know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along NC-roads

Constructions near Junction at Trail Six

click anywhere on map to find more Constructions

 
 

Current Constructions
  • MAP
    Contract forces will be constructing round-a-bout at the intersection of NC 49 (Elm Street) and NC 54 (Harden Street).  This work will require Walker Avenue to be permanently closed.  Motorists will utilize signed detour route for accessing Walker Avenue.
    Contract forces will be constructing round-a-bout at the intersection of NC 49 (Elm Street) and NC 54 (Harden Street).  This work will require Walker Avenue to be permanently closed.  Motorists will utilize signed detour route for accessing Walker Avenue.
    Start Time: 2025-05-25T15:34:46.000-04:00
    End Time: 2025-08-19T08:00:00.000-04:00
    maplocal traffic
  • MAP
    Bridge maintenance will be replacing pipe on Wheeler Bridge Rd.
    Bridge maintenance will be replacing pipe on Wheeler Bridge Rd.
    Start Time: 2025-05-15T09:00:34.000-04:00
    End Time: 2025-06-20T15:30:00.000-04:00
    maplocal traffic
  • MAP
    Bridge maintenance will be replacing pipe on Wheeler Bridge Rd.
    Bridge maintenance will be replacing pipe on Wheeler Bridge Rd.
    Start Time: 2025-05-15T09:00:34.000-04:00
    End Time: 2025-06-20T15:30:00.000-04:00
    maplocal traffic
  • MAP
    road closed due emergency bridge repair
    road closed due emergency bridge repair
    Start Time: 2025-01-08T14:30:00.000-05:00
    End Time: 2025-06-30T15:30:00.000-04:00
    maplocal traffic
  • MAP
    road closed due emergency bridge repair
    road closed due emergency bridge repair
    Start Time: 2025-01-08T14:30:00.000-05:00
    End Time: 2025-06-30T15:30:00.000-04:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US