazano Narrows Bridge Upper Level W/B: right lane blocked at Lily Pond Ave
    Right lane blocked due to construction work on I-278 Verrazano Narrows Bridge Upper Level Westbound from Belt Pkwy to Lily Pond Ave.
    Start Time: 2018-11-30T07:58:25
    End Time: 2018-11-30T22:42:51
    mapdirectionslocal traffic
  • MAP
    I-278 W/B: one lane closed between 70th St and Fingerboard Rd
    One lane closed due to construction work on I-278 Westbound between 70th St and Fingerboard Rd.
    Start Time: 2018-11-30T22:00:00
    End Time: 2018-12-01T01:00:00
    mapdirectionslocal traffic
  • MAP
    Douglas Rd: road closed intermittently from Overlook Dr to Wilsonview Pl
    Road closed intermittently due to construction work on Douglas Rd both ways from Overlook Dr to Wilsonview Pl.
    Start Time: 2018-10-23T05:00:00
    End Time: 2019-01-11T04:58:00
    mapdirectionslocal traffic
  • MAP
    Douglas Ct: road closed intermittently from Douglas Ct to Douglas Rd
    Road closed intermittently due to construction work on Douglas Ct both ways from Douglas Ct to Douglas Rd.
    Start Time: 2018-10-23T05:00:00
    End Time: 2019-01-11T04:58:00
    mapdirectionslocal traffic
  • MAP
    Overlook Dr: road closed intermittently in Staten Island
    Road closed intermittently due to construction work on Overlook Dr both ways in Staten Island.
    Start Time: 2018-10-23T05:00:00
    End Time: 2019-01-11T04:58:00
    mapdirectionslocal traffic
  • MAP
    Douglas Rd: road closed intermittently at Silver Beech Rd
    Road closed intermittently due to construction work on Douglas Rd both ways at Silver Beech Rd.
    Start Time: 2018-10-23T05:00:00
    End Time: 2019-01-11T04:58:00
    mapdirectionslocal traffic
  • MAP
    Sea Gate Rd: road closed intermittently between Harbor View Pl and Wadsworth Rd
    Road closed intermittently due to construction work on Sea Gate Rd both ways between Harbor View Pl and Wadsworth Rd.
    Start Time: 2018-10-25T11:33:26
    End Time: 2019-11-01T03:58:00
    mapdirectionslocal traffic
  • MAP
    Douglas Rd: road closed intermittently at Silver Beech Rd
    Road closed intermittently due to construction work on Douglas Rd both ways at Silver Beech Rd.
    Start Time: 2018-10-23T05:00:00
    End Time: 2019-01-11T04:58:00
    mapdirectionslocal traffic
  • MAP
    Shore Acres Rd: road closed intermittently between Wadsworth Rd and Shore Acres Rd
    Road closed intermittently due to construction work on Shore Acres Rd both ways between Wadsworth Rd and Shore Acres Rd.
    Start Time: 2018-10-25T11:33:26
    End Time: 2019-11-01T03:58:00
    mapdirectionslocal traffic
  • MAP
    Twin Oak Dr: road closed intermittently from Dianas Trl to Emerson Dr
    Road closed intermittently due to construction work on Twin Oak Dr both ways from Dianas Trl to Emerson Dr.
    Start Time: 2018-10-23T05:00:00
    End Time: 2018-12-19T04:58:00
    mapdirectionslocal traffic
  • MAP
    Dianas Trl: road closed intermittently from Dianas Trl to Twin Oak Dr
    Road closed intermittently due to construction work on Dianas Trl both ways from Dianas Trl to Twin Oak Dr.
    Start Time: 2018-10-23T05:00:00
    End Time: 2018-12-19T04:58:00
    mapdirectionslocal traffic
  • MAP
    Amity St: road closed intermittently in Rosebank
    Road closed intermittently due to construction work on Amity St both ways in Rosebank.
    Start Time: 2018-10-25T11:33:26
    End Time: 2019-01-12T04:58:00
    mapdirectionslocal traffic
  • MAP
    Ridgefield Ave: road closed intermittently at Cunard Pl
    Road closed intermittently due to construction work on Ridgefield Ave both ways at Cunard Pl.
    Start Time: 2018-10-25T11:33:26
    End Time: 2019-11-08T04:58:00
    mapdirectionslocal traffic
  • MAP
    White Plains Ave: road closed intermittently between Amity St and Saint Marys Ave
    Road closed intermittently due to construction work on White Plains Ave both ways between Amity St and Saint Marys Ave.
