know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along TX-roads

Constructions near Junction at County Road 887

click anywhere on map to find more Constructions

 
 

Current Constructions
  • MAP
    Travel lanes reduced to one lane. US96 NBML the bridge over BU-96 and BNSF railroad starting June 10, 2024, until August 30, 2024, the inside main lane will need a wide load restriction load can’t be over 14’ft. The barrier wall (4’-8”) in height.
    Travel lanes reduced to one lane. US96 NBML the bridge over BU-96 and BNSF railroad starting June 10, 2024, until August 30, 2024, the inside main lane will need a wide load restriction load can’t be over 14’ft. The barrier wall (4’-8”) in height.
    Start Time: 2024-06-10T20:52:00.000-05:00
    End Time: 2024-08-30T22:00:00.000-05:00
    maplocal traffic
  • MAP
    Roadwork on FM 2246 Rd / FM-2246 from TX-62 (FM-2246) to US-96/FM-105 (FM-2246).
    Roadwork on FM 2246 Rd / FM-2246 from TX-62 (FM-2246) to US-96/FM-105 (FM-2246).
    Start Time: 2024-06-17T18:48:30.000-05:00
    End Time: 2024-06-19T06:59:31.546-05:00
    maplocal traffic
  • MAP
    Roadwork on FM 2246 Rd / FM-2246 from US-96/FM-105 (FM-2246) to TX-62 (FM-2246).
    Roadwork on FM 2246 Rd / FM-2246 from US-96/FM-105 (FM-2246) to TX-62 (FM-2246).
    Start Time: 2024-06-13T15:07:03.000-05:00
    End Time: 2024-06-19T06:59:31.546-05:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US