Current Constructions
- MAPU.S. Route 250 Pavement Repair Project in both directions. Starting April 7, one traffic lane will be maintained on U.S. Route 250 in both directions at this location with an 11-foot width restriction.
U.S. Route 250 Pavement Repair Project in both directions. Starting April 7, one traffic lane will be maintained on U.S. Route 250 in both directions at this location with an 11-foot width restriction.
Start Time: 2025-06-17T06:13:30.000-04:00
End Time: 2025-10-31T18:00:00.000-04:00
map local traffic - MAPState Route 212 Culvert Replacement in both directions. A project to replace a culvert located just east of Tusky Valley Road. The project will require a 30-day closure of the road in both directions. Traffic will be detoured via SR 800 south to SR 211 west, SR 211 west to I-77 north, I-77 north to EXIT 93 to return to SR 212 east, and reverse.
State Route 212 Culvert Replacement in both directions. A project to replace a culvert located just east of Tusky Valley Road. The project will require a 30-day closure of the road in both directions. Traffic will be detoured via SR 800 south to SR 211 west, SR 211 west to I-77 north, I-77 north to EXIT 93 to return to SR 212 east, and reverse.
Start Time: 2025-06-09T10:56:00.000-04:00
End Time: 2025-07-10T00:59:00.000-04:00
map local traffic - MAPRoadwork on OH-800 / State Route 800 NE from Froman Hill Rd (OH-800) to OH-212 (OH-800).
Roadwork on OH-800 / State Route 800 NE from Froman Hill Rd (OH-800) to OH-212 (OH-800).
Start Time: 2025-04-24T06:40:00.000-04:00
End Time: 2025-06-21T08:21:34.835-04:00
map local traffic - MAPRoadwork on OH-800 / State Route 800 NE from OH-212 (OH-800) to Froman Hill Rd (OH-800).
Roadwork on OH-800 / State Route 800 NE from OH-212 (OH-800) to Froman Hill Rd (OH-800).
Start Time: 2025-04-23T18:39:00.000-04:00
End Time: 2025-06-21T08:21:34.835-04:00