- MAPA contractor for the NCDOT will be resurfacing all lanes of US 264 from the Pactolus Intersection to US 13. This work will utilize daily lane closures to perform the work, with no more than one lane in a single direction being closed at a time. The portion of US 264 from the fairgrounds towards US 13 will be paved during the daytime, while the intersection of US 264 and Pactolus Hwy will be paved at night near the end of the project. The contractor is going to begin by paving turn lanes before moving onto mainline paving.
A contractor for the NCDOT will be resurfacing all lanes of US 264 from the Pactolus Intersection to US 13. This work will utilize daily lane closures to perform the work, with no more than one lane in a single direction being closed at a time. The portion of US 264 from the fairgrounds towards US 13 will be paved during the daytime, while the intersection of US 264 and Pactolus Hwy will be paved at night near the end of the project. The contractor is going to begin by paving turn lanes before moving onto mainline paving.
Start Time: 2025-05-05T06:00:00.000-04:00
End Time: 2025-06-09T20:00:00.000-04:00
map local traffic - MAPWhichard Cherry Lane Road is being widened and Full Depth Reclamation (FDR) performed to improve the condition of the road. The road will be reclaimed, a seal coat applied, and the contractor will return to place the final pavement layer within 60 days of being sealed. The road will be closed except for local traffic only. The contractor will be utilizing flaggers within the road closure to assist local vehicles in navigating around the operation.
Whichard Cherry Lane Road is being widened and Full Depth Reclamation (FDR) performed to improve the condition of the road. The road will be reclaimed, a seal coat applied, and the contractor will return to place the final pavement layer within 60 days of being sealed. The road will be closed except for local traffic only. The contractor will be utilizing flaggers within the road closure to assist local vehicles in navigating around the operation.
Start Time: 2025-04-21T07:00:00.000-04:00
End Time: 2025-05-19T19:00:00.000-04:00
map local traffic - MAPWhichard Cherry Lane Road is being widened and Full Depth Reclamation (FDR) performed to improve the condition of the road. The road will be reclaimed, a seal coat applied, and the contractor will return to place the final pavement layer within 60 days of being sealed. The road will be closed except for local traffic only. The contractor will be utilizing flaggers within the road closure to assist local vehicles in navigating around the operation.
Whichard Cherry Lane Road is being widened and Full Depth Reclamation (FDR) performed to improve the condition of the road. The road will be reclaimed, a seal coat applied, and the contractor will return to place the final pavement layer within 60 days of being sealed. The road will be closed except for local traffic only. The contractor will be utilizing flaggers within the road closure to assist local vehicles in navigating around the operation.
Start Time: 2025-04-21T07:00:00.000-04:00
End Time: 2025-05-19T19:00:00.000-04:00
map local traffic - MAPA contractor for the NCDOT will be resurfacing all lanes of US 264 from the Pactolus Intersection to US 13. This work will utilize daily lane closures to perform the work, with no more than one lane in a single direction being closed at a time. The portion of US 264 from the fairgrounds towards US 13 will be paved during the daytime, while the intersection of US 264 and Pactolus Hwy will be paved at night near the end of the project. The contractor is going to begin by paving turn lanes before moving onto mainline paving.
A contractor for the NCDOT will be resurfacing all lanes of US 264 from the Pactolus Intersection to US 13. This work will utilize daily lane closures to perform the work, with no more than one lane in a single direction being closed at a time. The portion of US 264 from the fairgrounds towards US 13 will be paved during the daytime, while the intersection of US 264 and Pactolus Hwy will be paved at night near the end of the project. The contractor is going to begin by paving turn lanes before moving onto mainline paving.
Start Time: 2025-05-05T06:00:00.000-04:00
End Time: 2025-06-09T20:00:00.000-04:00
map local traffic
NC 30 constructions near Junctions/Exits
West
Junction @ NC:Strategic Highway Corridors 53(NC 11)(US 13)
Nearby city: Bethel, Oregon
Nearby Constructions
Junction @ Wadie Carson Rd
Nearby city: Bethel, Oregon
Nearby Constructions
Junction @ One Mile Rd
Nearby city: Bethel, Oregon
Nearby Constructions
Junction @ Blue Eyes Rd
Nearby city: Bethel, Oregon
Nearby Constructions
Junction @ Thigpen Rd
Nearby city: Bethel, Oregon
Nearby Constructions
Junction @ Whitehurst Station Rd
Nearby city: Robersonville, Oregon
Nearby Constructions
Junction @ Staton Mill Rd
Nearby city: Robersonville, Oregon
Nearby Constructions
Junction @ Oakley Rd
Nearby city: Robersonville, Oregon
Nearby Constructions
Junction @ Tyson St
Nearby city: Stokes, Oregon
Nearby Constructions
Junction @ John Fleming Rd
Nearby city: Stokes, Oregon
Nearby Constructions
Junction @ Worthington-Warren Rd
Nearby city: Stokes, Oregon
Nearby Constructions
Junction @ Briery Swamp Rd
Nearby city: Stokes, Oregon
Nearby Constructions
Junction @ Carl Morris Rd
Nearby city: Stokes, Oregon
Nearby Constructions
Junction @ Coy Forbes Rd
Nearby city: Greenville, Oregon
Nearby Constructions
Junction @ Satterwaite Rd
Nearby city: Stokes, Oregon
Nearby Constructions
Junction @ Bundy Rd
Nearby city: Greenville, Oregon
Nearby Constructions
Junction @ rcn 2(US 264)(NC:Strategic Highway Corridors 45)
Nearby city: Greenville, Oregon
Nearby Constructions