Current Constructions
- MAPS.R. 72 over I-71. eastbound. Rehab bridges by repairing the backwall; replacing deck and painting structural steel (S.R. 72 over I-71). Work will be done on Orchard Grove Road over I-71 at a later date for approximately two weeks.
S.R. 72 over I-71. eastbound. Rehab bridges by repairing the backwall; replacing deck and painting structural steel (S.R. 72 over I-71). Work will be done on Orchard Grove Road over I-71 at a later date for approximately two weeks.
Start Time: 2025-04-14T11:39:00.000-04:00
End Time: 2026-07-01T00:59:00.000-04:00
map local traffic - MAPRoadwork on OH-72 / N State Route 72 from Hussey Rd/Xenia St (Maysville St/OH-72) to I-71 (OH-72).
Roadwork on OH-72 / N State Route 72 from Hussey Rd/Xenia St (Maysville St/OH-72) to I-71 (OH-72).
Start Time: 2025-06-13T05:07:00.000-04:00
End Time: 2025-06-13T09:08:57.202-04:00