    Start Time: 2018-10-25T11:33:26
    End Time: 2019-01-12T04:58:00
    mapdirectionslocal traffic
  • MAP
    49th St: road closed intermittently from Avenue M to Avenue N
    Road closed intermittently due to construction work on 49th St both ways from Avenue M to Avenue N.
    Start Time: 2018-11-30T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Woodside Ave: road closed intermittently in Grymes Hill
    Road closed intermittently due to construction work on Woodside Ave both ways in Grymes Hill.
    Start Time: 2018-10-25T11:33:26
    End Time: 2019-11-16T04:58:00
    mapdirectionslocal traffic
  • MAP
    39th St: road closed intermittently from Avenue K to Hubbard Pl
    Road closed intermittently due to construction work on 39th St both ways from Avenue K to Hubbard Pl.
    Start Time: 2018-11-30T05:00:00
    End Time: 2018-12-06T04:59:00
    mapdirectionslocal traffic
  • MAP
    49th St: construction work at Flatlands Ave
    Road closed intermittently due to construction work on 49th St both ways at Flatlands Ave.
    Start Time: 2018-11-30T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    39th St: road closed intermittently from Avenue J to Avenue K
    Road closed intermittently due to construction work on 39th St both ways from Avenue J to Avenue K.
    Start Time: 2018-11-30T05:00:00
    End Time: 2018-12-06T04:59:00
    mapdirectionslocal traffic
  • MAP
    32nd St: road closed intermittently from Avenue I to Avenue J
    Road closed intermittently due to construction work on 32nd St both ways from Avenue I to Avenue J.
    Start Time: 2018-11-30T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    39th St: road closed intermittently from Avenue I to Avenue J
    Road closed intermittently due to construction work on 39th St both ways from Avenue I to Avenue J.
    Start Time: 2018-11-30T05:00:00
    End Time: 2018-12-06T04:59:00
    mapdirectionslocal traffic
  • MAP
    50th St E/B: intermittent lane closures from 15th Ave to 16th Ave
    Intermittent lane closures due to construction on 50th St Eastbound from 15th Ave to 16th Ave.
    Start Time: 2018-11-28T14:18:22
    End Time: 2018-12-07T04:58:00
    mapdirectionslocal traffic
  • MAP
    NY-440 Bayonne Bridge: bridge closed from NJ-440 to Exit 13 Walker St
    Bridge closed due to bridge maintenance work on NY-440 Bayonne Bridge both ways from NJ-440 to Exit 13 Walker St.
    Start Time: 2018-11-30T21:00:00
    End Time: 2018-12-02T15:00:00
    mapdirectionslocal traffic
  • MAP
    McDonald Ave: intermittent lane closures from Ditmas Ave to Avenue F
    Intermittent lane closures due to construction on McDonald Ave both ways from Ditmas Ave to Avenue F.
    Start Time: 2018-11-28T14:10:58
    End Time: 2019-01-01T04:58:00
    mapdirectionslocal traffic
  • MAP
    Avenue F: intermittent lane closures from Dahill Rd to 2nd St
    Intermittent lane closures due to construction on Avenue F both ways from Dahill Rd to 2nd St.
    Start Time: 2018-11-28T14:10:58
    End Time: 2019-01-01T04:58:00
    mapdirectionslocal traffic
  • MAP
    Creston Pl E/B: road closed intermittently between Creston Pl and Bayview Pl
    Road closed intermittently due to construction work on Creston Pl Eastbound between Creston Pl and Bayview Pl.
    Start Time: 2018-10-25T05:00:00
    End Time: 2018-12-02T04:58:00
    mapdirectionslocal traffic
  • MAP
    Innis St: road closed intermittently from Morningstar Rd to John St
    Road closed intermittently due to construction work on Innis St both ways from Morningstar Rd to John St.
    Start Time: 2018-10-25T05:00:00
    End Time: 2018-12-22T04:58:00
    mapdirectionslocal traffic
  • MAP
    Ditmas Ave: intermittent lane closures from Dahill Rd to 2nd St
    Intermittent lane closures due to construction on Ditmas Ave both ways from Dahill Rd to 2nd St.
    Start Time: 2018-11-28T14:10:58
    End Time: 2019-01-01T04:58:00
    mapdirectionslocal traffic
  • MAP
    48th St: road closed between 10th Ave and Fort Hamilton Pkwy
    Road closed due to Crane Operation on 48th St both ways between 10th Ave and Fort Hamilton Pkwy.
