Constructions near Junction at Mount Vernon Road
2024-04-19
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPRoadwork on I-85 S from SC-14/Exit 56 (I-85) to I-385/Exit 51 (I-85).
Roadwork on I-85 S from SC-14/Exit 56 (I-85) to I-385/Exit 51 (I-85).
Start Time: 2024-04-08T00:15:00.000-04:00
End Time: 2024-04-19T08:18:38.811-04:00
map local traffic - MAPInnovation Dr is closed from Millennium Blvd to Laurens Rd.
Innovation Dr is closed from Millennium Blvd to Laurens Rd.
Start Time: 2024-04-18T13:55:47.000-04:00
End Time: 2024-04-20T23:59:00.000-04:00
map local traffic - MAP1 RIGHT LANE CLOSED . SC 290 / I-85 Intersection will be reconfigured to become a diverging diamond intersection (DDI). Constr. will consist of 6 stages, long term outer lane closures (both dir) on the bridge, and temp lane closures throughout the project at night.
1 RIGHT LANE CLOSED . SC 290 / I-85 Intersection will be reconfigured to become a diverging diamond intersection (DDI). Constr. will consist of 6 stages, long term outer lane closures (both dir) on the bridge, and temp lane closures throughout the project at night.
Start Time: 2022-06-15T00:00:00.000-04:00
End Time: 2024-06-30T23:59:59.000-04:00
map local traffic