Constructions near Junction at Earl St
2024-04-19
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPTEMPORARY LANE CLOSURES . I85 NB and SB will have temporary lane closures from 4/17 to 4/18/24 between 9 pm and 5 am.
TEMPORARY LANE CLOSURES . I85 NB and SB will have temporary lane closures from 4/17 to 4/18/24 between 9 pm and 5 am.
Start Time: 2024-04-08T00:15:00.000-04:00
End Time: 2024-04-18T23:59:59.000-04:00
map local traffic - MAP1 RIGHT LANE CLOSED . SC 290 / I-85 Intersection will be reconfigured to become a diverging diamond intersection (DDI). Constr. will consist of 6 stages, long term outer lane closures (both dir) on the bridge, and temp lane closures throughout the project at night.
1 RIGHT LANE CLOSED . SC 290 / I-85 Intersection will be reconfigured to become a diverging diamond intersection (DDI). Constr. will consist of 6 stages, long term outer lane closures (both dir) on the bridge, and temp lane closures throughout the project at night.
Start Time: 2022-06-15T00:00:00.000-04:00
End Time: 2024-06-30T23:59:59.000-04:00
map local traffic