    Start Time: 2018-11-30T20:00:00
    End Time: 2018-12-02T04:00:00
    mapdirectionslocal traffic
  • MAP
    48th St E/B: intermittent lane closures from 9th Ave to 10th Ave
    Intermittent lane closures due to construction on 48th St Eastbound from 9th Ave to 10th Ave.
    Start Time: 2018-11-28T14:21:23
    End Time: 2018-12-04T04:58:00
    mapdirectionslocal traffic
  • MAP
    22nd St: road closed intermittently from 22nd St to Ditmas Ave
    Road closed intermittently due to construction work on 22nd St both ways from 22nd St to Ditmas Ave.
    Start Time: 2018-10-26T04:46:51
    End Time: 2018-12-18T04:58:00
    mapdirectionslocal traffic
  • MAP
    49th St W/B: intermittent lane closures from 10th Ave to 9th Ave
    Intermittent lane closures due to construction on 49th St Westbound from 10th Ave to 9th Ave.
    Start Time: 2018-11-28T14:21:23
    End Time: 2018-12-04T04:58:00
    mapdirectionslocal traffic
  • MAP
    Avenue D: road closed intermittently from 31st St to Nostrand Ave
    Road closed intermittently due to construction work on Avenue D both ways from 31st St to Nostrand Ave.
    Start Time: 2018-11-30T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Avenue D: road closed intermittently from 31st St to 32nd St
    Road closed intermittently due to construction work on Avenue D both ways from 31st St to 32nd St.
    Start Time: 2018-11-30T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Avenue D: road closed intermittently from 34th St to New York Ave
    Road closed intermittently due to construction work on Avenue D both ways from 34th St to New York Ave.
    Start Time: 2018-11-30T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Avenue D: road closed intermittently from Brooklyn Ave to 35th St
    Road closed intermittently due to construction work on Avenue D both ways from Brooklyn Ave to 35th St.
    Start Time: 2018-11-30T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    9th Ave: road closed intermittently at 43rd St
    Road closed intermittently due to construction work on 9th Ave both ways at 43rd St.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-04T04:59:00
    mapdirectionslocal traffic
  • MAP
    7th Ave: road closed intermittently at 43rd St
    Road closed intermittently due to construction work on 7th Ave both ways at 43rd St.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-04T04:59:00
    mapdirectionslocal traffic
  • MAP
    Kermit Pl: road closed intermittently from 7th St to Ocean Pkwy
    Road closed intermittently due to construction work on Kermit Pl both ways from 7th St to Ocean Pkwy.
    Start Time: 2018-11-29T05:00:00
    End Time: 2018-12-06T04:59:00
    mapdirectionslocal traffic
  • MAP
    8th St: road closed intermittently from Caton Pl to Kermit Pl
    Road closed intermittently due to construction work on 8th St both ways from Caton Pl to Kermit Pl.
    Start Time: 2018-11-29T05:00:00
    End Time: 2018-12-06T04:59:00
    mapdirectionslocal traffic
  • MAP
    NJ-440: intermittent lane closures between New York and New Jersey
    Intermittent lane closures due to construction on NJ-440 both ways between New York and New Jersey.
    Start Time: 2018-06-11T06:15:00
    End Time: 2019-05-01T06:21:00
    mapdirectionslocal traffic
  • MAP
    Van Sinderen Ave: road closed between New Lots Ave and Linden Blvd
    Road closed due to construction work on Van Sinderen Ave both ways between New Lots Ave and Linden Blvd.
    Start Time: 2018-11-10T08:00:00
    End Time: 2019-11-10T16:00:00
    mapdirectionslocal traffic
  • MAP
    Sackman St: road closed intermittently from Hegeman Ave to New Lots Ave
    Road closed intermittently due to construction work on Sackman St both ways from Hegeman Ave to New Lots Ave.
    Start Time: 2018-10-26T04:46:51
    End Time: 2019-01-02T04:58:00
    mapdirectionslocal traffic
  • MAP
    Van Sinderen Ave: road closed from Newport St to New Lots Ave
    Road closed due to construction work on Van Sinderen Ave both ways from Newport St to New Lots Ave.
    Start Time: 2018-11-10T08:00:00
    End Time: 2019-11-10T16:00:00
    mapdirectionslocal traffic
  • MAP
    Van Sinderen Ave: road closed intermittently from New Lots Ave to Newport St
    Road closed intermittently due to construction work on Van Sinderen Ave both ways from New Lots Ave to Newport St.
