Constructions near Junction at Kirkland Road
2025-08-04
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPBangor - Interstate 95 - Exit 185 North and South bound lanes Bridge replacement with ramp improvements with lane closures or full closures will be mostly done at night. They will be performing a southbound lane closure on I-95 where it passes over Broadway in Bangor on Tuesday, March 5th. This closure is scheduled to run from 9:00 a.m. until 3:00 p.m. This closure is required to accommodate the set-up of equipment and the safety of workers. Southbound traffic will be reduced to a single lane through the work zone. Northbound lanes will not be affected.
Bangor - Interstate 95 - Exit 185 North and South bound lanes Bridge replacement with ramp improvements with lane closures or full closures will be mostly done at night. They will be performing a southbound lane closure on I-95 where it passes over Broadway in Bangor on Tuesday, March 5th. This closure is scheduled to run from 9:00 a.m. until 3:00 p.m. This closure is required to accommodate the set-up of equipment and the safety of workers. Southbound traffic will be reduced to a single lane through the work zone. Northbound lanes will not be affected.
Start Time: 2025-06-20T19:40:51.000-04:00
End Time: 2026-11-06T23:00:00.000-05:00
map local traffic - MAPOrono/Old Town the bridge on route 2 will be reduced to one lane for bridge work starting June 9th, 2025.
Orono/Old Town the bridge on route 2 will be reduced to one lane for bridge work starting June 9th, 2025.
Start Time: 2025-06-20T17:10:39.000-04:00
End Time: 2025-08-22T17:00:00.000-04:00
map local traffic - MAPOrono/Old Town the bridge on route 2 will be reduced to one lane for bridge work starting June 9th, 2025.
Orono/Old Town the bridge on route 2 will be reduced to one lane for bridge work starting June 9th, 2025.
Start Time: 2025-06-10T11:51:39.000-04:00
End Time: 2025-08-22T17:00:00.000-04:00
map local traffic