Constructions near Junction at Timberlodge Trl
2025-08-02
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPGRE-35-0.08 westbound. A bridge and pavement rehabilitation project on U.S. 35, between the Montgomery County line and the bridge over Grange Hall Road. U.S. 35 West traffic will be reduced to one, 12-foot lane for 90 days (through mid-September). U.S. 35 East will be maintained in two, 12-foot lanes.
GRE-35-0.08 westbound. A bridge and pavement rehabilitation project on U.S. 35, between the Montgomery County line and the bridge over Grange Hall Road. U.S. 35 West traffic will be reduced to one, 12-foot lane for 90 days (through mid-September). U.S. 35 East will be maintained in two, 12-foot lanes.
Start Time: 2025-06-17T15:15:00.000-04:00
End Time: 2026-10-01T07:00:00.000-04:00
map local traffic - MAPEastman Ave is closed from Dora Ave to Woodman Dr.
Eastman Ave is closed from Dora Ave to Woodman Dr.
Start Time: 2025-06-02T10:58:00.000-04:00
End Time: 2025-06-21T08:18:07.670-04:00
map local traffic - MAPSR 123/Community Park Drive northbound. On SR 123, between Tama Lane and Sunnybrook Drive in the city of Franklin. Construction includes realigning Community Park Drive opposite the drive to Franklin High School and building a roundabout with crosswalks.
SR 123/Community Park Drive northbound. On SR 123, between Tama Lane and Sunnybrook Drive in the city of Franklin. Construction includes realigning Community Park Drive opposite the drive to Franklin High School and building a roundabout with crosswalks.
Start Time: 2025-03-01T00:00:00.000-05:00
End Time: 2025-07-26T00:59:00.000-04:00
map local traffic - MAPRoadwork on Nicholas Rd from Danner Ave to S Broadway St/Dryden Rd.
Roadwork on Nicholas Rd from Danner Ave to S Broadway St/Dryden Rd.
Start Time: 2025-06-05T20:14:00.000-04:00
End Time: 2025-06-21T08:18:07.671-04:00
map local traffic