    Start Time: 2018-10-26T04:46:51
    End Time: 2019-01-02T04:58:00
    mapdirectionslocal traffic
  • MAP
    18th St: road closed intermittently from 4th Ave to 5th Ave
    Road closed intermittently due to construction work on 18th St both ways from 4th Ave to 5th Ave.
    Start Time: 2018-10-26T04:46:51
    End Time: 2018-12-02T04:58:00
    mapdirectionslocal traffic
  • MAP
    Dikeman St: intermittent lane closures from Ferris St to Conover St
    Intermittent lane closures due to construction on Dikeman St both ways from Ferris St to Conover St.
    Start Time: 2018-11-28T13:53:45
    End Time: 2019-01-02T04:58:00
    mapdirectionslocal traffic
  • MAP
    Ferris St: intermittent lane closures at King St
    Intermittent lane closures due to construction on Ferris St both ways at King St.
    Start Time: 2018-11-28T13:55:32
    End Time: 2018-12-16T04:58:00
    mapdirectionslocal traffic
  • MAP
    Basilone Rd E/B: road closed between Basilone Rd and Earhart Dr
    Road closed due to long-term construction on Basilone Rd Eastbound between Basilone Rd and Earhart Dr.
    Start Time: 2017-10-04T05:17:23
    End Time: 2018-11-30T23:59:00
    mapdirectionslocal traffic
  • MAP
    Bainbridge St: road closed intermittently at Ralph Ave
    Road closed intermittently due to construction work on Bainbridge St both ways at Ralph Ave.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Decatur St: road closed intermittently at Ralph Ave
    Road closed intermittently due to construction work on Decatur St both ways at Ralph Ave.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Claver Pl: road closed intermittently from Jefferson Ave to Putnam Ave
    Road closed intermittently due to construction work on Claver Pl both ways from Jefferson Ave to Putnam Ave.
    Start Time: 2018-11-29T05:00:00
    End Time: 2018-12-04T04:59:00
    mapdirectionslocal traffic
  • MAP
    President St W/B: intermittent lane closures from Henry St to Hicks St
    Intermittent lane closures due to construction on President St Westbound from Henry St to Hicks St.
    Start Time: 2018-11-28T14:26:56
    End Time: 2019-01-02T04:58:00
    mapdirectionslocal traffic
  • MAP
    Macdonough St: road closed intermittently at Ralph Ave
    Road closed intermittently due to construction work on Macdonough St both ways at Ralph Ave.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Macon St: road closed intermittently at Ralph Ave
    Road closed intermittently due to construction work on Macon St both ways at Ralph Ave.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Halsey St: road closed intermittently at Ralph Ave
    Road closed intermittently due to construction work on Halsey St both ways at Ralph Ave.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Franklin Ave: road closed intermittently at Gates Ave
    Road closed intermittently due to construction work on Franklin Ave both ways at Gates Ave.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Hancock St: road closed intermittently at Ralph Ave
    Road closed intermittently due to construction work on Hancock St both ways at Ralph Ave.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Franklin Ave: road closed intermittently at Quincy St
    Road closed intermittently due to construction work on Franklin Ave both ways at Quincy St.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Jefferson Ave: road closed intermittently at Ralph Ave
    Road closed intermittently due to construction work on Jefferson Ave both ways at Ralph Ave.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Franklin Ave: road closed intermittently at Lexington Ave
    Road closed intermittently due to construction work on Franklin Ave both ways at Lexington Ave.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Putnam Ave: road closed intermittently at Ralph Ave
    Road closed intermittently due to construction work on Putnam Ave both ways at Ralph Ave.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Bond St: road closed intermittently from Schermerhorn St to State St
    Road closed intermittently due to construction work on Bond St both ways from Schermerhorn St to State St.
    Start Time: 2018-10-26T04:46:51
    End Time: 2018-12-12T04:58:00
    mapdirectionslocal traffic
  • MAP
    Franklin Ave: road closed intermittently at Greene Ave
    Road closed intermittently due to construction work on Franklin Ave both ways at Greene Ave.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Madison St: road closed intermittently at Ralph Ave
    Road closed intermittently due to construction work on Madison St both ways at Ralph Ave.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Nevins St: road closed intermittently from Flatbush Ave to Livingston St
    Road closed intermittently due to construction work on Nevins St both ways from Flatbush Ave to Livingston St.
