NC 180 (Cherryville Rd) Will Be Permanently Changing Alignments For The Construction Of The Shelby Bypass. Traffic Will Be Switched From The Old, Existing NC 180 Alignment Onto The New Construction Alignment On Saturday, June 1st. NC 180 Traffic Will Be Halted Temporarily To Close The Old Roadway And Switch Traffic Onto The New Roadway. NC 150 (Cherryville Rd) Will Also Be Temporarily Halted To Clear The Intersection Of NC 180 And NC 150 And Deactivate The Traffic Signal. Traffic
2024-06-25
Roadnow