Constructions near Junction at James G Witherspoon Rd

click anywhere on map to find more Constructions

 
 

Current Constructions
  • MAP
    Chestnut Hill Rd (SR 1567) will be closed on June 10th & June 11th between 9:00AM - 2:00PM for multiple Pipe Replacements. Location of Closure is south of the intersection with George McMillan Rd to the intersection with Hudler Town Rd.
    Chestnut Hill Rd (SR 1567) will be closed on June 10th & June 11th between 9:00AM - 2:00PM for multiple Pipe Replacements. Location of Closure is south of the intersection with George McMillan Rd to the intersection with Hudler Town Rd.
    Start Time: 2024-06-10T09:00:00.000-04:00
    End Time: 2024-06-11T14:00:00.000-04:00
    maplocal traffic
  • MAP
    Road closed to all activity for paving and infrastructure repairs. MTS closed btw MP 274 -276.5. Detour in place at NC 18 and US 221 to direct travelers around closure. Access to Doughton Park attractions available via NC18 and a 7-mile drive north on BRP
    Road closed to all activity for paving and infrastructure repairs. MTS closed btw MP 274 -276.5. Detour in place at NC 18 and US 221 to direct travelers around closure. Access to Doughton Park attractions available via NC18 and a 7-mile drive north on BRP
    Start Time: 2024-06-06T12:04:00.000-04:00
    End Time: 2024-07-01T12:04:00.000-04:00
    maplocal traffic
  • MAP
    Road closed to all activity for paving and infrastructure repairs. MTS closed btw MP 274 -276.5. Detour in place at NC 18 and US 221 to direct travelers around closure. Access to Doughton Park attractions available via NC18 and a 7-mile drive north on BRP
    Road closed to all activity for paving and infrastructure repairs. MTS closed btw MP 274 -276.5. Detour in place at NC 18 and US 221 to direct travelers around closure. Access to Doughton Park attractions available via NC18 and a 7-mile drive north on BRP
    Start Time: 2024-06-06T12:04:00.000-04:00
    End Time: 2024-07-01T12:04:00.000-04:00
    maplocal traffic
  • MAP
    Replacing large culvert on NC 113 350' south of the US 221 intersection.
    Replacing large culvert on NC 113 350' south of the US 221 intersection.
    Start Time: 2024-04-29T08:00:00.000-04:00
    End Time: 2024-07-26T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Replacing large culvert on NC 113 350' south of the US 221 intersection.
    Replacing large culvert on NC 113 350' south of the US 221 intersection.
    Start Time: 2024-04-29T08:00:00.000-04:00
    End Time: 2024-07-26T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Bridge replacement on Nettle Knob Road over South Beaver Creek. 
    Bridge replacement on Nettle Knob Road over South Beaver Creek. 
    Start Time: 2024-03-22T08:00:00.000-04:00
    End Time: 2024-09-14T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Bridge replacement on Nettle Knob Road over South Beaver Creek. 
    Bridge replacement on Nettle Knob Road over South Beaver Creek. 
    Start Time: 2024-03-22T08:00:00.000-04:00
    End Time: 2024-09-14T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Starting on 3/11/2024 Big Peak Creek Rd will be closed to replace two bridges. The first bridge replacement will occur at the intersection of Carson Woods Rd. After this bridge is completed and opened the contractor will be remobilizing to another structure down the road 0.5 miles from Piney Point Drive. These bridges are scheduled to be completed by 8/20/2025.   
    Starting on 3/11/2024 Big Peak Creek Rd will be closed to replace two bridges. The first bridge replacement will occur at the intersection of Carson Woods Rd. After this bridge is completed and opened the contractor will be remobilizing to another structure down the road 0.5 miles from Piney Point Drive. These bridges are scheduled to be completed by 8/20/2025.   
    Start Time: 2024-03-11T08:00:00.000-04:00
    End Time: 2025-08-20T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Starting on 3/11/2024 Big Peak Creek Rd will be closed to replace two bridges. The first bridge replacement will occur at the intersection of Carson Woods Rd. After this bridge is completed and opened the contractor will be remobilizing to another structure down the road 0.5 miles from Piney Point Drive. These bridges are scheduled to be completed by 8/20/2025.   
    Starting on 3/11/2024 Big Peak Creek Rd will be closed to replace two bridges. The first bridge replacement will occur at the intersection of Carson Woods Rd. After this bridge is completed and opened the contractor will be remobilizing to another structure down the road 0.5 miles from Piney Point Drive. These bridges are scheduled to be completed by 8/20/2025.   
    Start Time: 2024-03-11T08:00:00.000-04:00
    End Time: 2025-08-20T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Road closed to all activity for Laurel Fork Bridge Replacement. Detour in place from MP 248 (NC 18) to MP 258.7 (Northwest Trading Post).
    Road closed to all activity for Laurel Fork Bridge Replacement. Detour in place from MP 248 (NC 18) to MP 258.7 (Northwest Trading Post).
    Start Time: 2022-06-10T21:49:30.000-04:00
    End Time: 2025-06-01T13:33:00.000-04:00
    maplocal traffic
  • MAP
    ts affecting traffic will be advertised separately outside of emergency work.   
    ts affecting traffic will be advertised separately outside of emergency work.   
    Start Time: 2022-02-23T09:00:00.000-05:00
    End Time: 2025-05-17T16:00:00.000-04:00
    maplocal traffic
  • MAP
    ts affecting traffic will be advertised separately outside of emergency work.   
    ts affecting traffic will be advertised separately outside of emergency work.   
    Start Time: 2022-02-23T09:00:00.000-05:00
    End Time: 2025-05-17T16:00:00.000-04:00
    maplocal traffic