    Start Time: 2018-10-26T04:46:51
    End Time: 2018-12-18T04:58:00
    mapdirectionslocal traffic
  • MAP
    Clifton Pl: road closed intermittently at Franklin Ave
    Road closed intermittently due to construction work on Clifton Pl both ways at Franklin Ave.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Monroe St: road closed intermittently at Ralph Ave
    Road closed intermittently due to construction work on Monroe St both ways at Ralph Ave.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Franklin Ave: road closed intermittently at Lafayette Ave
    Road closed intermittently due to construction work on Franklin Ave both ways at Lafayette Ave.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Dekalb Ave: road closed intermittently at Franklin Ave
    Road closed intermittently due to construction work on Dekalb Ave both ways at Franklin Ave.
    Start Time: 2018-11-28T05:00:00
    End Time: 2018-12-08T04:59:00
    mapdirectionslocal traffic
  • MAP
    Henry St: road closed intermittently from State St to Atlantic Ave
    Road closed intermittently due to construction work on Henry St both ways from State St to Atlantic Ave.
    Start Time: 2018-10-26T04:46:51
    End Time: 2018-12-05T04:58:00
    mapdirectionslocal traffic
  • MAP
    Garden Pl: road closed intermittently from Joralemon St to State St
    Road closed intermittently due to construction work on Garden Pl both ways from Joralemon St to State St.
    Start Time: 2018-10-26T04:46:51
    End Time: 2018-12-30T04:58:00
    mapdirectionslocal traffic
  • MAP
    Spencer St: road closed intermittently from Dekalb Ave to Willoughby Ave
    Road closed intermittently due to construction work on Spencer St both ways from Dekalb Ave to Willoughby Ave.
    Start Time: 2018-10-26T04:46:51
    End Time: 2018-12-18T04:58:00
    mapdirectionslocal traffic
  • MAP
    Cator Ave: resurfacing work from Ocean Ave to Garfield Ave
    Resurfacing work on Cator Ave both ways from Ocean Ave to Garfield Ave.
    Start Time: 2018-11-14T06:04:01
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    Vernon Ave: road closed intermittently from Lewis Ave to Marcus Garvey Blvd
    Road closed intermittently due to construction work on Vernon Ave both ways from Lewis Ave to Marcus Garvey Blvd.
    Start Time: 2018-10-28T05:00:00
    End Time: 2018-12-02T04:58:00
    mapdirectionslocal traffic
  • MAP
    Custer Ave: resurfacing work from County Hwy-501 John F Kennedy Blvd to Dead End
    Resurfacing work on Custer Ave both ways from County Hwy-501 John F Kennedy Blvd to Dead End.
    Start Time: 2018-11-14T06:04:01
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    Stockton St: road closed intermittently from Marcy Ave to Tompkins Ave
    Road closed intermittently due to construction work on Stockton St both ways from Marcy Ave to Tompkins Ave.
    Start Time: 2018-10-26T04:46:51
    End Time: 2019-01-02T04:58:00
    mapdirectionslocal traffic
  • MAP
    Cator Ave N/B: resurfacing work from Old Bergen Rd to County Hwy-501
    Resurfacing work on Cator Ave Northbound from Old Bergen Rd to County Hwy-501 John F Kennedy Blvd.
    Start Time: 2018-11-14T06:04:01
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    Garfield Ave: resurfacing work from Black Tom Rd to Wilkinson Ave
    Resurfacing work on Garfield Ave both ways from Black Tom Rd to Wilkinson Ave.
    Start Time: 2018-11-14T06:04:01
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    Stone St: road closed between Hanover Sq and Broad St
    Road closed due to Stone Street Pedestrian Mall on Stone St both ways between Hanover Sq and Broad St.
    Start Time: 2018-11-30T10:00:00
    End Time: 2018-11-30T23:00:00
    mapdirectionslocal traffic
  • MAP
    Mill Ln: road closed between Stone St and William St
    Road closed due to Stone Street Pedestrian Mall on Mill Ln both ways between Stone St and William St.
    Start Time: 2018-11-30T10:00:00
    End Time: 2018-11-30T23:00:00
    mapdirectionslocal traffic
  • MAP
    John St: intermittent lane closures between Dutch St and William St
    Intermittent lane closures due to construction work on John St both ways between Dutch St and William St.
    Start Time: 2018-10-17T11:28:52
    End Time: 2018-12-10T05:00:00
    mapdirectionslocal traffic
  • MAP
    Pike St: intermittent lane closures from Broadway to Allen St
    Intermittent lane closures due to construction work on Pike St both ways from Broadway to Allen St.
