Constructions near Junction at East 8th Street
2024-06-05
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPDelays due to slow moving road repair operations. Follow the marked detourConstruction of Bridge Replacement consisting of Bridge, Earthwork, Flex Base, HMAC, RipRap, Safety Lighting, Signing and Striping.
Delays due to slow moving road repair operations. Follow the marked detourConstruction of Bridge Replacement consisting of Bridge, Earthwork, Flex Base, HMAC, RipRap, Safety Lighting, Signing and Striping.
Start Time: 2024-02-05T12:15:00.000-06:00
End Time: 2026-09-23T22:45:00.000-05:00
map local traffic - MAPFM 1585 / FM-1585 is closed from Quaker Ave (FM-1585) to Indiana Ave (FM-1585).
FM 1585 / FM-1585 is closed from Quaker Ave (FM-1585) to Indiana Ave (FM-1585).
Start Time: 2024-06-03T08:40:30.000-05:00
End Time: 2024-06-05T07:42:05.229-05:00
map local traffic - MAPFM 1585 / FM-1585 is closed from Indiana Ave (FM-1585) to Quaker Ave (FM-1585).
FM 1585 / FM-1585 is closed from Indiana Ave (FM-1585) to Quaker Ave (FM-1585).
Start Time: 2024-06-03T08:36:30.000-05:00
End Time: 2024-06-05T07:42:05.229-05:00
map local traffic - MAPLanes closed to traffic, detour in place. Motorists should expect delays. For the rehabilitation and reconstruction of existing roadway. Consisting of milling SMA/HMA, full-depth reconstruction of sidewalks, curb ramps, signing and striping, drainage structures, illumination and traffic signals.
Lanes closed to traffic, detour in place. Motorists should expect delays. For the rehabilitation and reconstruction of existing roadway. Consisting of milling SMA/HMA, full-depth reconstruction of sidewalks, curb ramps, signing and striping, drainage structures, illumination and traffic signals.
Start Time: 2022-06-14T13:00:00.000-05:00
End Time: 2025-12-01T23:00:00.000-06:00
map local traffic - MAPRoadwork on 114th St from Quaker Ave to Indiana Ave.
Roadwork on 114th St from Quaker Ave to Indiana Ave.
Start Time: 2024-06-03T18:14:23.000-05:00
End Time: 2024-06-05T07:42:05.229-05:00
map local traffic - MAPRoadwork on E 19th St from State Loop 289 to E County Road 6700.
Roadwork on E 19th St from State Loop 289 to E County Road 6700.
Start Time: 2024-06-03T10:56:00.000-05:00
End Time: 2024-06-05T07:42:05.229-05:00
map local traffic - MAPRoadwork on E County Road 6700 from E County Road 6700 to State Loop 289.
Roadwork on E County Road 6700 from E County Road 6700 to State Loop 289.
Start Time: 2024-06-03T10:56:00.000-05:00
End Time: 2024-06-05T07:42:05.229-05:00
map local traffic - MAPWatch for flag personnel directing traffic. Motorists should expect delays. Loop 88 Construction
Watch for flag personnel directing traffic. Motorists should expect delays. Loop 88 Construction
Start Time: 2021-11-01T13:00:00.000-05:00
End Time: 2026-10-30T22:00:00.000-05:00
map local traffic - MAPWatch for flag personnel directing traffic. Motorists should expect delays. Loop 88 Construction
Watch for flag personnel directing traffic. Motorists should expect delays. Loop 88 Construction
Start Time: 2021-11-01T13:00:00.000-05:00
End Time: 2026-10-30T22:00:00.000-05:00
map local traffic - MAPWatch for flag personnel directing traffic. Motorists should expect delays. Loop 88 Construction
Watch for flag personnel directing traffic. Motorists should expect delays. Loop 88 Construction
Start Time: 2021-11-01T13:00:00.000-05:00
End Time: 2026-10-30T22:00:00.000-05:00
map local traffic