know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along MT-roads

Constructions near Search Center

click anywhere on map to find more Constructions

 
 

Current Constructions
  • MAP
    The following road construction project is in progress: road construction with lane closures, median crossover detours, speed limit 55 mph, and width limit 16 ft until 12:30 PM Saturday, November 15, 2025. Interstate reconstruction work. Two-way traffic configuration in the westbound lanes using crossovers, reduced speed limit, and varying width restrictions due to road work on I-94 from mile post 186.7 to 192.2, between the Bad Route Interchange and Fallon. WB width restriction is 16 feet, and the EB width restriction is 13 feet. Vehicles affected by these restrictions must use an alternate route. Oversized load piloting is not available due to construction location.
    The following road construction project is in progress: road construction with lane closures, median crossover detours, speed limit 55 mph, and width limit 16 ft until 12:30 PM Saturday, November 15, 2025. Interstate reconstruction work. Two-way traffic configuration in the westbound lanes using crossovers, reduced speed limit, and varying width restrictions due to road work on I-94 from mile post 186.7 to 192.2, between the Bad Route Interchange and Fallon. WB width restriction is 16 feet, and the EB width restriction is 13 feet. Vehicles affected by these restrictions must use an alternate route. Oversized load piloting is not available due to construction location.
    Start Time: 2025-05-14T14:14:36.000-06:00
    End Time: 2025-06-02T06:43:04.693-06:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US