    Start Time: 2018-10-17T11:12:15
    End Time: 2018-12-25T05:00:00
    mapdirectionslocal traffic
  • MAP
    Chambers St: intermittent lane closures from Greenwich St to Broadway
    Intermittent lane closures due to construction work on Chambers St both ways from Greenwich St to Broadway.
    Start Time: 2018-10-17T11:40:57
    End Time: 2018-12-12T05:00:00
    mapdirectionslocal traffic
  • MAP
    Worth St E/B: intermittent lane closures from Hudson St to Lafayette St
    Intermittent lane closures due to construction on Worth St Eastbound from Hudson St to Lafayette St.
    Start Time: 2018-11-28T11:49:41
    End Time: 2019-02-11T01:00:00
    mapdirectionslocal traffic
  • MAP
    Grand Central Pkwy: intermittent lane closures at Exits 13S,13W,14,15
    Intermittent lane closures due to construction work on Grand Central Pkwy both ways between Exit 10 I-495 Long Island Expy and Exit 13 I-678 Van Wyck Expy.
    Start Time: 2018-11-30T22:00:00
    End Time: 2018-12-01T05:00:00
    mapdirectionslocal traffic
  • MAP
    Manhattan Brg Lower Roadway W/B: one lane closed between Concord St and Bowery
    One lane closed due to bridge maintenance work on Manhattan Brg Lower Roadway Westbound between Concord St and Bowery.
    Start Time: 2018-11-06T07:00:00
    End Time: 2018-12-06T23:59:00
    mapdirectionslocal traffic
  • MAP
    Suffolk St S/B: road closed from Delancey St to Grand St
    Road closed due to construction on Suffolk St Southbound from Delancey St to Grand St.
    Start Time: 2018-11-28T11:32:05
    End Time: 2020-12-31T18:59:00
    mapdirectionslocal traffic
  • MAP
    Greenwich St: intermittent lane closures from Warren St to Chambers St
    Intermittent lane closures due to construction work on Greenwich St both ways from Warren St to Chambers St.
    Start Time: 2018-10-17T11:41:33
    End Time: 2018-12-12T05:00:00
    mapdirectionslocal traffic
  • MAP
    7th St E/B: road closed from Bedford Ave to Driggs Ave
    Road closed due to construction on 7th St Eastbound from Bedford Ave to Driggs Ave.
    Start Time: 2018-11-28T11:59:03
    End Time: 2018-12-28T23:58:00
    mapdirectionslocal traffic
  • MAP
    Martin Luther King Jr Dr: resurfacing work from McAdoo Ave to Communipaw Ave
    Resurfacing work on Martin Luther King Jr Dr both ways from McAdoo Ave to Communipaw Ave.
    Start Time: 2018-11-14T06:04:01
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    Bergen Ave: resurfacing work from County Hwy-501 to Communipaw Ave
    Resurfacing work on Bergen Ave both ways from County Hwy-501 John F Kennedy Blvd to Communipaw Ave.
    Start Time: 2018-11-14T06:04:01
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    Bright St: resurfacing work from Cornelison Ave to Merseles St
    Resurfacing work on Bright St both ways from Cornelison Ave to Merseles St.
    Start Time: 2018-11-14T06:04:01
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    Saint Johns Ln: intermittent lane closures from Laight St to York St
    Intermittent lane closures due to construction work on Saint Johns Ln both ways from Laight St to York St.
    Start Time: 2018-10-17T11:43:29
    End Time: 2018-12-07T12:12:00
    mapdirectionslocal traffic
  • MAP
    Cornelison Ave: resurfacing work from Summit Ave to Wayne St
    Resurfacing work on Cornelison Ave both ways from Summit Ave to Wayne St.
    Start Time: 2018-11-14T06:04:01
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    Mulberry St: road closed intermittently from Bleecker St to Houston St
    Road closed intermittently due to construction work on Mulberry St both ways from Bleecker St to Houston St.
    Start Time: 2018-11-29T05:00:00
    End Time: 2018-12-21T04:58:00
    mapdirectionslocal traffic
  • MAP
    Wayne St: resurfacing work from Cornelison Ave to Gray St
    Resurfacing work on Wayne St both ways from Cornelison Ave to Gray St.
    Start Time: 2018-11-14T06:04:01
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    Avenue D: road closed between 12th St and 13th St
    Road closed due to construction on Avenue D both ways between 12th St and 13th St.
    Start Time: 2018-11-27T06:08:16
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    Laurel Hill Blvd: road closed from 54th Rd to 56th Rd
    Road closed due to construction work on Laurel Hill Blvd both ways from 54th Rd to 56th Rd.
