Constructions near Junction at New Bedford Church Rd
2024-04-24
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPRoadwork on I-26 E from NC-108/Exit 67 W (I-26) to SC-14/Exit 1 (I-26).
Roadwork on I-26 E from NC-108/Exit 67 W (I-26) to SC-14/Exit 1 (I-26).
Start Time: 2024-04-23T18:50:46.000-04:00
End Time: 2024-04-24T08:43:45.203-04:00
map local traffic - MAPThe right lane is closed 3 miles East of Exit 67, NC 108 (West Mills Street).
The right lane is closed 3 miles East of Exit 67, NC 108 (West Mills Street).
Start Time: 2024-04-22T06:00:00.000-04:00
End Time: 2024-04-26T06:00:00.000-04:00
map local traffic - MAPThe NCDOT along with their Prime Contractor will be repairing and painting bridges #48 and #50 from River Road. Several pieces of equipment will be needed to perform the work so a lane must be closed long term to provide the Contractor with adequate space.
The NCDOT along with their Prime Contractor will be repairing and painting bridges #48 and #50 from River Road. Several pieces of equipment will be needed to perform the work so a lane must be closed long term to provide the Contractor with adequate space.
Start Time: 2023-08-14T07:00:00.000-04:00
End Time: 2024-05-03T18:00:00.000-04:00
map local traffic - MAPThe NCDOT along with their Prime Contractor will be repairing and painting bridges #23 and #25 from Hunting Country Road. Several pieces of equipment will be needed to perform the work so a lane must be closed long term to provide the Contractor with adequate space.
The NCDOT along with their Prime Contractor will be repairing and painting bridges #23 and #25 from Hunting Country Road. Several pieces of equipment will be needed to perform the work so a lane must be closed long term to provide the Contractor with adequate space.
Start Time: 2023-08-14T07:00:00.000-04:00
End Time: 2024-05-03T18:00:00.000-04:00
map local traffic - MAPThe NCDOT along with their Prime Contractor will be repairing and painting bridges #23 and #25 from Hunting Country Road. Several pieces of equipment will be needed to perform the work so a lane must be closed long term to provide the Contractor with adequate space.
The NCDOT along with their Prime Contractor will be repairing and painting bridges #23 and #25 from Hunting Country Road. Several pieces of equipment will be needed to perform the work so a lane must be closed long term to provide the Contractor with adequate space.
Start Time: 2023-08-14T07:00:00.000-04:00
End Time: 2024-05-03T18:00:00.000-04:00
map local traffic