The NCDOT Along With Their Prime Contractor Will Be Repairing And Painting Bridges #48 And #50 From River Road. Several Pieces Of Equipment Will Be Needed To Perform The Work So A Lane Must Be Closed Long Term To Provide The Contractor With Adequate Space. Traffic
2024-05-01
Roadnow