    Start Time: 2018-03-05T10:16:46
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    54th Rd: road closed from 43rd St to Laurel Hill Blvd
    Road closed due to construction work on 54th Rd both ways from 43rd St to Laurel Hill Blvd.
    Start Time: 2018-10-09T04:29:54
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    54th Ave: road closed from 43rd St to Laurel Hill Blvd
    Road closed due to construction work on 54th Ave both ways from 43rd St to Laurel Hill Blvd.
    Start Time: 2018-10-09T04:29:09
    End Time: 2018-12-30T23:59:00
    mapdirectionslocal traffic
  • MAP
    14th St: intermittent lane closures from 9th Ave to 3rd Ave
    Intermittent lane closures due to construction on 14th St both ways from 9th Ave to 3rd Ave.
    Start Time: 2018-11-29T09:52:27
    End Time: 2019-01-01T04:59:00
    mapdirectionslocal traffic
  • MAP
    Duncan Ave: resurfacing work from Side Ave to Dead End
    Resurfacing work on Duncan Ave both ways from Side Ave to Dead End.
    Start Time: 2018-11-14T06:04:01
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    Pulaski Skwy S/B: exit ramp to Adams St closed.
    Exit ramp from Pulaski Skwy Southbound to Adams St closed due to construction.
    Start Time: 2018-07-11T06:15:24
    End Time: 2020-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    Pulaski Skwy S/B: exit ramp to US-1 & 9 / Raymond Blvd closed.
    Exit ramp from Pulaski Skwy Southbound to US-1 & 9 / Raymond Blvd closed due to long-term construction.
    Start Time: 2018-07-11T09:58:03
    End Time: 2020-07-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    Pulaski Skwy N/B: exit ramp to Broadway Way closed.
    Exit ramp from Pulaski Skwy Northbound to Broadway Way closed due to long-term construction.
    Start Time: 2018-07-11T05:15:30
    End Time: 2020-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    Pulaski Skwy S/B: entry ramp from Broadway Way closed.
    Entry ramp to Pulaski Skwy Southbound from Broadway Way closed due to long-term construction.
    Start Time: 2018-07-11T05:15:30
    End Time: 2020-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    Grand Central Pkwy: intermittent lane closures at Exits 10E-W,10W-E
    Intermittent lane closures due to construction work on Grand Central Pkwy both ways between Exits 13S,13W,14,15 Jackie Robinson Pkwy and Exits 10E-W,10W-E I-495 Long Island Expy.
    Start Time: 2018-11-30T11:17:23
    End Time: 2018-12-01T05:00:00
    mapdirectionslocal traffic
  • MAP
    Booraem Ave N/B: resurfacing work from Palisade Ave to Abbett St
    Resurfacing work on Booraem Ave Northbound from Palisade Ave to Abbett St.
    Start Time: 2018-11-14T06:04:01
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    I-495 Long Island Expy: intermittent lane closures at Exit 22A-E Grand Central Pkwy
    Intermittent lane closures due to construction work on I-495 Long Island Expy both ways at Exit 22A-E Grand Central Pkwy.
    Start Time: 2018-11-30T22:00:00
    End Time: 2018-12-01T05:00:00
    mapdirectionslocal traffic
  • MAP
    Abbett St N/B: resurfacing work from Booraem Ave to Ferry St
    Resurfacing work on Abbett St Northbound from Booraem Ave to Ferry St.
    Start Time: 2018-11-14T06:04:01
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    Hutton St: resurfacing work from Central Ave to Palisade Ave
    Resurfacing work on Hutton St both ways from Central Ave to Palisade Ave.
    Start Time: 2018-11-14T06:04:01
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    30th St: road closed between Thomson Ave and 47th Ave
    Road closed due to Crane Operation on 30th St both ways between Thomson Ave and 47th Ave.
    Start Time: 2018-11-30T21:30:00
    End Time: 2018-12-01T05:30:00
    mapdirectionslocal traffic
  • MAP
    29th St: road closed between Skillman Ave and 47th Ave
    Road closed due to Crane Operation on 29th St both ways between Skillman Ave and 47th Ave.
    Start Time: 2018-11-30T21:30:00
    End Time: 2018-12-01T05:30:00
    mapdirectionslocal traffic
  • MAP
    48th Ave: road closed intermittently from 108th St to 111th St
    Road closed intermittently due to construction work on 48th Ave both ways from 108th St to 111th St.
