know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along SC-roads

Constructions near Junction at Meredith Rd

click anywhere on map to find more Constructions

 
 

Current Constructions
  • MAP
    Roadwork on I-26 E from NC-108/Exit 67 W (I-26) to SC-14/Exit 1 (I-26).
    Roadwork on I-26 E from NC-108/Exit 67 W (I-26) to SC-14/Exit 1 (I-26).
    Start Time: 2024-04-22T06:00:00.000-04:00
    End Time: 2024-04-26T07:52:14.981-04:00
    maplocal traffic
  • MAP
    The left lane is closed 3 miles East of Exit 67, NC 108 (West Mills Street).
    The left lane is closed 3 miles East of Exit 67, NC 108 (West Mills Street).
    Start Time: 2024-04-22T06:00:00.000-04:00
    End Time: 2024-04-26T06:00:00.000-04:00
    maplocal traffic
  • MAP
    Roadwork on I-26 E from SC-11/Exit 5 (I-26) to SC-292/Exit 10 (I-26).
    Roadwork on I-26 E from SC-11/Exit 5 (I-26) to SC-292/Exit 10 (I-26).
    Start Time: 2024-04-22T00:00:00.000-04:00
    End Time: 2024-04-26T07:52:14.981-04:00
    maplocal traffic
  • MAP
    The NCDOT along with their Prime Contractor will be repairing and painting bridges #23 and #25 from Hunting Country Road. Several pieces of equipment will be needed to perform the work so a lane must be closed long term to provide the Contractor with adequate space.
    The NCDOT along with their Prime Contractor will be repairing and painting bridges #23 and #25 from Hunting Country Road. Several pieces of equipment will be needed to perform the work so a lane must be closed long term to provide the Contractor with adequate space.
    Start Time: 2023-08-14T07:00:00.000-04:00
    End Time: 2024-05-03T18:00:00.000-04:00
    maplocal traffic
  • MAP
    The NCDOT along with their Prime Contractor will be repairing and painting bridges #23 and #25 from Hunting Country Road. Several pieces of equipment will be needed to perform the work so a lane must be closed long term to provide the Contractor with adequate space.
    The NCDOT along with their Prime Contractor will be repairing and painting bridges #23 and #25 from Hunting Country Road. Several pieces of equipment will be needed to perform the work so a lane must be closed long term to provide the Contractor with adequate space.
    Start Time: 2023-08-14T07:00:00.000-04:00
    End Time: 2024-05-03T18:00:00.000-04:00
    maplocal traffic
  • MAP
    The NCDOT along with their Prime Contractor will be repairing and painting bridges #48 and #50 from River Road. Several pieces of equipment will be needed to perform the work so a lane must be closed long term to provide the Contractor with adequate space.  
    The NCDOT along with their Prime Contractor will be repairing and painting bridges #48 and #50 from River Road. Several pieces of equipment will be needed to perform the work so a lane must be closed long term to provide the Contractor with adequate space.  
    Start Time: 2023-08-14T07:00:00.000-04:00
    End Time: 2024-05-03T18:00:00.000-04:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US