    Roadwork on I-26 E from SC-11/Exit 5 (I-26) to SC-292/Exit 10 (I-26).
    Roadwork on I-26 E from SC-11/Exit 5 (I-26) to SC-292/Exit 10 (I-26).
    Start Time: 2024-04-14T00:00:00.000-04:00
    End Time: 2024-04-19T08:18:38.811-04:00
    maplocal traffic
  • MAP
    NO LANES BLOCKED . As part of the I-85 interstate widening project, between mile points 77 and 98, expect traffic shifts and reduced lane widths within the project limits through August 2021.
    NO LANES BLOCKED . As part of the I-85 interstate widening project, between mile points 77 and 98, expect traffic shifts and reduced lane widths within the project limits through August 2021.
    Start Time: 2018-01-01T00:00:00.000-05:00
    End Time: 2024-08-31T23:59:59.000-04:00