    Start Time: 2018-11-29T05:00:00
    End Time: 2018-12-02T04:58:00
    mapdirectionslocal traffic
  • MAP
    43rd St: road closed between 37th Ave and Barnett Ave
    Road closed due to Track Removal on 43rd St both ways between 37th Ave and Barnett Ave.
    Start Time: 2018-11-30T21:00:00
    End Time: 2018-12-03T04:00:00
    mapdirectionslocal traffic
  • MAP
    Park Ave Tunnel: tunnel closed from 34th St to 39th St
    Tunnel closed due to construction on Park Ave Tunnel both ways from 34th St to 39th St.
    Start Time: 2018-10-29T00:01:00
    End Time: 2018-12-31T00:01:00
    mapdirectionslocal traffic
  • MAP
    Sherman Ave N/B: resurfacing work from Ferry St to North St
    Resurfacing work on Sherman Ave Northbound from Ferry St to North St.
    Start Time: 2018-11-14T06:04:01
    End Time: 2018-12-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    31st St W/B: intermittent lane closures between 9th Ave and Dyer Ave
    Intermittent lane closures due to long-term construction on 31st St Westbound between 9th Ave and Dyer Ave.
    Start Time: 2018-10-08T05:33:25
    End Time: 2019-07-31T23:59:00
    mapdirectionslocal traffic
  • MAP
    33rd St: road closed between 10th Ave and 11th Ave
    Road closed due to long-term construction on 33rd St both ways between 10th Ave and 11th Ave.
    Start Time: 2018-10-09T04:26:49
    End Time: 2018-12-30T23:59:00
    mapdirectionslocal traffic
  • MAP
    Grand Central Pkwy: intermittent lane closures between Exit 5 and Exits 8,9E,9W
    Intermittent lane closures due to construction work on Grand Central Pkwy both ways between Exit 5 82nd St and NY-25A Northern Blvd.
    Start Time: 2018-11-30T22:00:00
    End Time: 2018-12-01T07:00:00
    mapdirectionslocal traffic
  • MAP
    57th St: intermittent lane closures from 8th Ave to Lexington Ave
    Intermittent lane closures due to construction on 57th St both ways from 8th Ave to Lexington Ave.
    Start Time: 2018-11-29T09:25:46
    End Time: 2019-01-01T04:59:00
    mapdirectionslocal traffic
  • MAP
    Grand Central Pkwy: intermittent lane closures between Exits 8,9E,9W and Exit 5
    Intermittent lane closures due to construction work on Grand Central Pkwy both ways between Exits 8,9E,9W Whitestone Expy and Exit 5 82nd St.
    Start Time: 2018-11-30T22:00:00
    End Time: 2018-12-01T05:00:00
    mapdirectionslocal traffic
  • MAP
    NJ-495 E/B: one lane closed between NJ-3 and County Hwy-501 John F Kennedy Blvd
    One lane closed due to construction on NJ-495 Eastbound between NJ-3 and County Hwy-501 John F Kennedy Blvd.
    Start Time: 2018-08-17T00:01:00
    End Time: 2020-08-17T07:00:00
    mapdirectionslocal traffic
  • MAP
    NJ-495 W/B: entry ramp from John F Kennedy Blvd intermittent ramp closures.
    Entry ramp to NJ-495 Westbound from John F Kennedy Blvd intermittent ramp closures due to construction.
    Start Time: 2018-08-10T00:01:00
    End Time: 2020-08-17T07:00:00
    mapdirectionslocal traffic
  • MAP
    83rd St: intermittent lane closures from End Ave to Lexington Ave
    Intermittent lane closures due to construction work on 83rd St both ways from End Ave to Lexington Ave.
    Start Time: 2018-10-17T11:52:05
    End Time: 2019-01-02T05:00:00
    mapdirectionslocal traffic
  • MAP
    NJ-495 E/B: entry ramp from NJ-3 E/B construction.
    Entry ramp to NJ-495 Eastbound from NJ-3 Eastbound lane closed due to construction.
    Start Time: 2018-08-17T00:01:00
    End Time: 2020-08-17T07:00:00
    mapdirectionslocal traffic
  • MAP
    Bruckner Expy N/B: exit ramp to RFK Bridge lane closed.
    Exit ramp from Bruckner Expy Northbound to RFK Bridge lane closed due to construction work.
    Start Time: 2018-09-10T04:08:17
    End Time: 2018-12-08T23:59:00
    mapdirectionslocal traffic

Thank you for using Roadnow

Roadnow US