Constructions near Junction at Musser Rd
2024-09-24
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPRoadwork on CARTER AV both directions between WAYNE AV and SIXTH ST. All lanes closed.
Roadwork on CARTER AV both directions between WAYNE AV and SIXTH ST. All lanes closed.
Start Time: 2024-05-13T13:13:30.000-04:00
End Time: 2024-06-19T07:57:11.357-04:00
map local traffic - MAPRoadwork on CARTER AV both directions between WAYNE AV and SIXTH ST. All lanes closed.
Roadwork on CARTER AV both directions between WAYNE AV and SIXTH ST. All lanes closed.
Start Time: 2024-05-13T13:09:30.000-04:00
End Time: 2024-06-19T07:57:11.357-04:00
map local traffic - MAPRoadwork on PA 954 both directions at LOWER TWOLICK DR. There is a traffic disruption.
Roadwork on PA 954 both directions at LOWER TWOLICK DR. There is a traffic disruption.
Start Time: 2024-06-17T10:10:00.000-04:00
End Time: 2024-06-19T07:57:11.357-04:00
map local traffic - MAPRoadwork on PA 954 both directions at LOWER TWOLICK DR. There is a traffic disruption.
Roadwork on PA 954 both directions at LOWER TWOLICK DR. There is a traffic disruption.
Start Time: 2024-06-17T10:10:00.000-04:00
End Time: 2024-06-19T07:57:11.357-04:00
map local traffic - MAPRoadwork on PA 403 both directions between NEAL AV and MAIN ST, MANOR ST. There is a lane restriction.
Roadwork on PA 403 both directions between NEAL AV and MAIN ST, MANOR ST. There is a lane restriction.
Start Time: 2024-06-04T09:34:00.000-04:00
End Time: 2024-06-19T07:57:11.357-04:00
map local traffic - MAPRoadwork on PA 403 both directions between NEAL AV and MAIN ST, MANOR ST. There is a lane restriction.
Roadwork on PA 403 both directions between NEAL AV and MAIN ST, MANOR ST. There is a lane restriction.
Start Time: 2024-06-04T09:34:00.000-04:00
End Time: 2024-06-19T07:57:11.357-04:00
map local traffic