Constructions near Search Center
2025-06-02
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPThe following road construction project is in progress: road construction with lane closures, median crossover detours, speed limit 55 mph, and width limit 16 ft until 12:30 PM Saturday, November 15, 2025. Interstate reconstruction work. Two-way traffic configuration in the westbound lanes using crossovers, reduced speed limit, and varying width restrictions due to road work on I-94 from mile post 186.7 to 192.2, between the Bad Route Interchange and Fallon. WB width restriction is 16 feet, and the EB width restriction is 13 feet. Vehicles affected by these restrictions must use an alternate route. Oversized load piloting is not available due to construction location.
The following road construction project is in progress: road construction with lane closures, median crossover detours, speed limit 55 mph, and width limit 16 ft until 12:30 PM Saturday, November 15, 2025. Interstate reconstruction work. Two-way traffic configuration in the westbound lanes using crossovers, reduced speed limit, and varying width restrictions due to road work on I-94 from mile post 186.7 to 192.2, between the Bad Route Interchange and Fallon. WB width restriction is 16 feet, and the EB width restriction is 13 feet. Vehicles affected by these restrictions must use an alternate route. Oversized load piloting is not available due to construction location.
Start Time: 2025-05-14T14:14:36.000-06:00
End Time: 2025-06-02T06:43:04.693-06:00
map local traffic